CN2680777Y - Tube hanging house - Google Patents

Tube hanging house Download PDF

Info

Publication number
CN2680777Y
CN2680777Y CN 200420043012 CN200420043012U CN2680777Y CN 2680777 Y CN2680777 Y CN 2680777Y CN 200420043012 CN200420043012 CN 200420043012 CN 200420043012 U CN200420043012 U CN 200420043012U CN 2680777 Y CN2680777 Y CN 2680777Y
Authority
CN
China
Prior art keywords
column
tube hanging
fixed
hanging house
house according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420043012
Other languages
Chinese (zh)
Inventor
湛汉东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420043012 priority Critical patent/CN2680777Y/en
Application granted granted Critical
Publication of CN2680777Y publication Critical patent/CN2680777Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a tube hanging house, which comprises an empty upright post, a plurality of pre-stress preformed plate pieces, and a plurality of cables. The inside of the upright post is provided with a spiral stairway, and outside is provided with a doorway and at least a ring form boss. Both sides of the upright post are respectively provided with a flange and a metal stress fixed to the top end of the empty upright post. Many pre-stress preformed plate pieces get together to form the floor, and one end of every preformed plate piece is positioned and fixed on the ring form boss and a plurality of cable. One end of each cable is fixed on the metal stress, and the other end is fixed on the other end of the preformed plate.

Description

Tube hanging house
Technical field
The utility model relates to a kind of building that is made of a plurality of prefabricated components, relates in particular to a kind of Tube hanging house.
Background technology
All the time, building in the domestic block engineering of building trade, all be that continuing to use with basis, body of wall and multicolumn supporting floor load is the traditional architectural technology of feature.But, this traditional architectural technology exists many weak points in work progress, as construct that occupied ground is big, long, the simple operation that repeats of construction period can't save, expend a large amount of labours and produce bigger construction noise, and the ventilation and lighting of building and area of visual field are also often barely satisfactory.
Summary of the invention
The purpose of this utility model is at the deficiencies in the prior art, provides a kind of safe Tube hanging house simple in structure, to remedy the deficiency of current building trade.
For achieving the above object, the technical solution of the utility model is as follows: Tube hanging house, comprise an empty stomach column, and spiral stairs is set in the column, the column outer wall has door opening and at least one annular boss is set, and a flange is respectively installed at the column two ends; One metal truss is fixed on column top on an empty stomach; The prefabricated plate of polylith prestressing force is pieced together the formation flooring, and an end of each prefabricated plate is erected on the annular boss and fixes; With many cable wires, an end of each cable wire is fixed on the metal truss, and the other end is fixed on the other end of a prefabricated plate.
The utility model utilizes suspension cable suspension bridge principle, and stressed according to the calculating of theoretical mechanics arbitrary force system in space equilibrium conditions, changes three-dimensional suspension cable into the multidimensional suspension cable, makes the utility model meet safety standards for buildings fully.
The utlity model has following beneficial effect: the first floor is unsettled, can do activity space, garden, parking space etc., and penetrating all around, increases the circulation of air of regional extent; The building floor space is little, and the construction plant is few, and building cycle is short, and the foundation on-site construction time only needs about ten days, the whole batch production productions of the member of major project, and the scene can be installed; House profile selectivity is strong, and indoor layout can adjust arbitrarily, and lighting and ventilation is good; Technology is simple, processing ease, and building costs is low, and theftproof performance is good.
Description of drawings
Fig. 1 is a surface structure schematic diagram of the present utility model;
Fig. 2 is a sectional structure schematic diagram of the present utility model;
Fig. 3 is the structural representation of column described in the utility model;
Fig. 4 is the drawing of site of spiral stairs described in the utility model;
Fig. 5 is the structural representation of metal truss described in the utility model;
Fig. 6 is that the F of Fig. 5 is to structural representation;
Fig. 7 is that the prefabricated plate of polylith prestressing force described in the utility model is pieced together the schematic diagram that forms flooring.
Now the utility model is described in further detail in conjunction with the accompanying drawings and embodiments:
The specific embodiment
To shown in Figure 7, Tube hanging house described in the utility model is the anistree moulding of circumference, double-layer structure as Fig. 1.It has an empty stomach column 1, is the prestressing force prefabricated component, and spiral stairs 11 is set in the column, and the column outer wall has three door openings 12 and two annular boss 13 are set, and a flange 14 is respectively installed at the column two ends.One metal truss 2 is made by i iron, is fixed on column 1 top on an empty stomach by flange.Every floor face is pieced together by eight blocks of prefabricated plates 3 of prestressing force and is formed, and an end of each prefabricated plate is erected on the annular boss 13 and fixes.Many cable wires 4, an end of each cable wire 4 is fixed on the metal truss 2, and the other end is fixed on the other end of a prefabricated plate 3.Exterior wall of the present utility model is a curtain wall 5, and the cover glass steel watts 6 on the metal truss 2.
Member designs such as main body of the present utility model and floor can all adopt prestressing techniques design one cover standard shaper, unified specification production, and door and window, a grid material also all series matching process.
The utility model is installed and need be formed a basis on construction ground early stage, settles the basic flange that can be connected with column bottom flange to get final product on the basis.And basic visual exploration soil property situation decision size, pan soil adopts flexible foundation, and weak soil then adopts prefabricated tubular pile.

Claims (6)

1, Tube hanging house is characterized in that: comprise
One empty stomach column (1) is provided with spiral stairs (11) in the column, the column outer wall has door opening (12) and at least one annular boss (13) is set, and a flange (14) is respectively installed at the column two ends;
One metal truss (2) is fixed on column (1) top on an empty stomach;
The prefabricated plate of polylith prestressing force (3) is pieced together the formation flooring, and an end of each prefabricated plate is erected at annular boss (13) and goes up and fix; With
Many cable wires (4), an end of each cable wire (4) are fixed on the metal truss (2), and the other end is fixed on the other end of a prefabricated plate (3).
2, Tube hanging house according to claim 1 is characterized in that: described empty stomach column (1) is the prestressing force prefabricated component.
3, Tube hanging house according to claim 1 is characterized in that: exterior wall is curtain wall (5).
4, Tube hanging house according to claim 1 is characterized in that: metal truss (2) is gone up cover glass steel watt (6).
5, Tube hanging house according to claim 1 is characterized in that: described annular boss (13) is two.
6, Tube hanging house according to claim 1 is characterized in that: be the anistree moulding of circumference.
CN 200420043012 2004-03-01 2004-03-01 Tube hanging house Expired - Fee Related CN2680777Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420043012 CN2680777Y (en) 2004-03-01 2004-03-01 Tube hanging house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420043012 CN2680777Y (en) 2004-03-01 2004-03-01 Tube hanging house

Publications (1)

Publication Number Publication Date
CN2680777Y true CN2680777Y (en) 2005-02-23

Family

ID=34607952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420043012 Expired - Fee Related CN2680777Y (en) 2004-03-01 2004-03-01 Tube hanging house

Country Status (1)

Country Link
CN (1) CN2680777Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484521A (en) * 2016-01-04 2016-04-13 陈健玲 All-terrain movable combined suspended house in the air
CN110761582A (en) * 2019-11-01 2020-02-07 何福次 Novel building structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484521A (en) * 2016-01-04 2016-04-13 陈健玲 All-terrain movable combined suspended house in the air
CN110761582A (en) * 2019-11-01 2020-02-07 何福次 Novel building structure

Similar Documents

Publication Publication Date Title
CN105863110B (en) A kind of modular assembly formula light gauge cold-formed steel shape wallboard structural system
CN1702243A (en) Combined building with non-wainscot frame structure and construction method thereof
CN1664270A (en) Integrally assembling staircase and method for fabricating same
CN207108207U (en) A kind of steel structure lift shaft and elevator
CN104641048A (en) Waffle box building technology
CN105421656B (en) External wall board installation structure of embedded type steel structure assembled house
CN2821017Y (en) Multiple angle combined multiplayer rectangular and bent staircase
CN1263190A (en) Steel structure building method for renovation of old buildings
CN2680777Y (en) Tube hanging house
CN1258632C (en) Villa type building
CN2811428Y (en) Frame-shear structure for cast-in-place reinforced concrete floor slab and large floating slab combined building
KR101119034B1 (en) Structure of veranda type balcony of apartment
CN202000473U (en) Lattice beam
CN202530780U (en) Modular type assembly single layer dwelling house
CN111425017B (en) Construction method of assembled multifunctional modeling pavilion
CN212078811U (en) Courtyard assembled molding pavilion
CN211229646U (en) Prefabricated assembled high-rise dwelling cylinder formwork multi-ribbed prestressed floor structure system
CN101634190B (en) High-rise and multi-story residence with high-ceilinged spacial halls
CN2895621Y (en) Ecological residence storied building with elevated garden-type terrace
KR20110107047A (en) Prefabricated house
CN205530671U (en) Light steel house with energy -conserving environmental protection
CN206360455U (en) The huge square steel construction granulation tower tower mast system of lattice column
CN201297043Y (en) High residential building and multi-storey building with height-raised cross hall
CN110541472A (en) Assembled balcony of prefabricated floor
CN217205838U (en) Assembled fender of building site

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee