CN2749930Y - Member connection structure - Google Patents

Member connection structure Download PDF

Info

Publication number
CN2749930Y
CN2749930Y CN 200420114330 CN200420114330U CN2749930Y CN 2749930 Y CN2749930 Y CN 2749930Y CN 200420114330 CN200420114330 CN 200420114330 CN 200420114330 U CN200420114330 U CN 200420114330U CN 2749930 Y CN2749930 Y CN 2749930Y
Authority
CN
China
Prior art keywords
beforehand
concrete slab
hole
retained
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420114330
Other languages
Chinese (zh)
Inventor
曹玉萍
周质炎
周兵
王作民
钟俊彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN 200420114330 priority Critical patent/CN2749930Y/en
Application granted granted Critical
Publication of CN2749930Y publication Critical patent/CN2749930Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a member connecting structure. The utility model is characterized in that one pipe sleeve is beforehand buried and at least one hole is beforehand retained on a concrete slab. In the utility model, because the one pipe sleeve is beforehand buried and at least the one hole is beforehand retained on a concrete slab, a shear pin is arranged in the beforehand buried sleeve for bearing vertical load, and a high strength bolt is arranged in the beforehand retained hole for fixing a steel bracket; certain pretightening force is exerted to the high strength bolt, can fix the steel bracket, can be favorable to the friction force of a steel plate and concrete, increases shear resistant safety reserve of the shear pin, and does not influence the bridge structure; the installation is convenient, the steel bracket can be replaced, formerly beforehand retained steels on the concrete slab is omitted, and simultaneously, a main structure has no corrosive channel and the corrosion problem can be effectively solved.

Description

A kind of member syndeton
Technical field:
The utility model relates to the technical field of steel and concrete syndeton, a kind of specifically syndeton of shelving that is used for platforms such as pipeline passway.
Background technology:
At present, as in the engineering designs over strait such as water delivery, cable, adopt the seabed comb at pipeline, but constructional difficulties, the expense height, these pipelines can depend on bridge and lay, and at bridge case beam sides the pipeline passway platform are set, this platform is fixed on case beam concrete slab, also claim on the web that its connected mode usually adopts pre-embedded steel slab on web, later stage weldable steel bracket or directly on web, do the concrete bracket and support the pipeline access platform.But in the Yu Haiyang environment of engineering department over strait, the requirement for anticorrosion height corrosion passage occurs for preventing the bridge main structure, erodes to reinforcing bar, influences bridge structure safe, and bridge does not allow pre-embedded steel slab on the case beam, as does the concrete bracket and then influenced the bridge slding form operation.
Summary of the invention:
The purpose of this utility model provides a kind of member syndeton, and it can overcome some shortcomings of the prior art, does not influence bridge construction, can prevent that the corrosion passage from appearring in the bridge main structure, solves etching problem.
To achieve these goals, the technical solution of the utility model is: a kind of member syndeton, it mainly comprises concrete slab, and the steel corbel with concrete slab links into an integrated entity is characterized in that: at the pre-buried pipe box of concrete slab with reserve a hole at least.
The utility model is because at the pre-buried pipe box of concrete slab with reserve a hole at least, shear pin is set in service sleeve bears vertical load, fixedly steel corbel of high-strength bolt is set in reserving hole, high-strength bolt is applied certain pretightning force, both fixing steel corbels, can be beneficial to its steel plate and concrete frictional force again, increase the shearing resistance safety stock of shear pin, and do not influence bridge construction, simple installation, steel corbel is replaceable, save original on concrete slab in the pre-buried steel, main structure does not have the corrosion passage, can solve etching problem effectively.
Description of drawings:
Fig. 1 is the structural representation of the utility model one embodiment
Fig. 2 is the A-A view of Fig. 1
Fig. 3 is for using pipeline passway platform schematic diagram of the present utility model
The specific embodiment:
Below in conjunction with drawings and Examples the utility model is further described.
The utility model mainly comprises concrete slab 1, concrete slab is generally web or stomach wall, the steel corbel 2 that links into an integrated entity with concrete slab 1, it is characterized in that: at concrete slab 1 a pre-buried pipe box 3 with reserve a hole 4 at least, shear pin 5 is set in pipe box 3 in the enforcement, bolt 6 is set in reserving hole 4, bolt is for applying the high-strength bolt of pretightning force, present embodiment is provided with shear pin in pipe box, reserve two holes at concrete slab, in each hole, high-strength bolt is set, adopt a shear pin to bear vertical load, two high-strength bolts are steel corbel fixedly, and the gap between shear pin and the service sleeve can reach the 1-2 millimeter, gap between high-strength bolt and the preformed hole is generally 5 millimeters, high-strength bolt applies certain pretightning force, and both fixing steel corbels can utilize the steel plate and the concrete frictional force of steel corbel again, increase the shearing resistance safety stock of shear pin, the mark 7 in the accompanying drawing is the pipeline passway platform.

Claims (3)

1, a kind of member syndeton, it mainly comprises concrete slab, the steel corbel with concrete slab links into an integrated entity is characterized in that: at the pre-buried pipe box of concrete slab with reserve a hole at least.
2, a kind of member syndeton as claimed in claim 1 is characterized in that: shear pin is set in pipe box, bolt is set in reserving hole.
3, a kind of member syndeton as claimed in claim 2 is characterized in that: bolt is for applying the high-strength bolt of pretightning force.
CN 200420114330 2004-12-16 2004-12-16 Member connection structure Expired - Fee Related CN2749930Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420114330 CN2749930Y (en) 2004-12-16 2004-12-16 Member connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420114330 CN2749930Y (en) 2004-12-16 2004-12-16 Member connection structure

Publications (1)

Publication Number Publication Date
CN2749930Y true CN2749930Y (en) 2006-01-04

Family

ID=35823317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420114330 Expired - Fee Related CN2749930Y (en) 2004-12-16 2004-12-16 Member connection structure

Country Status (1)

Country Link
CN (1) CN2749930Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103205937A (en) * 2013-04-25 2013-07-17 中铁八局集团第一工程有限公司 Universal member pre-buried node and installing method thereof
CN106013783A (en) * 2016-07-27 2016-10-12 中国冶集团有限公司 Formwork support and erecting method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103205937A (en) * 2013-04-25 2013-07-17 中铁八局集团第一工程有限公司 Universal member pre-buried node and installing method thereof
CN103205937B (en) * 2013-04-25 2015-07-29 中铁八局集团第一工程有限公司 The mounting method of the pre-buried node of a kind of universal rod body
CN106013783A (en) * 2016-07-27 2016-10-12 中国冶集团有限公司 Formwork support and erecting method thereof

Similar Documents

Publication Publication Date Title
EP2434188A2 (en) Structural duct bearing system
CN2749930Y (en) Member connection structure
CN101059000A (en) Connecting structure for steel tube concrete beam and column node
CN2799708Y (en) Prestressed steel-structured portal rigid frame
CN201610546U (en) Prestress anchoring frame plat
CN111364359A (en) Anchor pipe type cable beam anchoring structure of cable-stayed bridge concrete main beam and positioning method thereof
CN202927262U (en) Pipeline installation pillar in oil/gas pipeline tunnel
CN215160560U (en) Sliding shoe for lifting and sliding of blast furnace top
CN101446113A (en) Method for the combination of a post-increasing steel beam and a concrete slab
CN115653373A (en) Double-spherical hinge support beam column anti-seismic structure system and construction method
CN212895704U (en) Plate-to-plate connecting device for floating slab track bed to pass through rail
CN214839193U (en) Corner supporting structure of pressure pipeline and corner structure of high-drop pressure pipeline
CN212801971U (en) Slidable connecting structure
CN211498767U (en) Prevent table hole arc gate door top structure that gushes damp
CN101333802B (en) Vertical conversion process of TC5015 tower crane in construction of high pier and long span bridge
CN208577339U (en) A kind of prefabricated pipe gallery lifting balancing stand
CN211499776U (en) Transversely pre-buried fixed creeping formwork support body auxiliary stay structure
CN112942415A (en) Prefabricated assembly type retaining wall structure and mounting method thereof
CN214784665U (en) Overhead reinforcing structure suitable for plate type balcony
CN210596836U (en) Semi-enclosed shear hinge
CN214939277U (en) Large-scale steel bracket on concrete structure
CN220394180U (en) Connecting device for fixing fine adjustment claw by multifunctional rail bearing table
CN212052234U (en) Shallow pipeline road repairing support that buries
CN212775962U (en) Cast iron pipe bearing clamp
CN220927479U (en) Long-span water supply pipeline supporting structure with repair channel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060104

Termination date: 20121216