CN2719799Y - Secondary jib loading boom auxiliary power mounting device - Google Patents

Secondary jib loading boom auxiliary power mounting device Download PDF

Info

Publication number
CN2719799Y
CN2719799Y CN 200420078070 CN200420078070U CN2719799Y CN 2719799 Y CN2719799 Y CN 2719799Y CN 200420078070 CN200420078070 CN 200420078070 CN 200420078070 U CN200420078070 U CN 200420078070U CN 2719799 Y CN2719799 Y CN 2719799Y
Authority
CN
China
Prior art keywords
oil cylinder
loading boom
hole
link span
jib loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420078070
Other languages
Chinese (zh)
Inventor
王凤萍
程磊
孙影
刘可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Heavy Machinery Co Ltd
Original Assignee
XUZHOU HEAVY MACHINERY PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU HEAVY MACHINERY PLANT filed Critical XUZHOU HEAVY MACHINERY PLANT
Priority to CN 200420078070 priority Critical patent/CN2719799Y/en
Application granted granted Critical
Publication of CN2719799Y publication Critical patent/CN2719799Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a secondary jib loading boom auxiliary power mounting device; the master bracket of the mounting device is welded at the header of the main jib loading boom; the header of the master bracket is provided with a main hole, and the secondary bracket is welded at the header of the secondary jib loading boom; the header of the secondary bracket is provided with a pin shaft hole; the secondary bracket and an oil cylinder are arranged at the inner side of the link span; the front end of the link span is provided with a connecting hole, and the front part of the link span is connected with a wane having a hole; the hole of the wane is connected with the pin shaft hole of the header of the secondary bracket through a pin shaft and a spring clip; the back end of the link span is connected with the back end of the oil cylinder; the front end of the oil cylinder is connected with the back of the secondary bracket, and the oil cylinder is connected with a manual oil pump. By means of controlling the shrinking of the oil cylinder by the manual oil pump and the acting force of the oil cylinder piston rod, and under the matching of the component such as the master bracket, the secondary bracket, etc., the hinged hole of the secondary jib loading boom is easily and automatically lined up with the hinged hole of the main jib loading boom, and the mounting of the secondary jib loading boom is convenient, timesaving, labor saving, high efficient and safe operating. The utility model is suitable for the assembling of the secondary jib loading boom and the main jib loading boom of the tyre crane.

Description

Auxiliary cargo boom auxiliary power erecting device
Technical field
Erecting device when the utility model relates to a kind of car hosit auxiliary cargo boom and the assembling of main crane arm.
Background technology
The auxiliary cargo boom of car hosit and main crane arm are the four hinges assembling bonded assemblys by main crane arm head.Assembling is during auxiliary cargo boom, normally earlier around the fixed connection shaft revolute pair crane arm of auxiliary cargo boom and main crane arm side, with the hinge of the hinge of auxiliary cargo boom end one side and main crane arm head one side hinged on.Pull down the fixed connection shaft of side then, around main crane arm head hinge revolute pair crane arm, the hinge of hinged opposite side.In opposite side hinge articulated procedures, owing to be subjected to many-sided influences such as auxiliary cargo boom deadweight, manufacturing errors, the auxiliary cargo boom hinge hole is difficult to align with main crane arm hinge hole, and it is very difficult that bearing pin is installed.Prior art is artificial centering, operating difficulties, and efficient is low.For large-tonnage hoisting crane more than 80 tons because higher and auxiliary cargo boom length of car load height and weight are bigger, install this bearing pin more time-consuming, require great effort and operate dangerous.
Summary of the invention
The purpose of this utility model is that a kind of auxiliary cargo boom auxiliary power erecting device will be provided, and this erecting device is easy to use, safe and efficiency of assembling is high.
The purpose of this utility model is achieved in that this erecting device comprises main support, link span, bearing pin, Spring Card, assistant support, oil cylinder and hand oil pump, main support is welded on main crane arm head, the main support head is provided with main aperture, assistant support is welded on the auxiliary cargo boom head, the assistant support head is provided with pin shaft hole, assistant support and oil cylinder are positioned at the link span inboard, the link span front end is provided with connecting bore, the link span front portion is connected with seesaw with holes, the hole of seesaw links to each other with the pin shaft hole of Spring Card with the assistant support head by bearing pin, the rear end of link span links to each other with the rear end of oil cylinder, and the front end of oil cylinder links to each other with the back of assistant support, and oil cylinder is connected with hand oil pump.
The utility model utilizes the flexible of hand oil pump control oil cylinder, application force by the oil cylinder piston bar, under the cooperation of parts such as main support, assistant support, make the auxiliary cargo boom hinge hole be easy to align automatically with main crane arm hinge hole, install auxiliary cargo boom make things convenient for, save time, laborsaving, efficiency of assembling is high and safety of operation.Be applicable to the assembling of car hosit auxiliary cargo boom and main crane arm.
Description of drawings
Fig. 1 is the constructional drawing of an embodiment of the present utility model.
Fig. 2 is link span and the assistant support bonded assembly birds-eye view among Fig. 1.
1. main supports among the figure, 2. link span, 3. bearing pin, 4. Spring Card, 5. assistant support, 6. oil cylinder, 7. hand oil pump, 8. seesaw, 9. connecting bore, 10. auxiliary cargo boom, 11. main crane arms.
The specific embodiment
In Fig. 1 and Fig. 2, main support 1 is welded on main crane arm 11 heads, and main support 1 head is provided with main aperture.Assistant support 5 is welded on auxiliary cargo boom 10 heads, and assistant support 5 heads are provided with pin shaft hole.Assistant support 5 and oil cylinder 6 are positioned at link span 2 inboards.Link span 2 front ends are provided with connecting bore 9, and the main aperture in the accompanying drawing has overlapped with connecting bore 9.The front portion of link span 2 is connected with seesaw with holes 8, and the hole of seesaw 8 links to each other with the pin shaft hole of Spring Card 4 with assistant support 5 heads by bearing pin 3, and the rear end of link span 2 links to each other with the rear end of oil cylinder 6.The front end of oil cylinder 6 links to each other with the back of assistant support 5, and oil cylinder 6 is connected with hand oil pump 7.Hand oil pump 7 links to each other with auxiliary cargo boom 10.
On assembling auxiliary cargo boom 10 is hinged behind the hinge of a side, again around this hinge revolute pair crane arm 10, the hinge of hinged opposite side.When the hinge hole of opposite side hinge master crane arm 11 does not also align with the hinge hole of auxiliary cargo boom 10, the connecting bore on the link span 29 is alignd with main aperture on the main support 1.At this moment, pull down bearing pin 3 and Spring Card 4 and be assemblied in connecting bore 9 and main aperture place.Handle hand oil pump 7, pressure oil enters oil cylinder 6, the piston rod that promotes oil cylinder 6 stretches out, piston rod promotes assistant support 5 and travels forward, shorten the distance between main crane arm 11 and auxiliary cargo boom 10 hinge holes, hinge hole up to auxiliary cargo boom 10 aligns with the hinge hole of main crane arm 11, installs to connect bearing pin.

Claims (1)

1. auxiliary cargo boom auxiliary power erecting device, this erecting device comprises main support, link span, bearing pin, Spring Card, assistant support, oil cylinder and hand oil pump, it is characterized in that main support is welded on main crane arm head, the main support head is provided with main aperture, assistant support is welded on the auxiliary cargo boom head, the assistant support head is provided with pin shaft hole, assistant support and oil cylinder are positioned at the link span inboard, the link span front end is provided with connecting bore, the link span front portion is connected with seesaw with holes, and the hole of seesaw links to each other with the pin shaft hole of Spring Card with the assistant support head by bearing pin, and the rear end of link span links to each other with the rear end of oil cylinder, the front end of oil cylinder links to each other with the back of assistant support, and oil cylinder is connected with hand oil pump.
CN 200420078070 2004-07-21 2004-07-21 Secondary jib loading boom auxiliary power mounting device Expired - Lifetime CN2719799Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420078070 CN2719799Y (en) 2004-07-21 2004-07-21 Secondary jib loading boom auxiliary power mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420078070 CN2719799Y (en) 2004-07-21 2004-07-21 Secondary jib loading boom auxiliary power mounting device

Publications (1)

Publication Number Publication Date
CN2719799Y true CN2719799Y (en) 2005-08-24

Family

ID=35008761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420078070 Expired - Lifetime CN2719799Y (en) 2004-07-21 2004-07-21 Secondary jib loading boom auxiliary power mounting device

Country Status (1)

Country Link
CN (1) CN2719799Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102887441A (en) * 2012-09-25 2013-01-23 中联重科股份有限公司 Gooseneck boom frame self-loading and unloading device for crane and crane
CN103010970A (en) * 2012-12-25 2013-04-03 三一重工股份有限公司 Fly jib auxiliary mounting device and crane
CN103574232A (en) * 2012-07-26 2014-02-12 徐工集团工程机械股份有限公司 Self-propelled power device and auxiliary mounting system for crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103574232A (en) * 2012-07-26 2014-02-12 徐工集团工程机械股份有限公司 Self-propelled power device and auxiliary mounting system for crane
CN102887441A (en) * 2012-09-25 2013-01-23 中联重科股份有限公司 Gooseneck boom frame self-loading and unloading device for crane and crane
CN102887441B (en) * 2012-09-25 2015-04-01 中联重科股份有限公司 Gooseneck boom frame self-loading and unloading device for crane and crane
CN103010970A (en) * 2012-12-25 2013-04-03 三一重工股份有限公司 Fly jib auxiliary mounting device and crane
CN103010970B (en) * 2012-12-25 2015-07-15 三一重工股份有限公司 Fly jib auxiliary mounting device and crane

Similar Documents

Publication Publication Date Title
CN202967930U (en) Device for assisting assembly and disassembly of variable-amplitude oil cylinder and crane with device
CN201087083Y (en) Crane with self-disassembling mechanism
CN2719799Y (en) Secondary jib loading boom auxiliary power mounting device
CN203048450U (en) Crawler type telescopic boom crane
CN103848362B (en) A kind of for the luffing pulley block structure of hoisting crane and the hoisting crane with this mechanism
CN107264377B (en) Dismounting device and dismounting method for normally dismounted boom section of crane boom
CN101830404A (en) Special boom head device of crawler crane for wind generating set
CN101698270A (en) Method for assembling multi-link suspension
CN201325496Y (en) Hoisting device of non-air suspension axle for car
CN203048460U (en) Automobile crane
CN205951790U (en) Supplementary lifting devices of carriage detachable transport vechicle
CN110588488B (en) Tractor structure for large-sized scrapped automobile and using method
CN201850570U (en) Machine and quick-change device thereof
CN212356375U (en) Hydraulic jack support
CN211681831U (en) Mining car front suspension dismounting tool
CN201258236Y (en) Connecting apparatus of forklift lifting frame
CN2627798Y (en) Front lifting device for wheeled tractor
CN218489413U (en) Connecting rod type oil cylinder lifting axle device and semitrailer
CN111891939B (en) Frame structure and mobile crane
CN2480229Y (en) Tyre-holding lifting mechanism for obstacle-removing vehicle
CN212289920U (en) Locomotive unit brake assembly and disassembly tools car
CN212403281U (en) Automobile crane telescopic frame
CN219491126U (en) Dismounting and turning device of diesel scraper
CN112320662B (en) Suspension bridge type turnover device
CN210396702U (en) Skid-mounted device capable of starting multiple petroleum equipment in parallel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090220

Address after: No. 165 Copper Road, Jiangsu, Xuzhou Province, China: 221004

Patentee after: Xuzhou Heavy Machinery Co., Ltd.

Address before: No. 165 Copper Road, Jiangsu, Xuzhou Province, China: 221004

Patentee before: Xuzhou Heavy Machinery Plant

ASS Succession or assignment of patent right

Owner name: XUZHOU HEACY MACHINE CO., LTD.

Free format text: FORMER OWNER: XUZHOU HEACY MACHINERY PLANT

Effective date: 20090220

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140721

Granted publication date: 20050824