CN2903262Y - Three-tube tower for communication - Google Patents

Three-tube tower for communication Download PDF

Info

Publication number
CN2903262Y
CN2903262Y CN 200620102069 CN200620102069U CN2903262Y CN 2903262 Y CN2903262 Y CN 2903262Y CN 200620102069 CN200620102069 CN 200620102069 CN 200620102069 U CN200620102069 U CN 200620102069U CN 2903262 Y CN2903262 Y CN 2903262Y
Authority
CN
China
Prior art keywords
tower
king
communication
post
joint device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620102069
Other languages
Chinese (zh)
Inventor
周开文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Heqin Communication Engineering Co., Ltd.
Original Assignee
ANCHENG COMMUNICATION ENGINEERING Co Ltd ZHEJIANG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANCHENG COMMUNICATION ENGINEERING Co Ltd ZHEJIANG filed Critical ANCHENG COMMUNICATION ENGINEERING Co Ltd ZHEJIANG
Priority to CN 200620102069 priority Critical patent/CN2903262Y/en
Application granted granted Critical
Publication of CN2903262Y publication Critical patent/CN2903262Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Support Of Aerials (AREA)
  • Details Of Aerials (AREA)
  • Elimination Of Static Electricity (AREA)

Abstract

The utility model belonging to communication equipment class, particularly relates to a three-tube tower for communication, comprising a tower base, tower columns, a cross bar, an inclined bar, an antenna frame, a lightning guard and a tower column cup joint device, which is characterized in that the steel tubes of the tower columns are connected by the tower column cup joint device which adopts equal-diameter tubes, then connected with the inclined bar through bolts, the tower body is constructed by the connection of multistage tower columns, the multistage tower columns are connected by the covered joint of the equal-diameter tubes, and then connected with the inclined bar through bolts, thereby forming a safe and firm three-tube communication tower. The utility model directly adopts the covered connection of the equal-diameter tubes, not the flanged connection, has low weight of the tower body, firm, safe and reliable connection, simple manufacture, beautiful look and good economic returns.

Description

Communication is managed towers with three
Technical field
The utility model belongs to communication device class, specifically is that a kind of communication is managed towers with three.
Background technology
The single-pipe tower that the installation structure of existing mobile communication base station antenna feeder adopt or multiple-tube column is generally connect in succession by taper sheath or flange connects, difficulty of processing is big, and profile is not attractive in appearance.
Summary of the invention
The purpose of this utility model is at the deficiencies in the prior art, provides a kind of communication simple in structure, easy to process, that cost is low, safety is firm to manage towers with three.
The technical solution of the utility model is as follows:
A kind of communication is managed towers with three, comprise tower base, king-post, cross bar, brace, antenna holder, lightning rod, king-post sleeve joint device, it is characterized in that: the king-post steel pipe adopts the king-post sleeve joint device to connect, and is connected with bolt with brace again, and the king-post sleeve joint device adopts isometrical pipe.
The utility model is reverse thinking audaciously, having changed three original pipe Tata posts adopts taper sheath to connect in succession or the flange ways of connecting, and directly adopt isometrical pipe box to connect in succession, make whole tower body in light weight, be connected firmly, safe and reliable, and easy to process, good looking appearance, good in economic efficiency.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is a king-post sleeve joint device structural representation.
The specific embodiment
As shown in Figure 1, 2, 3, a kind of communication is managed towers with three, comprise tower base 1, king-post 2, cross bar, brace 3, antenna holder 4, lightning rod 5, king-post sleeve joint device 6, it is characterized in that: king-post 2 adopts king-post sleeve joint device 6 to connect, be connected with brace 3 usefulness bolts, king-post sleeve joint device 6 adopts isometrical pipe again.
King-post 2 of the present utility model and tower base 1 are by bolton, and tower body can be formed by connecting by multistage king-post 2, and multistage king-post 2 is connect in succession by isometrical pipe box, is connected with brace 3 usefulness bolts again, make it to form the three pipe communication towers that safety is firm.

Claims (2)

1, a kind of communication is managed towers with three, comprise tower base (1), king-post (2), cross bar, brace (3), antenna holder (4), lightning rod (5), king-post sleeve joint device (6), it is characterized in that: king-post (2) steel pipe adopts king-post sleeve joint device (6) to connect, be connected with bolt with brace (3), king-post sleeve joint device (6) adopts isometrical pipe again.
2, communication according to claim 1 is managed towers with three, and it is characterized in that: tower body is formed by connecting by multistage king-post (2), and multistage king-post (2) is connect in succession by isometrical pipe box, is connected with bolt with brace (3) again.
CN 200620102069 2006-03-24 2006-03-24 Three-tube tower for communication Expired - Lifetime CN2903262Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620102069 CN2903262Y (en) 2006-03-24 2006-03-24 Three-tube tower for communication

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620102069 CN2903262Y (en) 2006-03-24 2006-03-24 Three-tube tower for communication

Publications (1)

Publication Number Publication Date
CN2903262Y true CN2903262Y (en) 2007-05-23

Family

ID=38078667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620102069 Expired - Lifetime CN2903262Y (en) 2006-03-24 2006-03-24 Three-tube tower for communication

Country Status (1)

Country Link
CN (1) CN2903262Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824932A (en) * 2010-03-23 2010-09-08 宁波天弘电力器具有限公司 Tower section of rush repair tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824932A (en) * 2010-03-23 2010-09-08 宁波天弘电力器具有限公司 Tower section of rush repair tower

Similar Documents

Publication Publication Date Title
CN203056494U (en) Wind power aluminum pipe bus fitting structure
CN204510985U (en) Inner climbing type microfluidic platform communicates three pipe towers
CN2903262Y (en) Three-tube tower for communication
CN201605868U (en) Communication tower
CN203788804U (en) Design of wind-resistant and snow-resistant sunlight greenhouse framework
CN2764870Y (en) Three-pipe tower for communication
CN2874798Y (en) Triangle self standing tower for communication
CN205591507U (en) Scaffold frame of easily dismantling
CN204899374U (en) Low -cost television tower
CN209586591U (en) A kind of wind power tower drum
CN207004140U (en) A kind of anchor ear pole
CN203701282U (en) Pre-buried channel and support structure matched with same
CN202788131U (en) Single tube communication tower platform
CN202969583U (en) Connecting structure of pole tower and basic connecting piece
CN201568221U (en) Breeze generator
CN201434476Y (en) Mounting bracket of out-door air-conditioner
CN205933024U (en) Perpendicular transport means of photovoltaic power generation component
CN2566623Y (en) Assembly environmental protection energy-saving greenhouse
CN201141225Y (en) Integrated single tube tower for communication
CN213205157U (en) Quick concatenation formula 5G power transmission tower construct support
CN214005993U (en) Modularization cold-formed thin-walled steel integrated house convenient to equipment
CN201165766Y (en) Three pipes communication tower
CN202745456U (en) Large Y-shaped angle steel tower
CN203160486U (en) Overhung curtain wall combining steel structure with aluminum structure
CN202431462U (en) Conveniently-dismounted novel wind driven generator tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHEJIANG HEQIN COMMUNICATION ENGINEERING LTD.

Free format text: FORMER NAME OR ADDRESS: ZHEJIANG ANCHENG COMMUNICATION ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: 321017 Zhejiang Province, Jinhua City Road 298

Patentee after: Zhejiang Heqin Communication Engineering Co., Ltd.

Address before: 321017 Zhejiang Province, Jinhua City Road 298

Patentee before: Ancheng Communication Engineering Co., Ltd., Zhejiang

CX01 Expiry of patent term

Granted publication date: 20070523

EXPY Termination of patent right or utility model