CN2649640Y - Wide hollow board - Google Patents

Wide hollow board Download PDF

Info

Publication number
CN2649640Y
CN2649640Y CN 03272952 CN03272952U CN2649640Y CN 2649640 Y CN2649640 Y CN 2649640Y CN 03272952 CN03272952 CN 03272952 CN 03272952 U CN03272952 U CN 03272952U CN 2649640 Y CN2649640 Y CN 2649640Y
Authority
CN
China
Prior art keywords
hollowcore slab
plate
steel strand
wide
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03272952
Other languages
Chinese (zh)
Inventor
杨征宇
周军生
杨高中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianda Road Bridge Consulting Co ltd Beijing
Original Assignee
Jianda Road Bridge Consulting Co ltd Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianda Road Bridge Consulting Co ltd Beijing filed Critical Jianda Road Bridge Consulting Co ltd Beijing
Priority to CN 03272952 priority Critical patent/CN2649640Y/en
Application granted granted Critical
Publication of CN2649640Y publication Critical patent/CN2649640Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a wide hollow plate for bridge construction. Width of the plate is 1.40 to 1.55m, and the plan of pre-stress bottom plate and rope is used. The plate is wide, and has small dead weight, good force-bearing effect and obvious economical performance.

Description

The wide cut hollowcore slab
Technical field
The utility model relates to a kind of bridge construction material, particularly a kind of wide cut hollowcore slab that is applicable to bridge superstructure.
Background technology
The hollowcore slab that the tradition bridge superstructure adopts is the bridge construction hollowcore slab standard drawing of promulgated by the ministries or commissions of the Central Government of national communication, and structure is a prestressed reinforced concrete structure, comprises reinforcing bar, concrete, steel strand and ground tackle, and its width is 1m to 1.25m.But this hollowcore slab plate is wide narrower, and it is little that section hollows out rate, and must be furnished with perpendicular curved prestress wire, and the hollowcore slab concrete of Zhi Zaoing and the large usage quantity of steel strand are less economical like this.
Figure 1A, Figure 1B has shown the cross dimensions of striding footpath 20m hollowcore slab in the standard drawing that national communication portion formulates and has joined the rope scheme, the designer is owing to estimate excessive to the end web main stress bar, thereby adopted the square ground tackle of 15-7 type, and adopted web rope scheme, because beam-ends all need be laid 2 15-7 type ground tackles up and down, taken very big bearing area like this, making it hollow out rate only is 39.4%.At span centre, steel strand distance of centre of gravity centroid of section only is 28.98cm apart from also less than normal.
Because there is following problem in prior art: the rate that at first hollows out is little, and correspondingly cement consumption is big; Next has adopted the web rope, and the consumption of steel strand is big, also has because the weight of hollowcore slab is big, so the engineering quantity of substructure and bearing tonnage are bigger.Therefore, press in practice that to hollow out area big, the lighter hollowcore slab that the steel strand consumption is little.
Summary of the invention
The technical problems to be solved in the utility model will provide a kind of exactly can save steel strand and concrete wide cut hollowcore slab.And the width of control hollowcore slab can guarantee under any circumstance it, only is subjected to the effect of a wheel on plate.
In order to achieve the above object, content of the present utility model is:
1. a bridge construction wide cut hollowcore slab comprises reinforcing bar, concrete, steel strand, it is characterized in that: the plate of this plate is wide to be 1.40-1.55m, and adopts prestress baseboard to join the rope scheme, and the rate of hollowing out is 50-65%.
2. according to 1 described wide cut hollowcore slab, it is characterized in that: the perpendicular distance of steel strand distance of centre of gravity centroid of section is 35-45cm.
1.40-1.55m is wide for the wide employing of plate of the present utility model, and the wheel horizontal spacing of national regulation is 1.8m, and the wide between-wheel spacing that is slightly smaller than of plate has equally also guaranteed under any circumstance, a plate only acts on a wheel, thereby guaranteed the load of the rated range on every block of plate.
In addition, the utility model adopts the prestressed reinforced concrete construction base plate to join the rope scheme, that is to say and does not lay web rope (shown in Fig. 2 A); With the wide 1.40-155cm that is increased to of plate; Top, base plate and web size are kept the size (as Fig. 1 b) of existing hollowcore slab substantially; The rate of hollowing out reaches as high as 65%, if the rate that hollows out is higher than this value, then the supporting capacity of hollowcore slab will can not get guaranteeing.The perpendicular distance of steel strand distance of centre of gravity section center of gravity is 35-45cm.It is 40-49% that scheme of the present utility model is saved steel strand.
In practice, compare with the hollowcore slab of prior art, wide cut hollowcore slab of the present utility model has following effect under the constant situation of safety factor:
Concrete consumption significantly reduces;
Since the superstructure hollowcore slab light 35-40%, the engineering quantity of respective lower structure and the tonnage of bearing can correspondingly reduce;
Owing to adopted base plate to join the rope scheme, saved steel strand quantity, and the maximum principal tensile stress of web 0.8Mpa only, much smaller than the standard permissible value;
The perpendicular distance of steel strand distance of centre of gravity section center of gravity increases, and the bending resistance of hollowcore slab is strong, thereby increases the supporting capacity of hollowcore slab.
Description of drawings
Figure 1A is the steel strand elevation of traditional hollowcore slab structure
Figure 1B is the traditional hollowcore slab structure sectional drawing along I-I and II-II, and wherein the dotted line left side is the I-I section, and dotted line the right is the section of II-II.
Fig. 2 A is the steel strand elevation of hollowcore slab structure of the present utility model
Fig. 2 B is the sectional drawing of hollowcore slab structure of the present utility model along I-I
Fig. 3 is prior art and bridge design section comparison diagram of the present utility model, and wherein the dotted line left side is the bridge design section of prior art, and the dotted line right side is a bridge design section of the present utility model.
The specific embodiment
As shown in Figure 3, utilize certain bridge of wide cut hollowcore slab of the present utility model, design load is a vapour-surpass 20, hangs 120, strides the footpath and partly adopts the wide wide cut hollowcore slab of 1.55m plate for 20m and 30m.The hollowcore slab material therefor comprises: concrete, C50 standard; Reinforcing bar, standard are the I level; Steel strand, ultimate strength are 1860Mpa.Prepared 20m strides the plate base plate in footpath, and to join rope (steel strand) be 13, what 30m strode the footpath is 16, the size that hollows out is 12cm apart from the hollowcore slab upper and lower, left and right, the rate of hollowing out is 62.7%, the weight that the 20m that makes strides the wide hollowcore slab of footpath 1.25m is 29.6 tons, and the weight that 30m strides the wide hollowcore slab of footpath 1.25m is 54.4 tons.The perpendicular distance of steel strand distance of centre of gravity section center of gravity is about 41cm.And being about 38 tons by the weight that the 20m of prior art manufacturing strides the hollowcore slab in footpath, the weight that 30m strides the hollowcore slab in footpath is about 76.0 tons.Steel strand distance of centre of gravity centroid of section distance is 28cm only.
Compared with prior art, the above-mentioned effect of utilizing hollowcore slab of the present utility model to reach is as follows: hollowcore slab plate quantity reduces 30%, makes the concrete amount of hollowcore slab and saves 35%; It is about 33% that dead load alleviates, the engineering quantity of respective lower structure reduced 20% and the quantity of bearing reduced 30%; Thereby the perpendicular distance that does not have the web rope but adopted base plate to join rope steel strand distance of centre of gravity section center of gravity has increased 47%, and the bending resistance of hollowcore slab is strengthened greatly, and this also makes the steel strand consumption reduce 45%.
Wide cut hollowcore slab of the present utility model is not limited to the foregoing description.In other bridge construction, can utilize equally.

Claims (2)

1. a bridge construction wide cut hollowcore slab comprises reinforcing bar, concrete, steel strand, it is characterized in that: the plate of this plate is wide to be 1.40-1.55m, and adopts prestress baseboard to join the rope scheme, and the rate of hollowing out is 50-65%.
2. wide cut hollowcore slab according to claim 1 is characterized in that: the perpendicular distance of steel strand distance of centre of gravity centroid of section is 35-45cm.
CN 03272952 2003-06-12 2003-06-12 Wide hollow board Expired - Lifetime CN2649640Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03272952 CN2649640Y (en) 2003-06-12 2003-06-12 Wide hollow board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03272952 CN2649640Y (en) 2003-06-12 2003-06-12 Wide hollow board

Publications (1)

Publication Number Publication Date
CN2649640Y true CN2649640Y (en) 2004-10-20

Family

ID=34330956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03272952 Expired - Lifetime CN2649640Y (en) 2003-06-12 2003-06-12 Wide hollow board

Country Status (1)

Country Link
CN (1) CN2649640Y (en)

Similar Documents

Publication Publication Date Title
CN201411822Y (en) Novel pre-tensioned steel-concrete composite beam
CN101338608B (en) Steel-concrete combined conversion joist
CN1974931A (en) Box type baseboard prestress concrete variable cross-section box girder bridge and construction method thereof
CN211036665U (en) Half-opening fully-prefabricated UHPC cover beam
CN206143645U (en) Stride across navigable river ultra -large -span girder steel assembling support
CN2649640Y (en) Wide hollow board
CN200985489Y (en) Built-in inclined support rigid frame prestressed concrete variable cross-section box beam bridge
CN101029530A (en) Spherical netted shell combined structure
CN207484264U (en) Suspension cable-suspension cable co-operative system bridge is turned round in four rope faces in the same direction
CN1974930A (en) Baseboard cable horizontal arrangement prestress concrete variable cross-section box girder bridge and construction method thereof
CN212271447U (en) Light-duty prefabricated stair of marking time and boundary beam common atress
CN200985490Y (en) Baseboard cable horizontal arranged prestressed concrete variable cross-section box beam bridge
CN2878480Y (en) Partial cable-stayed bridge saddle
CN1566535A (en) Wide breadth hollow slab and method for using the same
CN216427975U (en) Gate-type pier capping beam built-in anti-seismic steel bar structure
CN100491638C (en) Built-in oblique leg rigid-frame prestress concrete variable cross-section box girder bridge and construction method thereof
CN2697188Y (en) Saddle shaped glass daylight top supported by cable net node
CN209586402U (en) A kind of pretightning force anchor net
CN107542212A (en) A kind of Prefabricated porous plate being connected and attaching method thereof
CN103321137A (en) Groove-shaped bridge beam
CN2658264Y (en) Vertical prestress anchornig device
CN104060692A (en) Spatial beam and assemblies thereof
CN2830359Y (en) Boom of hoister
CN1042757C (en) Shell structural belt conveyer trestle bridge
CN202989914U (en) Pre-tensioning method prestress guard pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20130613

Granted publication date: 20041020