CN2871868Y - Wheel installation structure on front end for gasoline engine - Google Patents

Wheel installation structure on front end for gasoline engine Download PDF

Info

Publication number
CN2871868Y
CN2871868Y CN 200620109814 CN200620109814U CN2871868Y CN 2871868 Y CN2871868 Y CN 2871868Y CN 200620109814 CN200620109814 CN 200620109814 CN 200620109814 U CN200620109814 U CN 200620109814U CN 2871868 Y CN2871868 Y CN 2871868Y
Authority
CN
China
Prior art keywords
belt
belt wheel
wheel
generator
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620109814
Other languages
Chinese (zh)
Inventor
王锐
成卫国
闵龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Changan Automobile Co Ltd
Original Assignee
Chongqing Changan Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Changan Automobile Co Ltd filed Critical Chongqing Changan Automobile Co Ltd
Priority to CN 200620109814 priority Critical patent/CN2871868Y/en
Application granted granted Critical
Publication of CN2871868Y publication Critical patent/CN2871868Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)

Abstract

The utility model relates to a wheel train structure at the front end of gasoline engine, which comprises a belt, a belt wheel for generator, a belt wheel for water pump, a belt wheel for power steering pump, two idler wheels and an automatic tensioner which is used to ensure the invariableness of multi-wedge belt extension or shortening tension. The working surfaces of all the above wheels are arranged in the same plane and the crankshaft belt wheel, the water pump belt, the compressor belt wheel, the No.1 idler wheel, the generator belt wheel, power steering pump belt wheel, the No.2 idler wheel, the water pump belt wheel and the automatic tensioner are surrounded orderly by a belt to realize the connection. The main components of the engine-generator, the water pump, the compressor and the power steering pump are driven by a belt, the working surfaces of all the wheels are in the same plane, the axial dimensions of the crankshaft belt wheel is reduced, so the arrangement of the wheel train is compact, the volume of the engine is reduced so that the operation of the wheel train is more reliable and belt driving efficiency of the engine is improved, also the installation process is more convenient, rapid and accurate.

Description

Petrol engine front end train mounting structure
Technical field:
The utility model belongs to the petrol engine machine technology, is specifically related to the front end train mounting structure of multi cylinder petrol engine.
Background technique:
The layout of available engine front end train, adopt grading type mostly, referring to Fig. 1, it adopts two belt 12A and 12B to realize, article one, belt 12A connects crank pulley 14, Water-pump belt wheel 11 and generator belt wheel 16, and another belt 12B connects crank pulley 14, compressor belt wheel 15 and boost pump belt wheel 13, and their working surface does not in one plane all drive its running work by crank pulley simultaneously.So just need axially doing crank pulley thick especially, both increased the axial dimension of motor, increased the motor total quality, and made motor become huge, be unfavorable for the layout of motor on car load, the development trend of run counter to the motor miniaturization, gently changing most.Increase mounting process and labor intensity simultaneously, thereby increased exploitation and manufacture cost greatly.
Summary of the invention:
The purpose of this utility model is at existing petrol engine front end train the problem that exists to be installed, a kind of petrol engine front end train mounting structure is provided, train is carried out the layout of compact and reasonable, improve the reliability and the motor band transmission efficiency of train wheel operation, make the easier, quick, accurate of mounting process.
In order to realize this purpose, the utility model has adopted following technological scheme:
Petrol engine front end train mounting structure includes belt, generator belt wheel, Water-pump belt wheel, compressor belt wheel, boost pump belt wheel, two idle pulleys and one and is used to guarantee that poly Vbelt elongates or shortens all constant automatic tensioner of tension force.Working surface design of above-mentioned each wheel in a plane, and is walked around crank pulley, compressor belt wheel, No. 1 idle pulley, generator belt wheel, boost pump belt wheel, No. 2 idle pulleys, Water-pump belt wheel and auto-tensionings successively with a belt and taken turns, they are connected.
The utility model is with the primary component of motor---and generator, water pump, compressor and boost pump etc. are with a belt transmission, the working surface of each wheel is in a plane, reduced crank pulley at axial dimension, make the layout compactness of train, the motor volume reduces, thereby makes train wheel operation more reliable.Improved motor band transmission efficiency, also made mounting process easier, quick, accurate simultaneously.
Description of drawings
Fig. 1 is existing petrol engine front end train mounting structure schematic representation
Fig. 2 is the petrol engine front end train mounting structure schematic representation that the utility model proposes
Embodiment:
Referring to Fig. 2, this petrol engine front end train mounting structure includes generator belt wheel 24, Water-pump belt wheel 26, compressor belt wheel 22, boost pump belt wheel 25, two idle pulleys, 27 and belts 28 of an auto-tensioning wheel.The working surface of above-mentioned each wheel is designed in the plane, and belt 28 is walked around crank pulley 21,22, No. 1 idle pulley 23A of compressor belt wheel, generator belt wheel 24,25, No. 2 idle pulley 23B of boost pump belt wheel, Water-pump belt wheel 26 and auto-tensioning wheel 27 successively.
Installation process:
1, crank pulley 21 is installed on the bent axle, and uses bolton;
2, Water-pump belt wheel 26 is installed on the water pump links to each other, and guarantee that it installs reliable, fastening with engine cylinder-body;
3, generator, No. 1 idle pulley 23A, boost pump, auto-tensioning wheel 27 and a compressor that is used to change the belt trend are installed in generator support bracket, and all use corresponding bolts fastening;
4, another No. 2 idle pulley 23B that regulate trend are installed on the motor head carriage, and use bolton;
5, last, with front end train belt 28 from crank pulley 21, after walking around 22, No. 1 idle pulley 23A of compressor belt wheel, generator belt wheel 24,25, No. 2 idle pulley 23B of boost pump belt wheel, Water-pump belt wheel 26 and auto-tensioning wheel 27 successively more by hand, the tension arms lock pin of auto-tensioning wheel 27 is extracted, thus the auto-tensioning of realization belt 28.
Correct and reliable for guaranteeing that train is installed, in rotatable 2 to 3 weeks of engine crankshaft, check whether the relation between belt and each belt wheel reaches the design and installation requirement.

Claims (1)

1, petrol engine front end train mounting structure includes belt, generator belt wheel, Water-pump belt wheel, compressor belt wheel, boost pump belt wheel, idle pulley and automatic tensioner; It is characterized in that: working surface design of above-mentioned each wheel and is walked around crank pulley, compressor belt wheel, No. 1 idle pulley, generator belt wheel, boost pump belt wheel, No. 2 idle pulleys, Water-pump belt wheel and auto-tensionings wheels successively by a belt they is coupled together in a plane.
CN 200620109814 2006-01-20 2006-01-20 Wheel installation structure on front end for gasoline engine Expired - Lifetime CN2871868Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620109814 CN2871868Y (en) 2006-01-20 2006-01-20 Wheel installation structure on front end for gasoline engine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620109814 CN2871868Y (en) 2006-01-20 2006-01-20 Wheel installation structure on front end for gasoline engine

Publications (1)

Publication Number Publication Date
CN2871868Y true CN2871868Y (en) 2007-02-21

Family

ID=37740215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620109814 Expired - Lifetime CN2871868Y (en) 2006-01-20 2006-01-20 Wheel installation structure on front end for gasoline engine

Country Status (1)

Country Link
CN (1) CN2871868Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102673355A (en) * 2012-05-23 2012-09-19 东方电气集团东风电机有限公司 Compact power assembly for electric automobile
CN104074606A (en) * 2014-07-05 2014-10-01 广西玉柴机器股份有限公司 Transmission structure of engine front end wheel train
CN111980800A (en) * 2020-09-18 2020-11-24 重庆飞龙江利汽车部件有限公司 Engine front end wheel train mounting structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102673355A (en) * 2012-05-23 2012-09-19 东方电气集团东风电机有限公司 Compact power assembly for electric automobile
CN104074606A (en) * 2014-07-05 2014-10-01 广西玉柴机器股份有限公司 Transmission structure of engine front end wheel train
CN111980800A (en) * 2020-09-18 2020-11-24 重庆飞龙江利汽车部件有限公司 Engine front end wheel train mounting structure

Similar Documents

Publication Publication Date Title
CN2861510Y (en) Automobile engine
CN206309475U (en) The accessory wheel system of BSG hybrid power engines
CN2871868Y (en) Wheel installation structure on front end for gasoline engine
CN101368509B (en) Belt transmission wheel series of engine
CN205190656U (en) Explosive motor and tensioning assembly who is used for explosive motor
CN107524488A (en) A kind of automobile with small output volumn engine chain timing system
CN201753633U (en) Belt transmission system for vehicle engine
CN107587909A (en) A kind of diesel engine Dual Over Head Camshaft and engine oil pump drive system
CN202832778U (en) Diesel engine timing chain drive mechanism
CN201896662U (en) Belt drive system of heavy-duty diesel engine accessory
CN201963367U (en) Timing transmission mechanism provided with variable valve timing controller and used for gasoline engine
CN201802486U (en) Engine train structure
CN204691900U (en) Motor front-end wheel system transmission system
CN201461088U (en) Wheel train arrangement of mechanically supercharged engine
CN2835597Y (en) Chain transmission device of diesel engine for vehicle
CN103122789A (en) Auxiliary engine driving device of internal-combustion engine
CN101196138A (en) Engine belt transmission wheel series
CN2903419Y (en) Diesel engine front belt driving apparatus
CN201232583Y (en) Novel belt drive wheel train
CN2849331Y (en) Transmission structure for gasoline engine, crankshaft pulley, water pump pulley and generator pulley
CN208364194U (en) Driving mechanism for oil pump
CN201778892U (en) Engine automatic transmission device
CN201162571Y (en) Engine fittings driven chain system
CN201934160U (en) Novel engine timing chain system
CN203925740U (en) A kind of diesel engine front end train

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070221

EXPY Termination of patent right or utility model