CN2934248Y - Front hydraulic system of tap hole of blast furnace - Google Patents

Front hydraulic system of tap hole of blast furnace Download PDF

Info

Publication number
CN2934248Y
CN2934248Y CN 200620075425 CN200620075425U CN2934248Y CN 2934248 Y CN2934248 Y CN 2934248Y CN 200620075425 CN200620075425 CN 200620075425 CN 200620075425 U CN200620075425 U CN 200620075425U CN 2934248 Y CN2934248 Y CN 2934248Y
Authority
CN
China
Prior art keywords
main pump
switching valve
pipe line
communicating pipe
petroleum pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620075425
Other languages
Chinese (zh)
Inventor
陆业永
丁小九
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin Xingcheng Special Steel Works Co Ltd
Original Assignee
Jiangyin Xingcheng Special Steel Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin Xingcheng Special Steel Works Co Ltd filed Critical Jiangyin Xingcheng Special Steel Works Co Ltd
Priority to CN 200620075425 priority Critical patent/CN2934248Y/en
Application granted granted Critical
Publication of CN2934248Y publication Critical patent/CN2934248Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The utility model relates to a blast furnace tapping machine hydraulic system, including a No. one main pump (1), a No. two main pump (2), a No. three main pump (3) and three main pump petroleum pipe lines namely a No. one main pump petroleum pipe line (9), a No. two main pump petroleum pipe line (10) and a No. three main pump petroleum pipe line (11); a switching valve (8) is arranged on the No. one main pump petroleum pipe line (9) and the No. three main pump petroleum pipe line (11), the switching valve (8) is composed of a communicating pipe (4), a switching valve (5), a switching valve (6), a switching valve (7); the No. three main pump petroleum pipe line (11) is communicated with the No. one main pump petroleum pipe line (9) by the communicating pipe (4); the switching valve (6) is arranged on the communicating pipe (4); the switching valve (5) is arranged on the No. one main pump petroleum pipe line (9) which is behind the communicating pipe (4); the switching valve (7) is arranged on the No. three main pump petroleum pipe line (11) which is behind the communicating pipe (4). All the three main pumps of the utility model can be taken as a spare pump each other by means of switching operation, the No. one main pump can replaces the No. three main pump to offer operation pressure so as to help the tapping machine to backtrack to the primary place, and therefore the vicious equipment accident can be avoided.

Description

Tap hole of blast furnace stokehold hydraulic efficiency system
Technical field:
The utility model relates to a kind of tap hole of blast furnace, especially relates to a kind of tap hole of blast furnace stokehold hydraulic efficiency system.Belong to the blast furnace steel-making technical field.
Background technology:
The stokehold hydraulic efficiency system is the propulsion source of tap hole of blast furnace work.Its 1#, 2#, 3# main pump can not be standby each other, and the 3# main pump is that control taphole drilling machine hook swings up and down, if the iron mouth is held successfully, the iron mouth flows out, 3# main pump or electric catastrophic failure, and the taphole drilling machine hook just can not lift and return raw bits.Scorch down at high temperature liquid iron like this, the short several minutes time, a taphole drilling machine that is worth 260,000 yuan will be burnt, and stops production and changes spare part also at least 5~6 hours, will produce a very large impact blast furnace production.
Summary of the invention:
The purpose of this utility model is to overcome above-mentioned deficiency, provides a kind of and can make 1#, 2#, the standby each other tap hole of blast furnace stokehold hydraulic efficiency system of 3# main pump.
The purpose of this utility model is achieved in that a kind of tap hole of blast furnace stokehold hydraulic efficiency system, comprise: the 1# main pump, the 2# main pump, 3# main pump and go out 1# main pump pipeline road, go out 2# main pump pipeline road and go out 3# main pump pipeline road, it is characterized in that: going out 1# main pump pipeline road and going out addition one switching valve group on the 3# main pump pipeline road, this switching valve group is by communicating pipe, switching valve, switching valve and switching valve constitute, to go out 1# main pump 1 pipeline road communicating pipe and go out 3# main pump 3 pipeline roads to be connected, switching valve was arranged on communicating pipe, switching valve is arranged at going out on 1# main pump 1 pipeline road behind the siphunculus in succession, and switching valve is arranged at going out on 3# main pump 3 pipeline roads behind the siphunculus in succession.
The utility model can make 1# main pump, 2# main pump, 3# main pump standby each other, and system operation is simple, convenient, as long as switch, the 1# main pump just can replace the 3# main pump to provide pressure to operate, make taphole drilling machine return raw bits, also just can avoid pernicious equipment breakdown to take place, also satisfy the big production needs of blast furnace simultaneously.
Description of drawings:
Fig. 1 is the utility model tap hole of blast furnace stokehold hydraulic system principle figure.
Among the figure: 1# main pump 1,2# main pump 2,3# main pump 3, communicating pipe 4, switching valve 5, switching valve 6, switching valve 7, switching valve group 8, go out 1# main pump 1 pipeline road 9, go out 2# main pump 2 pipeline roads 10, go out 3# main pump 3 pipeline roads 11, hook hydro-cylinder 12, other topworkies 13, clay gun valve platform 14.
Embodiment:
Referring to Fig. 1, tap hole of blast furnace stokehold hydraulic efficiency system mainly is made up of 1# main pump 1,2# main pump 2,3# main pump 3, communicating pipe 4, switching valve 5, switching valve 6 and switching valve 7.Communicating pipe 4, switching valve 5, switching valve 6 and switching valve 7 constitute switching valve group 8.
The pipeline road 9,11 that will go out 1# main pump 1 and 3# main pump 3 communicating pipe 4 is connected.Switching valve 6 was arranged on communicating pipe 4, and switching valve 5 is arranged at going out on 1# main pump 1 pipeline road 9 behind the siphunculus 4 in succession, and switching valve 7 is arranged at going out on 3# main pump 3 pipeline roads 11 behind the siphunculus 4 in succession.
Principle of work:
When 3# main pump or electric catastrophic failure, close switching valve 5, open switching valve 6, the 1# main pump just can replace the 3# main pump to provide pressure to operate, and makes taphole drilling machine turn back to raw bits.

Claims (1)

1, a kind of tap hole of blast furnace stokehold hydraulic efficiency system, comprise: 1# main pump (1), 2# main pump (2), 3# main pump (3) and go out 1# main pump 1 pipeline road (9), go out 2# main pump 2 pipeline roads (10) and go out 3# main pump 3 pipeline roads (11), it is characterized in that: going out 1# main pump 1 pipeline road (9) and going out 3# main pump (3) pipeline road (11) to go up addition one switching valve group (8), this switching valve group (8) is by communicating pipe (4), switching valve (5), switching valve (6) and switching valve (7) constitute, to go out 1# main pump (1) pipeline road (9) communicating pipe (4) and go out 3# main pump 3 pipeline roads (11) to be connected, switching valve (6) is arranged at communicating pipe on (4), switching valve (5) is arranged at going out on 1# main pump 1 pipeline road (9) behind the siphunculus (4) in succession, and switching valve (7) is arranged at going out on 3# main pump 3 pipeline roads (11) behind the siphunculus (4) in succession.
CN 200620075425 2006-07-28 2006-07-28 Front hydraulic system of tap hole of blast furnace Expired - Lifetime CN2934248Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620075425 CN2934248Y (en) 2006-07-28 2006-07-28 Front hydraulic system of tap hole of blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620075425 CN2934248Y (en) 2006-07-28 2006-07-28 Front hydraulic system of tap hole of blast furnace

Publications (1)

Publication Number Publication Date
CN2934248Y true CN2934248Y (en) 2007-08-15

Family

ID=38350936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620075425 Expired - Lifetime CN2934248Y (en) 2006-07-28 2006-07-28 Front hydraulic system of tap hole of blast furnace

Country Status (1)

Country Link
CN (1) CN2934248Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434542A (en) * 2011-12-20 2012-05-02 宜昌市燕狮科技开发有限责任公司 Automated stokehole hydraulic control system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434542A (en) * 2011-12-20 2012-05-02 宜昌市燕狮科技开发有限责任公司 Automated stokehole hydraulic control system
CN102434542B (en) * 2011-12-20 2014-08-06 宜昌市燕狮科技开发有限责任公司 Automated stokehole hydraulic control system

Similar Documents

Publication Publication Date Title
CN204985137U (en) Converter activity petticoat pipe lift hydraulic control system
CN203627375U (en) Novel drill jumbo integrated control valve block
CN2934248Y (en) Front hydraulic system of tap hole of blast furnace
CN103031957A (en) Control system and method for concrete machine
CN205918670U (en) Beat sign indicating number hydraulic press hydraulic control system
CN202100547U (en) Multipath directional valve
CN103758805A (en) Main pushing hydraulic system and tube push bench
CN202176326U (en) Mine drilling machine and automatic gas and water switching device thereof
CN201739556U (en) Hydraulic-control two-position three-way reversing valve core
CN202100551U (en) Multi-way reversing valve
CN202942821U (en) Pipeline mixer device
CN202040139U (en) Multichannel reversing valve
CN208123145U (en) Loading machine speed change operating valve energy-storage buffering component
CN201065411Y (en) Blast furnace front clay gun emergency rotating device
CN202322048U (en) Integrated rotary controlled full-load sensing multi-way valve for crane
CN206881825U (en) A kind of bimetal composite hammer
CN201351490Y (en) Throttle control device for down-the-hole drill
CN202100548U (en) Multipath reversing valve
CN2828517Y (en) Expansion joint
CN212407059U (en) Novel colliery is water pump room water pump switched systems in pit
CN202415058U (en) Rotary drilling rig and lowering speed control device for main winch of rotary drilling rig
CN210127983U (en) Synchronous control hydraulic cylinder for turning over south and north ores of blast furnace ore tank
CN202732517U (en) Safety interlocking oil way of gas-making hydraulic control valve station of gas furnace
CN201793599U (en) Emergency operating device for hydraulic clay gun of blast furnace
CN202431644U (en) Differential oil cylinder and anchor rod drill rig

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070815

EXPY Termination of patent right or utility model