CN2838731Y - Horizontal flow absorption column integrated flue gas desulfurization apparatus - Google Patents

Horizontal flow absorption column integrated flue gas desulfurization apparatus Download PDF

Info

Publication number
CN2838731Y
CN2838731Y CN 200520074528 CN200520074528U CN2838731Y CN 2838731 Y CN2838731 Y CN 2838731Y CN 200520074528 CN200520074528 CN 200520074528 CN 200520074528 U CN200520074528 U CN 200520074528U CN 2838731 Y CN2838731 Y CN 2838731Y
Authority
CN
China
Prior art keywords
flue
flue gas
absorption tower
goes out
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520074528
Other languages
Chinese (zh)
Inventor
孙克勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUYUAN ENVIROMENTAL PR
Original Assignee
JIANGSU SUYUAN ENVIROMENTAL PR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUYUAN ENVIROMENTAL PR filed Critical JIANGSU SUYUAN ENVIROMENTAL PR
Priority to CN 200520074528 priority Critical patent/CN2838731Y/en
Application granted granted Critical
Publication of CN2838731Y publication Critical patent/CN2838731Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

Integrated smoke desulfurizer of smoothing absorbing tower is a kind of improvement technical scheme that is used for the limestone-gypsum wet method of means of flue gas desulfurization of power plant or association area.Wherein, be provided with a by-pass damper door (7) in the centre of flue (1), flue (1) is divided into flue inlet side and flue goes out end, be connected with former gas baffle door (2) in the inlet side of flue (1) and be connected with flat flow absorption tower (4) by flue gas radiator (31); The end that goes out on flat flow absorption tower (4) passes through the inlet side that flue gas heat dump (32) connects demister (5), and the end that goes out of demister (5) goes out end by the flue that clean gas baffle door (6) connects flue (1).Because the smoke entrance absolute altitude unanimity of boiler flue, absorption tower and smoke re-heater, the major function unit directly connects, and arranges smooth and easy; The contraction in length of flue can be saved lot of materials; The pressure loss is also less, can reduce cost and operating cost significantly.

Description

Integrated smoke desulfurizer of smoothing absorbing tower
Technical field
The utility model relates to a kind of improvement technical scheme that is used for the limestone-gypsum wet process of FGD (WFGD) of means of flue gas desulfurization of power plant or association area, belongs to the technical field of flue gas desulfurization device.
Background technology
Whole desulphurization system is positioned at after flue end, the electric cleaner in known this field at present, and generally, former flue gas is earlier through entering the absorption tower after smoke re-heater (GGH) cooling.The kind on absorption tower is a lot, but the main flow tower of wet processing is a spray column, and adopts reflux type to arrange more.Flue gas enters the absorption tower from bottom, spray district, upwards with absorption slurries counter current contacting; Flue gas after the desulfurization is discharged from top of tower.The clean flue gas of discharging enters smoke stack emission after the heat again by GGH again.Because there are several meters to the tens meters differences that do not wait in the smoke entrance of boiler flue, absorption tower and GGH on absolute altitude, so between the connection flue long and complicated, system layout is loose, cause the resistance of flue gas system bigger, need to be equipped with special desulfurization blower fan and overcome this part resistance, also make cost and operating cost than higher.
Summary of the invention
Technical problem: in order to overcome the problem that existing design exists, the utility model provides a kind of integrated smoke desulfurizer of smoothing absorbing tower, and the compact conformation of this desulfurizer can reduce cost and operating cost significantly.
Technical scheme: the utility model be contour with the flue gas homonymy that has the anti-return gas approach, has a flow field adaptive faculty, put down the flat flow absorption tower of into clearing and substitute the core apparatus of spray column as flue gas desulphurization system, this device is made up of flue, former gas baffle door, flue gas radiator, flat flow absorption tower, demister, flue gas heat dump, clean gas baffle door, by-pass damper door; Wherein, be provided with a by-pass damper door in the centre of flue, flue be divided into flue inlet side and flue go out end, be connected with former gas baffle door in the inlet side of flue and be connected with the flat flow absorption tower by the flue gas radiator; The end that goes out on flat flow absorption tower passes through the inlet side that the flue gas heat dump connects demister, and the end that goes out of demister goes out end by the flue that clean gas baffle door connects flue.
Uptake zone, flat flow absorption tower is horizontal U type, flue gas is realized the break-in of U type in tower, the smoke entrance on absorption tower is in the same side of tower, and the gas approach on flat flow absorption tower and exhanst gas outlet are on sustained height, flue gas does not have perpendicular flow from advancing tower to going out tower, does not have height change.
The flue gas level on flat flow absorption tower is passed through, and its flue gas flow rate is several times as much as spray column.After former flue gas was drawn from boiler back end ductwork, level entered GGH heat release side, almost at the uniform velocity, flatly entered the flat flow absorption tower after the heat release, contact with absorbing the slurries cross-current, after the desulfurization again level pass through the GGH heat absorbing side, enter smoke stack emission after the heat again.The crushing of whole desulphurization system is little than conventional design, and being expected to all provides pressure head by steam generator system, and no longer increases special desulfurization blower fan.
Beneficial effect: the flat flow absorption tower reduces so its height and diameter all have significantly because the absolute altitude of the flue gas flow rate height in the tower, import and export is identical, and equipment manufacturing cost reduces.Because the smoke entrance absolute altitude unanimity of boiler flue, absorption tower and GGH, the major function unit directly connects, and arranges smooth and easy; The contraction in length of flue can be saved lot of materials; The pressure loss is also less, is expected to rely on the pressure head more than needed of steam generator system self to overcome, and does not need to increase special desulfurization blower fan, relatively has simplified equipment, arranges compact characteristics with the WFGD of routine, can reduce cost and operating cost significantly.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is a general structure schematic diagram of the present utility model.Fig. 2 is Fig. 1 plan structure schematic diagram.
Have among the figure: flue 1, former gas baffle door 2, flue gas radiator 3 1, flat flow absorption tower 4, demister 5, flue gas heat dump 3 2, clean gas baffle door 6, by-pass damper door 7.
The specific embodiment
Device of the present utility model is by flue 1, former gas baffle door 2, flue gas radiator 3 1, flat flow absorption tower 4, demister 5, flue gas heat dump 3 2, clean gas baffle door 6, by-pass damper door 7 form; Wherein, be provided with a by-pass damper door 7 in the centre of flue 1, flue 1 be divided into flue inlet side and flue go out end, be connected with former gas baffle door 2 in the inlet side of flue 1 and by flue gas radiator 3 1Be connected with flat flow absorption tower 4; The end that goes out on flat flow absorption tower 4 passes through flue gas heat dump 3 2The inlet side that connects demister 5, the end that goes out of demister 5 goes out end by the flue that clean gas baffle door 6 connects flue 1.
4 uptake zones, flat flow absorption tower are horizontal U type, flue gas is realized the break-in of U type in tower, the smoke entrance on absorption tower is in the same side of tower, and the gas approach on flat flow absorption tower 4 and exhanst gas outlet are on sustained height, flue gas does not have perpendicular flow from advancing tower to going out tower, does not have height change.
When former gas baffle door 2 and clean gas baffle door 6 are closed, when by-pass damper door 7 is opened, the unprocessed direct discharging of boiler smoke; Close and former gas baffle door 2 and clean gas baffle door 6 when opening when by-pass damper door 7, boiler smoke enters flat flow absorption tower WFGD device.
Former flue gas is at first at flue gas radiator 3 1In emit clean flue gas after heat is used for adding thermally desulfurizing, enter the core apparatus of flue gas desulphurization system after temperature reduces---the flue gas homonymy that have the anti-return gas approach, has a flow field adaptive faculty is contour, put down the flat flow absorption tower 4 of into clearing.The vertical spray of the absorbent slurry that atomizes in tower falls, and the former flue gas of horizontal flow warp is carried out washing, purifying, makes flue gas reduce to saturation temperature.The clean flue gas that flows out from the absorption tower then by two-stage demister 5, is used for removing the water smoke that flue gas is taken out of in washing process.Clean flue gas is at flue gas heat dump 3 2In be reheated the back discharge from chimney.
In this embodiment, whole desulphurization system is arranged according to the U type, connects the center line absolute altitude unanimity of flue everywhere, flue gas radiator 3 1, flue gas heat dump 3 2, demister 5 integrated being arranged on the flat flow absorption tower 4.Whole system is arranged smooth and easy, compact conformation, and floor space is few.Owing to reduced turning round and length of flue, the pressure loss of whole flue gas flow field is also less, is expected to rely on the pressure head more than needed of steam generator system self to overcome, and does not need to increase special desulfurization blower fan, can reduce cost and operating cost significantly.
Smoke re-heater (GGH) adopts heat pipe-type GGH or other can guarantee the type of smoke entrance absolute altitude unanimity, also can not establish GGH.

Claims (2)

1, a kind of integrated smoke desulfurizer of smoothing absorbing tower is characterized in that this device is made up of flue (1), former gas baffle door (2), flue gas radiator (31), flat flow absorption tower (4), demister (5), flue gas heat dump (32), clean gas baffle door (6), by-pass damper door (7); Wherein, be provided with a by-pass damper door (7) in the centre of flue (1), flue (1) is divided into flue inlet side and flue goes out end, be connected with former gas baffle door (2) in the inlet side of flue (1) and be connected with flat flow absorption tower (4) by flue gas radiator (31); The end that goes out on flat flow absorption tower (4) passes through the inlet side that flue gas heat dump (32) connects demister (5), and the end that goes out of demister (5) goes out end by the flue that clean gas baffle door (6) connects flue (1).
2, integrated smoke desulfurizer of smoothing absorbing tower according to claim 1 is characterized in that uptake zone, flat flow absorption tower (4) is horizontal U type.
CN 200520074528 2005-08-16 2005-08-16 Horizontal flow absorption column integrated flue gas desulfurization apparatus Expired - Lifetime CN2838731Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520074528 CN2838731Y (en) 2005-08-16 2005-08-16 Horizontal flow absorption column integrated flue gas desulfurization apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520074528 CN2838731Y (en) 2005-08-16 2005-08-16 Horizontal flow absorption column integrated flue gas desulfurization apparatus

Publications (1)

Publication Number Publication Date
CN2838731Y true CN2838731Y (en) 2006-11-22

Family

ID=37426718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520074528 Expired - Lifetime CN2838731Y (en) 2005-08-16 2005-08-16 Horizontal flow absorption column integrated flue gas desulfurization apparatus

Country Status (1)

Country Link
CN (1) CN2838731Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1310699C (en) * 2005-08-16 2007-04-18 孙克勤 Integrated smoke desulfurizer of smoothing absorbing tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1310699C (en) * 2005-08-16 2007-04-18 孙克勤 Integrated smoke desulfurizer of smoothing absorbing tower

Similar Documents

Publication Publication Date Title
CN110567290B (en) Unsaturated high-humidity tail gas white smoke eliminating device and method
CN105013315A (en) Wet method flue gas desulphurization denitration dedusting integration system
CN101406804A (en) High-efficient purification treatment device for flue tail gas of fuel oil cremator
CN204841408U (en) Flue gas desulfurization system
CN207270943U (en) A kind of cooperative control system of coal steam-electric plant smoke flue dust
CN201389423Y (en) Flue gas desulphurization dust removing tower for coal burning boiler
CN103071362A (en) Dedusting and desulfuration integrated device for smoke and application of integrated device
CN2813072Y (en) Combined flue gas denitrating dust cleaning and desulfurizing apparatus
CN2838731Y (en) Horizontal flow absorption column integrated flue gas desulfurization apparatus
CN1745878A (en) Assembled smoke gas desulfurizer with denitration and dust-proof functions
CN1310699C (en) Integrated smoke desulfurizer of smoothing absorbing tower
CN201300034Y (en) Vortex-sprinkling combined desulphurizing device
CN101301572B (en) Dry-wet mixed type dust-removing and desulfurizing integrated device
CN203777877U (en) Electrostatic composite fume dedusting and demisting device
CN2642391Y (en) Mixed-flow grid plate type water film dedusting desulfurizing equipment
CN205102148U (en) Coal fired power plant's boiler purifier that discharges fume
CN205392024U (en) Horizontal membrane wet dedusting device of high -efficient condensation
CN201249099Y (en) Water film dust removing device with desulfurizing function
CN201006390Y (en) Oil-containing smoke purifying installation
CN204746086U (en) High -efficient flexible defogging dust collector
CN209952587U (en) Wet desulphurization flue gas condensing system with water balance function
CN2813073Y (en) Compact, low-consumption flue gas desulfurizing apparatus
CN201823457U (en) Natural induced air highly-efficiency desulfurizing and dust removing device
CN206300214U (en) New high-efficiency tubular type heat medium water forced cyclic type heating system
CN204816215U (en) Catalytic cracking flue gas dust removal desulfurization is treatment equipment in coordination

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Effective date of abandoning: 20050816

AV01 Patent right actively abandoned

Effective date of abandoning: 20050816

C25 Abandonment of patent right or utility model to avoid double patenting