CN2918540Y - Edged pyramid pile tip - Google Patents

Edged pyramid pile tip Download PDF

Info

Publication number
CN2918540Y
CN2918540Y CN 200620060789 CN200620060789U CN2918540Y CN 2918540 Y CN2918540 Y CN 2918540Y CN 200620060789 CN200620060789 CN 200620060789 CN 200620060789 U CN200620060789 U CN 200620060789U CN 2918540 Y CN2918540 Y CN 2918540Y
Authority
CN
China
Prior art keywords
pile
pyramid
stake
cone
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620060789
Other languages
Chinese (zh)
Inventor
徐醒华
徐情根
刘淑芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620060789 priority Critical patent/CN2918540Y/en
Application granted granted Critical
Publication of CN2918540Y publication Critical patent/CN2918540Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a wrapping pyramid pile toe, comprising a bottom plate of the pile toe and a cone arranged on the bottom plate of the pile toe; the cone comprises a plurality of side panels and takes the shape of a pyramid; a wrapping structure is arranged following the peripheral hem convexity of the bottom plate of the pile toe; under the coactions of the cone of the pyramid and the wrapping structure arranged on the peripheral hem convexity of the bottom plate, the instant friction between the tubular pile and the pile toe can be reduced, enabling the penetrating power of the pile toe to enhance, then the sand layer large in thickness and the earth (rock) layer minor in compressibility is penetrated by pressing (beating), which can reduce the piling dissipation of energy, improve the operating efficiency and make the pile toe reach the perfect supporting course smoothly. Furthermore, the damage to the pile body can be decreased under construction, the tremble of the ram machine and ground can be effectively decreased, the influence on other buildings and urban facilities can be decreased in the case of beating (pressing). The utility model is simple in structure and strong in practicability.

Description

A kind of bound edge pyramid stake point
Technical field
The utility model relates to the working stake point of building pipe pile foundation, is meant a kind of bound edge pyramid stake point especially.
Background technology
Along with developing rapidly of construction business, prestressing force reinforced concrete pile tube is used widely in the Foundation Design of building; General after soil layer and pile body embedded depth are determined, need usually during construction to press (beating) to designing in the bearing stratum stake point, but in the real work by pile tube, much do not reach the design bearing stratum; Yet, estimate and the desirable degree of depth also need depend on the design of stake point in order to guarantee that pile tube can reach.Traditional stake point is in the majority with taper shape usually, and its stamping press in pressing little soil (rock) the layer process of (beating) layer of sand and compressibilty is little, can't reach the expectation degree of depth; Simultaneously, consult disclosed a kind of of Chinese patent CN2501914Y again and build the square cone-shaped pile point that pipe pile foundation is used, wherein by installing crossed stiffened plate on the plate of stake pinnacle, and the base of the sharp side plate of stake joins with stake pinnacle plate, side then joins with the crossed stiffened plate side, though it strengthens certain impact force to some extent, but for little soil (rock) layer of very thick layer of sand and compressibilty, the also difficult bearing stratum that arrives ideal of stake point, so in work progress, have hidden danger, so that the vertical bearing capacity of stake does not reach designing requirement.
The utility model content
The utility model is at above-mentioned the deficiencies in the prior art, main purpose is to provide a kind of bound edge pyramid stake point, it reduces pile tube and the sharp moment frictional force of stake effectively, and has the strong effect of penetration capacity, can make a point more successfully arrive the bearing stratum of ideal; Reduce the damage of work progress simultaneously to pile body.
For realizing above-mentioned purpose, the utility model is taked following technical scheme:
A kind of bound edge pyramid stake point comprises a sharp base plate and is arranged at the cone of stake on the sharp base plate that described cone is made of jointly the polylith side plate, and is pyramid-shaped; Periphery along the sharp base plate of stake convexes with binding structure.
Described side plate is 4 to 6.Described side plate shape triangular in shape.
The horizontal internal diameter of described bound edge is greater than the tubular pile body external diameter, and and tubular pile body between have the slit.
The utility model compared with prior art, beneficial effect is to reduce pile tube and the sharp moment frictional force of stake effectively, thereby strengthen the penetration capacity of stake point, it is very thick in layer of sand and little soil (rock) layer of compressibilty to press (beating) to wear thereupon, reduce the piling energy consumption, improve efficiency of construction, and can make the stake point can arrive desirable bearing stratum smoothly, reduce the damage of work progress simultaneously to pile body, can reduce the vibrations in a machine and place effectively, when reduce pressing (beating) to the influence of other buildings and urban operating mechanism.
Description of drawings
Fig. 1 is the utility model surface structure schematic diagram;
Fig. 2 is the utility model side-looking structural representation;
Fig. 3 is that the utility model is faced structural representation;
Fig. 4 is the side-looking structural representation that the utility model cooperates tubular pile body.
The drawing reference numeral explanation:
1, the sharp base plate 2 of stake, cone 3, side plate 4, bound edge 5, tubular pile body
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
See also Fig. 1 to shown in Figure 3, a kind of bound edge pyramid stake point comprises a sharp base plate 1 and is arranged at cone 2 on the sharp base plate 1 of stake that described cone 2 is interconnected by 6 blocks of side plates 3 and forms, each side plate 3 shape triangular in shape, and this cone 2 is the hexagonal pyramid shape; Periphery along the sharp base plate 1 of stake convexes with bound edge 4 structures, can reduce the moment frictional force of pile tube and stake point by this bound edge 4, simultaneously an infiltration at the bottom of perfusion C30 concrete 1 to 2m at the bottom of the stake also can prevent.Again as shown in Figure 4, described bound edge 2 horizontal internal diameter R1 are greater than tubular pile body 5 external diameter R2, and and tubular pile body 5 between have slit L1.
The utility model design focal point is under the acting in conjunction of the binding structure that is convexly equipped with by the cone of pyramid-shaped and base plate periphery, can reduce pile tube and the sharp moment frictional force of stake, the sharp penetration capacity of stake is strengthened, press (beating) to penetrate very thick sand bed and little soil (rock) layer of compressibilty thereupon, reduce the piling energy consumption, improve efficiency of construction, and can make the stake point can arrive desirable bearing stratum smoothly.In addition, can also reduce the damage of pile body in construction, reduce the vibrations in stake machine and place effectively, when reducing piling to the influence of other buildings and urban operating mechanism.The utility model is simple in structure, practical.
In sum, it only is the preferred embodiment of the utility model bound edge pyramid stake point, be not that technical scope of the present utility model is imposed any restrictions, so every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any trickle modification, equivalent variations and modification that above embodiment did.

Claims (4)

1, a kind of bound edge pyramid stake point comprises a sharp base plate and is arranged at the cone of stake on the sharp base plate that it is characterized in that: described cone is formed by polylith side plate common combination, and is pyramid-shaped; Periphery along the sharp base plate of stake convexes with binding structure.
2, according to the described a kind of bound edge pyramid stake point of claim 1, it is characterized in that: described cone is that 4 to 6 blocks of side plates interconnect and form.
3, according to the described a kind of bound edge pyramid stake point of claim 2, it is characterized in that: described side plate shape triangular in shape.
4, according to the described a kind of bound edge pyramid stake point of claim 1, it is characterized in that: the horizontal internal diameter of described bound edge is greater than the tubular pile body external diameter, and and tubular pile body between have the slit.
CN 200620060789 2006-06-26 2006-06-26 Edged pyramid pile tip Expired - Fee Related CN2918540Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620060789 CN2918540Y (en) 2006-06-26 2006-06-26 Edged pyramid pile tip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620060789 CN2918540Y (en) 2006-06-26 2006-06-26 Edged pyramid pile tip

Publications (1)

Publication Number Publication Date
CN2918540Y true CN2918540Y (en) 2007-07-04

Family

ID=38216356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620060789 Expired - Fee Related CN2918540Y (en) 2006-06-26 2006-06-26 Edged pyramid pile tip

Country Status (1)

Country Link
CN (1) CN2918540Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906777A (en) * 2010-08-12 2010-12-08 江苏弘盛建设工程集团有限公司 Oblique cross pile shoe
CN102220762A (en) * 2011-04-25 2011-10-19 中交隧道工程局有限公司 Method and device for disposing underwater pouring concrete pile breaking accident
CN102493442A (en) * 2011-12-16 2012-06-13 浙江博雷重型机床制造有限公司 Spiral ground pile
CN104695434A (en) * 2015-02-25 2015-06-10 洛阳理工学院 Combined pile toe for steel pipe pile
CN110670588A (en) * 2019-10-12 2020-01-10 中国十九冶集团有限公司 Method for manufacturing PHC tubular pile tip
RU2803439C1 (en) * 2023-01-27 2023-09-13 Виталий Николаевич Матвийчук Drilling pile (options)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906777A (en) * 2010-08-12 2010-12-08 江苏弘盛建设工程集团有限公司 Oblique cross pile shoe
CN102220762A (en) * 2011-04-25 2011-10-19 中交隧道工程局有限公司 Method and device for disposing underwater pouring concrete pile breaking accident
CN102493442A (en) * 2011-12-16 2012-06-13 浙江博雷重型机床制造有限公司 Spiral ground pile
CN104695434A (en) * 2015-02-25 2015-06-10 洛阳理工学院 Combined pile toe for steel pipe pile
CN104695434B (en) * 2015-02-25 2016-05-18 洛阳理工学院 A kind of steel-pipe pile combined type pile top
CN110670588A (en) * 2019-10-12 2020-01-10 中国十九冶集团有限公司 Method for manufacturing PHC tubular pile tip
CN110670588B (en) * 2019-10-12 2021-06-22 中国十九冶集团有限公司 Method for manufacturing PHC tubular pile tip
RU2803439C1 (en) * 2023-01-27 2023-09-13 Виталий Николаевич Матвийчук Drilling pile (options)

Similar Documents

Publication Publication Date Title
CN2918540Y (en) Edged pyramid pile tip
CN202117068U (en) Micropile plate-type composite foundation
CN202124862U (en) Spiral-anchor plate type composite foundation
CN201176590Y (en) Wrapping cross type pile toe
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN202124863U (en) Screw anchor excavated composite foundation
CN204510246U (en) A kind of pile foundation of bearing platform plinth structure of being reinforced by the single footing of existing building
CN206267169U (en) A kind of split blade type prestressing force anchor slab
CN216713040U (en) Full-prefabricated pier type portal inclined support pile structure system
CN108560577A (en) Ocean wind-powered electricity generation stake bucket composite foundation
CN200992711Y (en) Composite building foundation
CN201420264Y (en) Overlapping #-shaped pile point
CN203080540U (en) Iron tower foundation of power transmission line
CN201176591Y (en) Wrapping sawtooth type pile toe
CN201321612Y (en) Prestressing pipe pile for buildings
CN201176592Y (en) Wrapping H-shaped pile toe
CN205617365U (en) Novel stake of reinforced concrete spiral
CN200946270Y (en) Sinking pipe bottom-expanding pile
CN200978416Y (en) Reinforced concrete bottom-enlarged prefabricated pile
CN205116208U (en) Offshore wind farm fan single pile basis
CN201526046U (en) Arc-shaped pile sharp of bordure
CN216615814U (en) Special-shaped single-pile foundation structure
CN203462436U (en) Self-locking dry barrier soil-retaining block
CN201649067U (en) Settlement reducing composite sparse pile
CN202090360U (en) Dentiform pile capable of resisting earthquake, tornado and strong storm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Dongguan Huaye Civil Foundation Engineering Co., Ltd.

Assignor: Xu Xinghua|Xu Qinggen

Contract fulfillment period: 2007.7.10 to 2016.6.25

Contract record no.: 2009440000934

Denomination of utility model: Edged pyramid pile tip

Granted publication date: 20070704

License type: Exclusive license

Record date: 20090804

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.7.10 TO 2016.6.25; CHANGE OF CONTRACT

Name of requester: DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING CO., L

Effective date: 20090804

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070704

Termination date: 20140626

EXPY Termination of patent right or utility model