CN2866431Y - Shaft composite hoisting device - Google Patents
Shaft composite hoisting device Download PDFInfo
- Publication number
- CN2866431Y CN2866431Y CN 200520019950 CN200520019950U CN2866431Y CN 2866431 Y CN2866431 Y CN 2866431Y CN 200520019950 CN200520019950 CN 200520019950 CN 200520019950 U CN200520019950 U CN 200520019950U CN 2866431 Y CN2866431 Y CN 2866431Y
- Authority
- CN
- China
- Prior art keywords
- weight
- bob
- stable equilibrium
- lifting container
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model relates to a shaft composite lifting device, in particular to a lifting device for lifting personnel and material on the mine. The utility model is characterized in that: above a balance weight is provided with a floating balance weight which is connected with a hoisting container via a wire rope and a directive wheel, wherein, the directive wheel is connected with another lifting container; the floating balance weight is separated and kept a certain distance from the fixed balance weight; according to the depth of the well, a tail rope can be arranged between the floating balance weight and the lifting container. The fixed balance weight can be the lifting container. The utility model has the advantages of the less investment, the low unit electricity consumption, the safety and the reliability. The hoist capacity or the hoist depth may be increased greatly, even if the prior hoist is used.
Description
Technical field
The utility model is the compound bont of a kind of vertical shaft, the particularly bont of mine hoisting personnel and material.
Background technology
The bont of existing mine hoisting personnel and material includes gig, lifting container and head sheave and steel rope, and its lifting container has cage, skip bucket and cage---array configuration of skip bucket etc.Gig has single wire winding type double-drum hoist and the wheeled gig of multi-rope friction, and the side that lifting container has is a bob-weight.Lifting container is fixed on the gig by steel rope, head sheave, and perhaps lifting container links to each other with the opposite side lifting container by steel rope, friction wheel.When gig started, lifting container rose, and another lifting container descends simultaneously.Otherwise, lifting container descends then, and another lifting container rises, this its hoisting capacity of bont 50% shared by the quality of lifting container own, and in mining design, once determine, thereby hoisting capacity is also determined thereupon, but the mine all is faced with mining depth and strengthens year by year, and productive capacity increases and necessarily requires to strengthen the problem of hoisting capacity.
In order to address this problem, the common practice is to open up vertical shaft again, but its investment is big, long in time limit, and the way that the mine that also has takes to change lifting means increases hoisting capacity, but because lifting means costs an arm and a leg, not only investment is big, and influences ordinary production.
Publish China Construction Industry Press in August, 1988 " mining design handbook the 4th volume discloses a kind of three head sheave elevator system, its concrete structure is to add steel cable again to link to each other between two lifting containers, this root steel rope directly strides across the 3rd head sheave without gig and is connected to each other, purpose is exactly in order to balance the deadweight of lifting container mutually, to make the lifting container deadweight not enter gig.But this three head sheaves promote owing to the decline along with lifting container of the rope capacity of balance two lifting containers increases, the rising of lifting container and reducing, therefore this root steel rope changes in the weight of every side, this variation is certain to be reacted to gig and gets on, lifting container is when the shaft bottom, and the deadweight of opposite side lifting container will be balanced some more, if lifting container is on top, then the deadweight meeting of opposite side lifting container is balanced less, and this upwards promotes loaded vehicle is disadvantageous.And because the difference of steel rope creep elongation amount, the tension force between three steel ropes is difficult for regulating suitably.If the steel rope of bob-weight side is broken at well head simultaneously, then because the weight of bob-weight is affirmed the lifting container greater than opposite side, at this moment bob-weight except own to falling in the shaft bottom, because it links to each other with the lifting container of opposite side by balance rope, therefore, the lifting container of opposite side just can be balanced steel rope and haul rapid rising, thereby produces serious accident.
Goal of the invention
The purpose of this utility model is to avoid the weak point of above-mentioned prior art, make the lifting container deadweight not take or take less the loading of hoisting cable terminal and provide a kind of, reduce lifting container taking to hoisting capacity, make the lifting container quality of minimizing be converted into the lifting capacity weight, thereby increase hoisting capacity, increase the compound bont that promotes the degree of depth, this plant investment is few, power consumption is low, safety factor is big, does not influence ordinary production.
Summary of the invention
The purpose of this utility model is achieved in that and is promoting the original bob-weight of bob-weight compartment (stable equilibrium hammer) top, increase a unsteady bob-weight, by two balance head ropes, two track adjusting wheels that derrick increases newly and the lifting container of opposite side link to each other, and increase by two tail ropes in unsteady bob-weight and lifting container bottom and link to each other.Float bob-weight above the stable equilibrium hammer, the two maintains certain distance, in normal lifting process, can not come in contact, the bob-weight weight of floating all the time can the balance opposite side the lifting container deadweight, and between unsteady bob-weight and stable equilibrium hammer, being equipped with shock absorber, when preventing emergency braking, fierce collision takes place in the two.The bob-weight that floats slides on stable equilibrium hammer slideway, and the stable equilibrium hammer moves on the vertical shaft cage guide.When stable equilibrium hammer hoisting cable took place by disconnected the rope, the stable equilibrium hammer was understood self and is fallen, and can not drive the bob-weight that floats and fall.In order to make the two head rope stress equalizations of bob-weight that float, on two head ropes, one end lifting container, be provided with adjusting rope device.Said stable equilibrium hammer also can be a lifting container.
The invention advantage
The utility model compared with prior art has following advantage:
1, because the fixing invalid load in the lifting process all is balanced, only remaining capacity weight (ore) and movable invalid load (mine car) are moved, and therefore can alleviate the quality of elevator system motion parts greatly.The weight that outstanding more a bit is is balanced does not enter in the working process of gig and goes, and just is balanced outside gig, therefore in the whole service process, can adopt original gig, and hoisting capacity increases considerably.
2, the compound bont of vertical shaft because lifting container has main rope and three wire rope suspensionings of head rope, has double insurance to lifting container except that lifting container is had the general various safety performances, free accident of cage crashing can not take place, and is therefore, safe and reliable.
3, this compound bont small investment, the unit power consumption amount is low, because the increase facility is few, is ground construction again, and is therefore easy to install, and the construction time is short, does not influence ordinary production.
Description of drawings
Accompanying drawing 1 is the utility model fundamental diagram
Accompanying drawing 2 is the utility model structural representation
Accompanying drawing 3 is the vertical shaft planar view
Accompanying drawing 4 is the 2-2 cutaway view in the accompanying drawing 1 for lifting container suspention scheme drawing
Accompanying drawing 5 is the cutaway view Amplified image of 3-3 in the accompanying drawing 1 for stable equilibrium hammer, the bob-weight suspention scheme drawing that floats.
Accompanying drawing 6 is the 4-4 cutaway view of accompanying drawing 2, is stable equilibrium hammer slideway picture.
Accompanying drawing 7 is the 5-5 cutaway view in the accompanying drawing 2, is the bob-weight slideway picture that floats.Accompanying drawing 8 is gig figure.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described:
With reference to accompanying drawing 1,2, on derrick, be fixed with head sheave (3,4), track adjusting wheel (9,10), said track adjusting wheel (9,10) they are to aim at lifting container (2) and unsteady bob-weight (8) balance head rope (11) guiding usefulness between the two.Lifting container (2) and unsteady bob-weight (8) are between the two, link to each other by two balance tail ropes in two balance head ropes in top (11) and bottom (12), they form the balanced system of rope more than, therefore, balance head rope (11), lifting container (2) and unsteady bob-weight (8), balance tail rope (12) do not produce the static(al) effect to gig (5).
Stable equilibrium hammer (1) in the compound bont is positioned at the bottom of unsteady bob-weight (8), and said stable equilibrium hammer (1) also can be a lifting container, fixes with hoisting cable (6), fixedly is wrapped on the gig (5) through head sheave (3).Referring to accompanying drawing 4, lifting container (2) fixes with hoisting cable (7), fixedly is wrapped on the gig (5) through head sheave (4).The bob-weight (8) that floats is not connected with hoisting cable (6).Both separate and possess certain distance unsteady bob-weight (8) and stable equilibrium hammer (1), and the centre is added with shock absorber (17), this distance is decided by the creep extension amount of hoisting cable (6,7) with balance rope (11), guarantee that in normal lifting process, the bob-weight (8) that floats does not bump with stable equilibrium hammer (1) and contacts.Referring to accompanying drawing 6, stable equilibrium hammer (1) is gone up operation at vertical shaft wooden cage guide (16).Referring to accompanying drawing 7, the bob-weight (8) that floats slides on stable equilibrium hammer slideway (13).Restrict when stable equilibrium hammer steel rope (6) takes place to break, stable equilibrium hammer (1) self falls, and can not drive unsteady bob-weight (8) and fall together.Possess certain distance in order to make unsteady bob-weight (8) and stable equilibrium hammer (1) into shape, and make unsteady (8) two balance head ropes of bob-weight (11) stress equalization, on an end lifting container (2) of head rope (11), be provided with adjusting rope device (18).
Compound bont uses in existing elevator system, makes elevator system become two cover elevator system by a cover single-rope hoisting system, and this two covers elevator system is born the lifting task jointly.Wherein a cover elevator system (balanced system of restricting) is made up of lifting container, head rope, track adjusting wheel, the bob-weight that floats, tail rope more, mainly bears the lifting of lifting container deadweight; Another set of elevator system is single rope power system, form by lifting container, hoisting cable, head sheave, stable equilibrium hammer, gig, mainly bear the lifting of capacity weight (mine car, ore), many rope balanced systems itself do not have power not have gig yet, it moves with the operation of another set of elevator system, play the effect that reduces suffered biggest quiet tension of gig and biggest quiet tension difference, thereby make the gig upgrading, reach the purpose that increases hoisting capacity.
Claims (5)
1, the compound bont of a kind of vertical shaft, include gig (5), lifting container (2) and head sheave (3,4), and hoisting cable (6,7), it is characterized in that: on derrick, also be provided with track adjusting wheel (9,10), two balance ropes (11) are suspended on the track adjusting wheel (9,10), lifting container (2) and unsteady bob-weight (8) are between the two, link to each other by two balance ropes in top (11), in order to offset the weight of balance rope (11), there is balance tail rope (12) to link to each other in lifting container (2) and unsteady bob-weight bottom.
2, the compound bont of vertical shaft according to claim 1, the bob-weight (8) that it is characterized in that floating is positioned at the top that (1) is hammered in stable equilibrium into shape, do not fix with hoisting cable (6), the bob-weight slideway (15) that floats slides on stable equilibrium hammer guide rail (13), stable equilibrium hammer slideway (14) is gone up operation at vertical shaft wooden cage guide (16), when disconnected rope takes place in stable equilibrium hammer hoisting cable (6), stable equilibrium hammer (1) falls, do not influence unsteady bob-weight (8), i.e. stable equilibrium hammer (1) separates with unsteady bob-weight (8).
3, the compound bont of vertical shaft according to claim 2, the bob-weight (8) that floats has certain distance between the two with stable equilibrium hammer (1), is added with a shock absorber (17) between the two.
4, according to claim 2 or the compound bont of 3 described vertical shafts, it is characterized in that: stable equilibrium hammer (1) also can be a lifting container.
5, according to claim 1 or the compound bont of 2 or 3 described vertical shafts, for make two balance ropes (11) stressed evenly, on lifting container (2) or unsteady bob-weight (8), be provided with adjusting rope device (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520019950 CN2866431Y (en) | 2005-05-06 | 2005-05-06 | Shaft composite hoisting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520019950 CN2866431Y (en) | 2005-05-06 | 2005-05-06 | Shaft composite hoisting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2866431Y true CN2866431Y (en) | 2007-02-07 |
Family
ID=37702134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520019950 Expired - Lifetime CN2866431Y (en) | 2005-05-06 | 2005-05-06 | Shaft composite hoisting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2866431Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102491156A (en) * | 2011-12-15 | 2012-06-13 | 吕宏业 | Double-acting hoist |
-
2005
- 2005-05-06 CN CN 200520019950 patent/CN2866431Y/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102491156A (en) * | 2011-12-15 | 2012-06-13 | 吕宏业 | Double-acting hoist |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102275799B (en) | Mine elevator | |
CN201250069Y (en) | Counterweight self-balancing crane | |
CN105939955B (en) | Low structure trolley for steel cable elevator | |
CN101343021A (en) | Large-scale full-turning offshore platform crane | |
CN201560066U (en) | Novel light loading and unloading gantry crane | |
CN201264870Y (en) | Bridge type aluminum discharge cart | |
CN201261694Y (en) | Large-scale full-turning offshore platform crane | |
CN112299202A (en) | Car stabilizing device for multi-car intelligent parallel elevator | |
CN205634654U (en) | Sports car structure of cable crane hoist | |
CN2866431Y (en) | Shaft composite hoisting device | |
CN105757625A (en) | High rod illuminating and lifting system with speed limiting and falling preventing functions | |
CN2373420Y (en) | Composite lifting system | |
CN105645275B (en) | Cable hoist and its construction method | |
CN102491156A (en) | Double-acting hoist | |
JP4825368B2 (en) | Elevator equipment | |
CN206035002U (en) | Mechanical parking device hoist mechanism | |
CN1261342C (en) | Elevator colsed van | |
CN213202043U (en) | Elevator with circulation compensation chain | |
CN201952091U (en) | Double acting hoister | |
CN2298232Y (en) | Safety device for elecvator | |
CN203229328U (en) | Installation structure for overload limiter of ship unloader | |
CN208761935U (en) | A kind of lever elevator compensation chain balance mechanism | |
CN2125572U (en) | Lifting device | |
CN220432167U (en) | Mine lifting machine | |
CN2758222Y (en) | Self stress bridge type and gantry type crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |
Expiration termination date: 20150506 Granted publication date: 20070207 |
|
DD01 | Delivery of document by public notice |
Addressee: Zhang Xuemei Document name: Notification of Expiration of Patent Right Duration |