CN2725723Y - Novel gas soot-blowing device - Google Patents

Novel gas soot-blowing device Download PDF

Info

Publication number
CN2725723Y
CN2725723Y CN 200420087616 CN200420087616U CN2725723Y CN 2725723 Y CN2725723 Y CN 2725723Y CN 200420087616 CN200420087616 CN 200420087616 CN 200420087616 U CN200420087616 U CN 200420087616U CN 2725723 Y CN2725723 Y CN 2725723Y
Authority
CN
China
Prior art keywords
chamber
burning
soot
accelerating
blowing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420087616
Other languages
Chinese (zh)
Inventor
陈长栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING FANYUANXING TECHNOLOGY CO LTD
Original Assignee
BEIJING FANYUANXING TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING FANYUANXING TECHNOLOGY CO LTD filed Critical BEIJING FANYUANXING TECHNOLOGY CO LTD
Priority to CN 200420087616 priority Critical patent/CN2725723Y/en
Application granted granted Critical
Publication of CN2725723Y publication Critical patent/CN2725723Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The utility model relates to a novel gas soot-blowing device which comprises a combustible gas inlet pipe, an air inlet pipe, a mixing chamber, a corrugated fire arrestor, a lighting chamber, an accelerating tube, a burning accelerating chamber and a spout, which are serially connected by pipelines, and the connecting mode is a flange or a weld connecting. The utility model is characterized in that the lighting chamber is provided with a triplet with a casing cap, the outlet of the burning accelerating chamber is provided with an air pipe with an aperture, and the spout comprises a circle pipe and a miter elbow. The novel gas soot-blowing device can increases the soot-blowing performance and security performance and can extend the gas soot-blowing applying range to a high-temperature heating surface soot-blowing situation, and therefore, the on-site installation and arrangement are more convenient and flexible. The utility model is suitable for the boiler heating surface and soot-blowing situation of other heating surfaces.

Description

A kind of novel gas soot blower
Affiliated field
The utility model relates to a kind of novel gas soot blower, blows the combustion gas soot blower of ash in particular for boiler heating surface.
Background technology
Its cleaning is kept in the dust stratification and the slagging scorification of removing on the heating surface, is a kind of means that guarantee the safe and economical boiler operation.In general, guarantee that the heating surface cleaning can make boiler efficiency improve 1~3%.Become ash deposition on boiler heating surface after the burning of not flammable mineral matter in the boiler combustion, and little by little thicken and become dust stratification layer or slagging scorification layer, blow off as untimely, then dust stratification and slagging scorification will be serious day by day.According to test, dust stratification coking layer thermal conductivity factor has only 1/400~1/1000 of metal pipe-wall.Therefore behind the fouling of heating surface, make heat transfer deterioration, exhaust gas temperature raises, and reduces boiler thermal output.Dust stratification stops up flue, and is light then increase the flow resistance of convection pass, increases power consumption, and reduction is exerted oneself, and can stop up the flue circulation area when serious, hinders the proper flow of flue gas, the reduction boiler output, even may be forced to the blowing out deashing.
Also without any the method that effectively prevents dust stratification, the only resource is to adopt the soot blower selective sootblowing at present.Present most boiler is equipped with steam soot-blower, also has part to be equipped with compressed air soot-blowing, hydraulic(-ash) sluicing, sonic soot blowing equipment.But the common drawback of said method is to blow grey energy intensity to reach sphere of action inadequately limited, and some ash-blowing method such as steam soot blowing energy consumption height, and equipment dependability is poor, maintenance workload is big and heating surface is had infringement etc.Though boiler heating surface all has been equipped with above-mentioned soot blower mostly, service efficiency is low, and many places are in idle state.
It is to utilize flammable premixed gas body (be full of burning accelerating chamber after) to force to light the technology that the detonation shock wave carries out the top blast ashes that are heated such as boiler that produces that ash is blown in combustion gas, because it has and blow the big and dry type of grey energy and blow ash, in commercial Application more and more widely.The detonation that grey energy comes flammable premixed gas body in the spontaneous combustion accelerating chamber is blown in combustion gas, thereby to improve in the burning accelerating chamber flammable premixed gas physique amount flow be to guarantee that combustion gas blows the key point of grey effect.Present combustion gas is blown gray technology and is mainly used in boiler tail low temperature heating surface zone, it all is inflation in the burning accelerating chamber (opening is towards heating surface) of opening, resistance to flow output is very little, thereby the mass flowrate under same burning accelerating chamber volume is little, burning accelerating chamber capacity utilization is low, and in the burning accelerating chamber flammable premixed gas body mass flowrate and blow grey energy and can not regulate; In addition, be used for high-temperature heating top blast when ash, high-temperature flue gas can be lighted flammable premixed gas body in the burning accelerating chamber (below become " flash back ") when the flammable premixed gas body is not full of the burning accelerating chamber, be difficult to guarantee high-temperature heating top blast ash effect.
Summary of the invention
Deficiency for the combustion gas soot blower that overcomes present use, the utility model provides a kind of novel gas soot blower, grey energy is blown in adjusting thereby this device not only can increase flammable premixed gas physique amount flow rate under given burning accelerating chamber volume, and can be used for high-temperature heating top blast ash occasion.
The utility model is made up of combustible gas air inlet pipe, air intake duct, mixing chamber, ripple type spark arrester, igniting chamber, accelerating tube, burning accelerating chamber and spout etc., is linked in sequence by pipeline, and connected mode is flange or welding.It is characterized by igniting chamber and be provided with bull-plugged tee, the setting of burning accelerating chamber exit portion has the air hose of aperture, and spout is made of the pipe and the elbow of cutting sth. askew.The igniting chamber body is established the threeway that has plug, combustible gas is forced light the detonation shock wave that the back produces (effect be about after a few tens of milliseconds promptly can release) directly to impact plug, and directly do not impact inlet pipeline, promptly adopt the method for " instantaneous buffering " to solve the detonation tempering problem that ignition point occurs, improved the security performance of combustion gas soot blower.The air hose lee face of burning accelerating chamber outlet has aperture, the air that passes through from aperture can form air curtain and cover whole outlet cross section, can increase burning accelerating chamber resistance to flow output in the gas replenishment process on the one hand, improve the mass flowrate of flammable premixed gas body in the burning accelerating chamber, blow grey energy thereby increase; Flammable premixed gas body in high-temperature flue gas and the burning accelerating chamber can be separated on the other hand, avoid " flash back " effectively.Because the momentum of orifice jet (hole diameter is less) is far smaller than the momentum of detonation shock wave jet, thereby the air curtain that aperture forms is to blowing the almost not influence of grey performance impact.
The beneficial effects of the utility model be improve the combustion gas soot blower blow grey performance and security performance, and the range of application that combustion gas can be blown ash expands to high-temperature heating top blast ash occasion, on-the-spot mounting arrangements is convenient flexibly.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a structural representation of the present utility model
Fig. 2 is the structural representation of igniting chamber
Fig. 3 is the structural representation of burning accelerating chamber and spout
Fig. 4 is the A-A cutaway view of Fig. 3
1. combustible gas air inlet pipe among the figure, 2. air intake duct, 3. mixing chamber, 4. ripple type spark arrester, 5. igniting chamber, 6. accelerating tube, 7. burning accelerating chamber 8. spouts
The specific embodiment
In Fig. 1, the utility model is made up of combustible gas air inlet pipe (1), air intake duct (2), mixing chamber (3), ripple type spark arrester (4), igniting chamber (5), accelerating tube (6), burning accelerating chamber (7) and spout (8) etc., be linked in sequence by pipeline, connected mode is flange or welding.It is characterized by igniting chamber (5) and be provided with the threeway that has plug, burning accelerating chamber (7) outlet is provided with the air hose that has aperture, and spout (8) is made of the pipe and the elbow of cutting sth. askew.
In Fig. 2, described igniting chamber (5) is by air inlet pipe (51), detector unit (52), igniting chamber body (53), igniter (54) and outlet formations such as (55), it is characterized in that igniting chamber body (53) inlet part is the threeway that has plug, plug is perpendicular to the central axis of igniting chamber body (53), air inlet pipe (51) and the angled α of igniting chamber body (53) central axis (0 °<α<180 °), α is preferably 90 °, igniting chamber body (53) diameter d 1More than or equal to outlet (55) diameter d 2
In Fig. 3, described burning accelerating chamber (7) is by inlet tube (71), elliposoidal end socket (72), cylindrical shell (73), accelerator card (74), the air hose (75) that has aperture and outlet formations such as (76), the quantity that it is characterized in that accelerator card (74) is 2~6, burning accelerating chamber (7) outlet is provided with the air hose (75) that has aperture, aperture is opened at air hose (75) lee face, the aperture air-spray forms cross jet with burning accelerating chamber (7) exit flow, the angled γ of little axially bored line and outlet (76) central axis, 0 °<γ<90 °.
In Fig. 3, described spout (8) is made of pipe (81) and the elbow of cutting sth. askew (82), and the angle of bend of cutting sth. askew β can be 30~90 °.

Claims (4)

1. novel gas soot blower, it is made up of combustible gas air inlet pipe, air intake duct, mixing chamber, ripple type spark arrester, igniting chamber, accelerating tube, burning accelerating chamber and spout, be linked in sequence by pipeline, connected mode is flange or welding, it is characterized by igniting chamber and be provided with bull-plugged tee, the outlet of burning accelerating chamber is provided with narrow meshed air hose, and spout is made of the pipe and the elbow of cutting sth. askew.
2. according to a kind of novel gas soot blower described in the claim 1, it is characterized in that igniting chamber body inlet part is the threeway that has plug, igniting chamber air inlet and the angled α of igniting chamber body central axis (α is preferably 90 °), igniting chamber body diameter d 1More than or equal to the outlet diameter d 2
3. according to a kind of novel gas soot blower described in the claim 1, the accelerating chamber that it is characterized in that burning is by two elliposoidal end sockets, 2~6 accelerator cards of middle cylindrical shell and interior setting thereof, and the air hose that has aperture constitutes.The air hose lee face has aperture, little axially bored line and the angled γ of burning accelerating chamber export center axis, and γ is 0~90 °.
4. according to a kind of novel gas soot blower described in the claim 1, it is characterized in that spout is made of the pipe and the elbow of cutting sth. askew, angle of bend β can be 30~90 °.
CN 200420087616 2004-08-11 2004-08-11 Novel gas soot-blowing device Expired - Lifetime CN2725723Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420087616 CN2725723Y (en) 2004-08-11 2004-08-11 Novel gas soot-blowing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420087616 CN2725723Y (en) 2004-08-11 2004-08-11 Novel gas soot-blowing device

Publications (1)

Publication Number Publication Date
CN2725723Y true CN2725723Y (en) 2005-09-14

Family

ID=35040441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420087616 Expired - Lifetime CN2725723Y (en) 2004-08-11 2004-08-11 Novel gas soot-blowing device

Country Status (1)

Country Link
CN (1) CN2725723Y (en)

Similar Documents

Publication Publication Date Title
CN201072131Y (en) Bow-wave ash blowing system
CN201688416U (en) Ash cleaning system for heated surface at the tail of garbage incinerator
CN101900343B (en) Boiler pulse soot-blowing method and device thereof
CN201382425Y (en) Fuel gas shock wave soot blowing device
CN2646581Y (en) Combustible gas pulse ash blower
CN2725723Y (en) Novel gas soot-blowing device
CN203116043U (en) Online shock ash removing device of crumple-type boiler
CN100470156C (en) Method for preventing two-explosion gas high-energy impulse dusting device
CN203190431U (en) Boiler pulse soot blower
CN2324423Y (en) Device for removing ash and dirt by explosive shock wave
CN203099858U (en) Split type boiler on-line impact dust removing device
CN201652383U (en) Oil field special-purpose wet steam generator dust cleaning device
CN103062780A (en) Split on-line impacting deashing device of boiler
CN200958749Y (en) Economical environmental-protecting boiler of coal clean burning
CN2430616Y (en) Ash cleaner by weak explosion wave
CN201373416Y (en) Gas distribution cabinet
CN203116042U (en) On-line impact ash removing device of single superimposed boiler
CN2872237Y (en) Heat exchanger of hot-air furnace
CN203116041U (en) Multi-channel type boiler online grading ash removing device
CN212644652U (en) Pulse soot blowing mechanism for garbage incinerator
CN201277568Y (en) Thermal explosion pulse soot blower with simple water accumulation and dust deposition prevention part
CN212511108U (en) Low-nitrogen biomass boiler heating device
CN2720265Y (en) Small hot-wind burning-assisting dust-collecting boiler
CN2526700Y (en) Gas ignitor for coal stove
CN2426573Y (en) Gas pulse soot-blowing fire retarding nozzle for boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of registration: 20070905

Pledge (preservation): Pledge

PP01 Preservation of patent right

Effective date of registration: 20140109

Granted publication date: 20050914

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20140709

Granted publication date: 20050914

PP01 Preservation of patent right

Effective date of registration: 20140710

Granted publication date: 20050914

RINS Preservation of patent right or utility model and its discharge
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140811

Granted publication date: 20050914

DD01 Delivery of document by public notice

Addressee: Beijing Fanyuanxing Technology Co., Ltd.

Document name: Notice of preservation procedure

Addressee: Beijing Fanyuanxing Technology Co., Ltd.

Document name: Notification of Termination of Procedure

PD01 Discharge of preservation of patent

Date of cancellation: 20140811

Granted publication date: 20050914

RINS Preservation of patent right or utility model and its discharge
DD01 Delivery of document by public notice

Addressee: Chen Jianhua

Document name: Notification of Termination of Procedure

Addressee: Chen Jianhua

Document name: Notification of Expiration of Patent Right Duration