Wet-dry method integral dedusting desulfurizing purifier of industrial fume gas Download PDF

Info

Publication number
CN2748157Y
CN2748157Y CN 200420116355 CN200420116355U CN2748157Y CN 2748157 Y CN2748157 Y CN 2748157Y CN 200420116355 CN200420116355 CN 200420116355 CN 200420116355 U CN200420116355 U CN 200420116355U CN 2748157 Y CN2748157 Y CN 2748157Y
Authority
CN
China
Prior art keywords
dust
dry method
wet
removal
desulfurizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420116355
Other languages
Chinese (zh)
Inventor
雷拾清
姜海山
高金兰
么同元
郭海山
苏宝华
魏海利
宁海金
何景鑫
Original Assignee
雷拾清
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 雷拾清 filed Critical 雷拾清
Priority to CN 200420116355 priority Critical patent/CN2748157Y/en
Application granted granted Critical
Publication of CN2748157Y publication Critical patent/CN2748157Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a wet-dry method integral dedusting desulfurizing purifier of industrial fume gas which is characterized in that the wet-dry method integral dedusting desulfurizing purifier of industrial fume gas comprises two stages of wet-dry method dedusting desulfurizing devices. A water inlet pipe port is arranged at the bottom of the first stage of wet method dedusting desulfurizing device next to one lateral wall. The lower part of the lateral wall next to the water inlet pipe port is provided with a fume gas inlet channel whose opening faces to a cambered plate arranged at the water inlet pipe port. The upper part of the opening of the inlet channel in the first stage of wet method dedusting desulfurizing device is provided with a cambered guide plate. The other end of the cambered guide plate is connected with a step ladder guide plate. The other end of the step ladder guide plate is connected with a vertical guide plate. The lower part of the lateral side next to the vertical guide plate is provided with a drainage pipe port. The top of the upper part of the fume gas inlet channel is provided with the second stage of dry method dedusting desulfurizing device in which a plurality of dedusting desulfurizing filler layers which are in the honeycomb shapes are arranged. The top of the dedusting desulfurizing filler layer is provided with a fume gas outlet. The dedusting desulfurizing filler layers are fixed by stainless steel screen meshes. The wet-dry method integral dedusting desulfurizing purifier of industrial fume gas can make the fume gas be purified stably and make the discharge satisfy the standard. The wet-dry method integral dedusting desulfurizing purifier of industrial fume gas has reasonable structure, low resistance, convenient operation and maintenance, high dedusting efficiency and practicability.

Description

Industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier
Technical field
The utility model relates to a kind of dedusting and purifying device, particularly a kind of multistage dust-removal and desulfurizing, the industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier that dust-removal and desulfurizing is stable, efficient is high.
Background technology
Iron and steel, cement are important construction materials, and its manufacturing process can cause atmosphere pollution, are the key factors of harm China atmosphere safety, and wherein the environmental pollution of cement industry mainly is dust and waste gas, sintering discharging tobacco powder dirt, SO in the steel and iron industry 2Be major pollutants, high-voltage electrostatic dust separator, cloth bag filter collector are applied to flue gas of shaft kiln and administer at variance with objective reality, have that investment is high, running expense is high, operation influence on system operation Cement Calcination in Vertical Kiln production technology, enterprise is all undesirable and can not reduce SO in the real-world operation process 2Discharge capacity, the udst separation effect is not thorough, and the exhaust emission problem does not fundamentally obtain administering always.
In view of this, in order to address the above problem, this creator is according to oneself being engaged in this professional working experience and technical concept for many years, after deliberation, exploitation, and has the utility model to produce.
Summary of the invention
The utility model is that a kind of industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier will be provided, and to solve dust, exhaust emission environment, makes its qualified discharge can realize the technical problem of pollutant comprehensive utilization again.
It is such solving the problems of the technologies described above the technical scheme that is adopted:
A kind of industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier, it is characterized in that: this device comprises wet method, dry method two-stage dust-removing desulfurating apparatus, wherein, the bottom of first order wet dust removal desulphurization device is provided with a water inlet pipe mouth near a side-walls, the lower sidewall on this water inlet pipe mouth next door is provided with a gas approach pipeline, the mouth of pipe of this gas approach pipeline is aimed at the arc that water inlet pipe mouth place, bottom is provided with, the mouth of pipe top of the inlet pipeline in this first order wet dust removal desulphurization device is provided with arc-shaped guide plate, this arc-shaped guide plate end in addition is connected with step guides, this step guides end in addition is connected with upright guide plate, the other lower sidewall of this upright guide plate is provided with the draining mouth of pipe, the smoke outlet installing second level, the top dry method dust desulfurizer of this gas approach pipeline top;
Be equiped with a plurality of cellular dust-removal and desulfurizing packing layers that are in this second level dry method dust desulfurizer, its top is provided with exhanst gas outlet, and the above and below of those dust-removal and desulfurizing packing layers is equipped with stainless steel mesh and fixes;
The cellular dust-removal and desulfurizing packing layer that is of this second level dry method dust desulfurizer is by diatomite, active carbon, MgO, Na 2CO 3, Fe 2O 3And bubble flower base material compression moulding;
The gas approach pipeline of this first order wet dust removal desulphurization device and the inclination angle of bottom surface are 10 °~12 °;
This first order wet dust removal desulphurization device is provided with watch window.
The utility model makes wet method, dry method dust is desulfurization integrated, the flue gas that is entered by the gas approach pipeline fully contacts with the water inlet of first order wet dust removal desulphurization device bottom water inlet, make it atomizing, so steam is attached to the dust in flue gas particle surface, the dust granules that adheres to the greater particle size of steam is deposited in the recirculated water under the gravity effect, inflow is located in the outer sedimentation basin of this device, sediment can be used for manufacture of cement, the primary water Natural Circulation is utilized, flue gas through atomizing passes through arc-shaped guide plate, step guides, upright guide plate, utilize the inertia delay effect of guide plate, make the dust settling that adheres to steam in the flue gas on guide plate, flue gas is finished and is entered second level dry method dust desulfurizer continuation processing after the first order is handled, in the dry method dust desulfurizer of the second level, be provided with a plurality of cellular dust-removal and desulfurizing packing layers, utilize the effective ratio area of packing layer tackled the overwhelming majority in the flue gas than the small particle diameter particle and utilize SO in the solid sulfur material absorption flue gas of packing layer 2, reach the effect of dust-removal and desulfurizing, through wet method, dry method bi-level treatment, dust clearance and SO in the flue gas 2Clearance all reach more than 95%, make gas cleaning stably reaching standard discharging, thereby solved dust, exhaust emission environment, make its qualified discharge can realize the technical problem of pollutant comprehensive utilization again.
The utility model is simple in structure, and its advantage is as follows:
1, in the first order wet dust removal desulphurization device running of this device, in dedusting recirculated water, add carbide slag and regulate the pH value, reaching is the function that dedusting has desulfurization simultaneously concurrently, the backwater Natural Circulation, there is not secondary pollution, the treatment of wastes with processes of wastes against one another is turned waste into wealth, and avoids water dedusting tail gas pollution atmospheric environment, the tool feature of environmental protection.
2, the saturated back of the dust-removal and desulfurizing filler of the second level dry method dust desulfurizer of this device is neutral solid slag, can be used for cement producting material, has economy.
3, rational in infrastructure, resistance is low, and Operation and Maintenance is simple, dust-removal and desulfurizing efficient height.
4, the utility model applied range is not only applicable to cement equipment shaft kiln, also is applicable to steel sintering shaft furnace and sintering machine, burning boiler and coal-burning power plant's desulfurization project, and the tool practicality.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model Application Example structural representation.
The specific embodiment
As shown in Figure 1, be this use new structure schematic diagram, this industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier 100, wherein, this device 100 comprises wet method, dry method two-stage dust-removing desulfurating apparatus 10,20, the bottom of first order wet dust removal desulphurization device 10 is provided with a water inlet pipe mouth 16 near a side-walls, the lower sidewall on these water inlet pipe mouth 16 next doors is provided with a gas approach pipeline 11, the mouth of pipe 110 of this gas approach pipeline 11 is aimed at the arc 12 that water inlet pipe mouth 16 places, bottom are provided with, the mouth of pipe 110 tops of the inlet pipeline 11 in this first order wet dust removal desulphurization device 10 are provided with arc-shaped guide plate 13, this arc-shaped guide plate 13 end in addition is connected with step guides 14, this step guides 14 end in addition is connected with upright guide plate 15, these upright guide plate 15 other lower sidewall are provided with the draining mouth of pipe 17, the top smoke outlet 18 installing second level dry method dust desulfurizers 20 of these gas approach pipeline 11 tops;
Be equiped with two in this second level dry method dust desulfurizer 20 and be cellular dust-removal and desulfurizing packing layer 21, its top is provided with exhanst gas outlet 22, and it is fixing that the above and below of those dust-removal and desulfurizing packing layers 21 is equipped with stainless steel mesh 23;
The cellular dust-removal and desulfurizing packing layer 21 that is of this second level dry method dust desulfurizer 20 is by diatomite, active carbon, MgO, Na 2CO 3, Fe 2O 3And bubble flower base material compression moulding;
The gas approach pipeline 11 of this first order wet dust removal desulphurization device 10 is 10 °~12 ° with the inclination angle of bottom surface:
This first order wet dust removal desulphurization device 10 is provided with watch window 19.
As shown in Figure 2, structural representation for the utility model Application Example, cement in vertical kiln wherein, steel sintering shaft furnace or burning boiler 30 are connected to expansion chamber 40 by pipeline, this expansion chamber 40 is connected to blower fan 50, this blower fan 50 is connected to the gas approach pipeline 11 on the first order wet dust removal desulphurization device 10 of device 100, during work, flow of flue gas (shown in dotted arrow among Fig. 1) is from first order wet dust removal desulphurization device 10 stably reaching standard discharging after flowing to second level dry method dust desulfurizer 20 behind the wet dedusting desulfurization to carry out the dry method dust desulfurization, the clearance of dust is more than 95% in its flue gas, SO 2Clearance be more than 95%.This first order wet dust removal desulphurization device 10 utilizes carbide slag to make the neutralization precipitation flocculant, dust-removal and desulfurizing under the alkaline water effect, the impulsive force of utilizing blower fan 50 makes water through water inlet pipe mouth 16 and the draining mouth of pipe 17 and be located at first order wet dust removal desulphurization device 10 outer sedimentation basins 60 and form Natural Circulation by appropriate design, it reclaims sediment and is used for manufacture of cement, dust and waste gas are turned waste into wealth by improvement, resource, the saturated back of the dust-removal and desulfurizing filler of this second level dry method dust desulfurizer 20 is neutral solid slag, can be used for cement producting material, and the tool economic and practical.
In sum, effect of the present utility model has lifting, has tangible creativeness, practicality, meets each important document of utility model patent, so propose utility application in accordance with the law.

Claims (4)

1, a kind of industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier, it is characterized in that: this device comprises wet method, dry method two-stage dust-removing desulfurating apparatus, wherein, the bottom of first order wet dust removal desulphurization device is provided with a water inlet pipe mouth near a side-walls, the lower sidewall on this water inlet pipe mouth next door is provided with a gas approach pipeline, the mouth of pipe of this gas approach pipeline is aimed at the arc that water inlet pipe mouth place, bottom is provided with, the mouth of pipe top of the inlet pipeline in this first order wet dust removal desulphurization device is provided with arc-shaped guide plate, this arc-shaped guide plate end in addition is connected with step guides, this step guides end in addition is connected with upright guide plate, the other lower sidewall of this upright guide plate is provided with the draining mouth of pipe, the smoke outlet installing second level, the top dry method dust desulfurizer of this gas approach pipeline top;
Be equiped with a plurality of cellular dust-removal and desulfurizing packing layers that are in this second level dry method dust desulfurizer, its top is provided with exhanst gas outlet, and the above and below of those dust-removal and desulfurizing packing layers is equipped with stainless steel mesh and fixes.
2, industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier according to claim 1, it is characterized in that: it is by diatomite, active carbon, MgO, Na that this second level dry method dust desulfurizer is cellular dust-removal and desulfurizing packing layer 2CO 3, Fe 2O 3And bubble flower base material compression moulding.
3, industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier according to claim 1, it is characterized in that: the gas approach pipeline of this first order wet dust removal desulphurization device and the inclination angle of bottom surface are 10 °~12 °.
4, industrial smoke wet method dry method integral type dust-removal and desulfurizing purifier according to claim 1, it is characterized in that: this first order wet dust removal desulphurization device is provided with watch window.
CN 200420116355 2004-12-07 2004-12-07 Wet-dry method integral dedusting desulfurizing purifier of industrial fume gas Expired - Fee Related CN2748157Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420116355 CN2748157Y (en) 2004-12-07 2004-12-07 Wet-dry method integral dedusting desulfurizing purifier of industrial fume gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420116355 CN2748157Y (en) 2004-12-07 2004-12-07 Wet-dry method integral dedusting desulfurizing purifier of industrial fume gas

Publications (1)

Publication Number Publication Date
CN2748157Y true CN2748157Y (en) 2005-12-28

Family

ID=35719651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420116355 Expired - Fee Related CN2748157Y (en) 2004-12-07 2004-12-07 Wet-dry method integral dedusting desulfurizing purifier of industrial fume gas

Country Status (1)

Country Link
CN (1) CN2748157Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101121091B (en) * 2006-08-10 2011-08-31 嘉园环保股份有限公司 Composite type filter
CN102698590A (en) * 2012-06-07 2012-10-03 武汉龙净环保工程有限公司 Dry process and wet process combined smoke gas desulfuration system
CN103007681A (en) * 2012-12-18 2013-04-03 中冶长天国际工程有限责任公司 Activated carbon flue gas desulfurization and regeneration device and method
CN114471043A (en) * 2022-03-29 2022-05-13 山东鑫正达机械制造有限公司 Waste gas treatment equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101121091B (en) * 2006-08-10 2011-08-31 嘉园环保股份有限公司 Composite type filter
CN102698590A (en) * 2012-06-07 2012-10-03 武汉龙净环保工程有限公司 Dry process and wet process combined smoke gas desulfuration system
CN103007681A (en) * 2012-12-18 2013-04-03 中冶长天国际工程有限责任公司 Activated carbon flue gas desulfurization and regeneration device and method
CN114471043A (en) * 2022-03-29 2022-05-13 山东鑫正达机械制造有限公司 Waste gas treatment equipment
CN114471043B (en) * 2022-03-29 2024-02-20 山东鑫正达机械制造有限公司 Waste gas treatment equipment

Similar Documents

Publication Publication Date Title
CN205127642U (en) Dust removal purification system of lime production line
CN201899951U (en) Combined dust removal and environment protection equipment for flue gas of smelting furnace
CN105642104A (en) Deep purification method and device of flue gas after wet-process desulfurization
CN2748157Y (en) Wet-dry method integral dedusting desulfurizing purifier of industrial fume gas
CN200966967Y (en) Novel smoke dust removing device
CN2751235Y (en) Wet method divided flow rotating spray desulfurization and dust collection device
CN1745875A (en) Assembling device of double-stage wetting dust-proof desulfurizer
CN103041685A (en) Sulfur and dust removing method for boiler
CN205288076U (en) Flue gas deep purification device behind wet flue gas desulfurization
CN101301572B (en) Dry-wet mixed type dust-removing and desulfurizing integrated device
CN215085839U (en) Dust removal system for sintering flue gas pollutants of industrial furnace
CN101732971B (en) Sintering smoke purifying method
CN211097958U (en) Desulfurization and denitrification's dust treatment equipment
CN2684125Y (en) Novel fume cleaning and dedusting device utilizing waste heat
CN1219583C (en) High temperature fume dust removal, desulfurization device and its control technology
CN1562446A (en) Absorbent for 'red mud' sulfur dioxide
CN207478217U (en) A kind of incineration tail gas processing smoke and dust purifier
CN2653318Y (en) Integrated dust desulfurizing purifying device for cement production vertical kiln dust and smoke
CN2405120Y (en) Apparatus for dust-removing and desulfurization from boiler smoke
CN2669964Y (en) Desulfurization horizontal dust exhaust apparatus
CN2606846Y (en) Integrated device for dust-removing and desulfurizing for coal burning boiler
CN2069748U (en) Fume-purifying device with smoke-removing and desulphurizing functions
CN212818868U (en) Dust removing device with low pollution emission for thermal power plant
CN2225891Y (en) Purifier for eliminating smoke, reducing dust and desulfating
CN2207872Y (en) Pneumatic emulsifying filter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Designer after: Lei Shiqing

Designer after: Liu Shuhong

Designer after: Jiang Haishan

Designer after: Wang Yinsheng

Designer after: Guo Haishan

Designer after: Han Sheng

Designer after: Zhang Chunfeng

Designer before: Lei Shiqing

Designer before: Jiang Haishan

Designer before: Gao Jinlan

Designer before: Me Tongyuan

Designer before: Guo Haishan

Designer before: Su Baohua

Designer before: Wei Haili

Designer before: Ning Haijin

Designer before: He Jingxin

COR Change of bibliographic data

Free format text: CORRECT: DESIGNER; FROM: LEI SHIQING; JIANG HAISHAN; GAO JINLAN; ME TONGYUAN; GUO HAISHAN; SU BAOHUA; WEI HAILI; NING HAIJIN; HE JINGXIN TO: LEI SHIQING; LIU SHUHONG; JIANG HAISHAN; WANG YINSHENG; GUO HAISHAN; HAN SHENG; ZHANG CHUNFENG

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee