CN2649564Y - Plate house moving and mounting trolley - Google Patents
Plate house moving and mounting trolley Download PDFInfo
- Publication number
- CN2649564Y CN2649564Y CN 03234584 CN03234584U CN2649564Y CN 2649564 Y CN2649564 Y CN 2649564Y CN 03234584 CN03234584 CN 03234584 CN 03234584 U CN03234584 U CN 03234584U CN 2649564 Y CN2649564 Y CN 2649564Y
- Authority
- CN
- China
- Prior art keywords
- chassis
- vertical
- leg
- safety
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The trolley consists of a chassis, a support frame, working platforms, a vertical lifting mechanism, a vertical walking mechanism together with a rigid leg and a rope breaking protection device. The rigid leg is arranged at the main beam of the chassis of the trolley through a leg beam and fastened by a connecting pin. The rope breaking device consists of a safety protection steel ropes and a safety protector, which is fixed at the lifting steel rope and lies at the top end of every vertical walking mechanism or working platform. The rigid leg reduces the pressure exerted on the rollers and therefore avoids the occasional safety accidents out of the damage of roller which collapses the supporting frame. During use, the gravity center of the trolley is always inside of the area of the chassis, and therefore the utility model has a higher safety factor. The rope breaking protection device and the working platform guide rails guarantees the safety of the operating workers. The upright column of the support frame is hinge connected with the chassis, which can adjust the angle between the support frame and the ground to meet special needs. Bars inside of each part have the same module number. After disassembly, all the bars are placed into the working platforms, and the working platforms are fixed at the chassis side by side.
Description
Affiliated technical field
The utility model relates to a kind of operation chassis of using in the house of building, and specifically is that a kind of board-like house moves the installation chassis.
Background technology
Board-like house (being generally steel plate) is applied to heavy construction because of its special advantages, particularly in the large-sized workshop.And make its construction method that can not adopt general brick house room when the installation owing to its material has the characteristics of " weighing greatly ", and need suitable construction equipment, particularly need mobile large-scale installation chassis to satisfy the construction needs of shingle nail and ceiling floor simultaneously.At present, though the mobile installation chassis of existing a small amount of import is still waiting to improve on safety and ease of use.
Summary of the invention
The purpose of this utility model provides and a kind ofly can satisfy large-scale board-like house and build overall process, safe, easy to use mobile installation chassis.
The purpose of this utility model reaches like this: a kind of board-like house moves the installation chassis; constitute by chassis chassis, support, job platform, vertical-lift mechanism, vertical several parts of traveling gear, it is characterized in that: also have rigid leg and rope broken protector.Described rigid leg is to be formed by the identical part that the screw thread supporting leg vertically screws in the supporting leg crossbeam, and there is leg the below of screw thread supporting leg.Rigid leg is installed in by the supporting leg crossbeam on the chassis girder of chassis, and latch is fastening with connecting.The adjustable height of screw thread supporting leg.The touchdown point of the lower support leg of rigid leg and chassis roller is on same plane during support.Described rope broken protector is made of safety guard-safeguard steel rope and protector, is installed on the hoisting cable, is positioned at the upper end position of each vertical traveling gear and job platform.The upper end of safety guard-safeguard steel rope is connected with hoisting cable by protector, and the lower end is connected on the hoisting cable of upper position of the bottom that is positioned at vertical-lift mechanism, vertical traveling gear.
Job platform has several, and according to being placed on the support in proper order up and down, platform is provided with guardrail.Vertical-lift mechanism is meant hand-pulling cucurbit lift system.The column of support is hinged with being connected of chassis.
The utlity model has following advantage:
1, safety factor height owing to increased rigid leg on the chassis, has alleviated the pressure that roller bore, and has avoided roller to damage the accidental safety misadventure that gas leakage produces support tilt, has stopped potential safety hazard.Simultaneously, rigid leg is in the areal extent of chassis mobile trolley used its center of gravity in use, specific counterweight need be set just can guarantee its safety.Simultaneously, the job platform of safety guard and guardrail formula is protected operating personnel's safety more, and the alerting ability of operation has more been strengthened.
2, the column of support and chassis are hinges, can utilize strut to adjust the squareness of support and horizontal surface, column can appropriateness turn forward, therefore can be according to the needs of construction, and the operation needs of special operation condition are satisfied in the adjustment that makes support and ground-surface angle do certain limit.
3, job platform has several, and the scope of adjustable height is big, satisfies the layering and the needs highly of the installation exercise of major industry factory building shingle nail and roofing ceiling floor fully.
4, all by unified modulus design, whole rod members all can be put into job platform to the length of each parts after the dismounting, and job platform is fixed on the chassis side by side, does transition and travel under the traction of autotruck, has not only saved traffic cost, and on-the-spot use is also very convenient.
Description of drawings
Fig. 1 is the front view of the utility model structural representation.
Fig. 2 is the lateral plan of the utility model structural representation.
Fig. 3 is the structural representation cutaway view of rigid leg of the present utility model.
Fig. 4 is the structure scheme of installation of rigid leg of the present utility model.
Fig. 5 is rope broken protector structure of the present utility model and scheme of installation.Among the figure, 1. go up drop hanger, 2. protector, 3. vertical-lift mechanism admittedly; 4. job platform, 5. hoisting cable, 6. vertical traveling gear; 7. 8. head tree supports mobile jib, 9. rigid leg; 10. chassis chassis, (11) chassis tire, (12) cross-tie; (13) horizontal support, (14) safety guard-safeguard steel rope, 9.-1 rigid leg crossbeam; 9.-2 screw thread supporting leg, 9.-3 9.-4 lower support leg connects latch.
Accompanying drawing also is an embodiment.
In the present embodiment, 4. job platform has three, certainly, with the supporting vertical-lift mechanism of job platform 3., 6. vertical traveling gear also be three with rope broken protector.8. 7. head tree support mobile jib, cross-tie (12), and horizontal support (13) has constituted support.Go up admittedly 1. fixing steel rope of drop hanger.
The range of job platform is 1~10 meter, head tree 7. can turn forward 10 the degree, make support and ground-surface angle do the adjustment of 70-100 degree scope, cooresponding plane setting range is 4~10 meters.Therefore can satisfy the operation needs of the special operation condition under outdoor aproll and the not completion situation of drainage system fully.
9.-4 9. rigid leg be installed on the chassis girder 10. of chassis by latch.It is to be added with 9.-2 vertical rigid leg crossbeam identical part 9.-1 li that screws in of lower support leg screw thread supporting leg 9.-3 by one to be formed by connecting.During support lower support leg 9.-3 with the touchdown point of chassis roller (11) on same plane.9.-1 rigid leg can regulate the planimetric position by the supporting leg crossbeam, 9.-2 regulates height by the screw thread supporting leg.When chassis moves, take off latch and 9.-4 can take off rigid leg 9..
2. rope broken protector is made of safety guard-safeguard steel rope (14) and protector, be installed in hoisting cable 5. go up, be positioned at each vertical-lift mechanism 3. with job platform top 4..5. the upper end of safety guard-safeguard steel rope (14) 2. is connected with hoisting cable by protector; the lower end direct connection is positioned at vertical elevator structure bottom, vertical traveling gear upper position 5. 3. on 5. at hoisting cable, guarantees the safety of operating personnel when 5. 4. job platform because of chance rupture with hoisting cable.3. vertical-lift mechanism adopts hand-pulling cucurbit lift system more laborsaving than shaking lift system, has avoided shortage of manpower and the safety misadventure brought.Chassis adopts 650 tires in this example, and bearing capacity is big.
Claims (2)
1; a kind of house moves the installation chassis; by the chassis chassis; support; job platform; vertical-lift mechanism; several parts of vertical traveling gear constitute; it is characterized in that: also have rigid leg and rope broken protector; rigid leg is to be formed by connecting with the identical part that the screw thread supporting leg vertically screws in the supporting leg crossbeam; there is lower support leg the below of screw thread supporting leg; rigid leg is installed on the chassis girder of chassis by the supporting leg crossbeam; latch is fastening with connecting; rope broken protector is made of safety guard-safeguard steel rope and protector; be installed on the hoisting cable; be positioned at the upper end position of each vertical traveling gear and job platform; the upper end of safety guard-safeguard steel rope is connected with hoisting cable by protector, and the lower end is connected the bottom that is positioned at vertical-lift mechanism; on the hoisting cable of the upper position of vertical traveling gear.
2, mobile installation chassis as claimed in claim 1, it is characterized in that: described job platform has several, according to being placed on the support in proper order up and down, job platform is provided with guardrail, described vertical-lift mechanism is meant hand-pulling cucurbit lift system, and the column of described support is hinged with being connected of chassis chassis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03234584 CN2649564Y (en) | 2003-05-27 | 2003-05-27 | Plate house moving and mounting trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03234584 CN2649564Y (en) | 2003-05-27 | 2003-05-27 | Plate house moving and mounting trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2649564Y true CN2649564Y (en) | 2004-10-20 |
Family
ID=34326326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03234584 Expired - Fee Related CN2649564Y (en) | 2003-05-27 | 2003-05-27 | Plate house moving and mounting trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2649564Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102009930A (en) * | 2010-12-01 | 2011-04-13 | 沈阳建筑大学 | Installation rack for height operation platform elevator |
CN101670994B (en) * | 2009-08-12 | 2012-02-29 | 杭州赛奇高空作业机械有限公司 | Lifting working platform for construction |
CN102514550A (en) * | 2011-12-20 | 2012-06-27 | 长沙中联消防机械有限公司 | Engineering machinery and safety state determining method, device and system thereof |
CN108092181A (en) * | 2017-12-27 | 2018-05-29 | 乐清市中久电气科技有限公司 | A kind of portable electric cable fittings mounting platform |
-
2003
- 2003-05-27 CN CN 03234584 patent/CN2649564Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101670994B (en) * | 2009-08-12 | 2012-02-29 | 杭州赛奇高空作业机械有限公司 | Lifting working platform for construction |
CN102009930A (en) * | 2010-12-01 | 2011-04-13 | 沈阳建筑大学 | Installation rack for height operation platform elevator |
CN102514550A (en) * | 2011-12-20 | 2012-06-27 | 长沙中联消防机械有限公司 | Engineering machinery and safety state determining method, device and system thereof |
CN102514550B (en) * | 2011-12-20 | 2014-04-30 | 长沙中联消防机械有限公司 | Engineering machinery and safety state determining method, device and system thereof |
CN108092181A (en) * | 2017-12-27 | 2018-05-29 | 乐清市中久电气科技有限公司 | A kind of portable electric cable fittings mounting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201679222U (en) | Two-masted climbing working platform | |
CN206828042U (en) | A kind of inspection platform of power station main building rack illuminator | |
CN116136122A (en) | Integrated attached type inclined lifting climbing frame system and use method thereof | |
CN109296192B (en) | Lifting frame for assembled building | |
CN111236613A (en) | Protection platform for building construction and use method thereof | |
CN2649564Y (en) | Plate house moving and mounting trolley | |
CN213626572U (en) | Tool type external cantilever operation platform | |
CN213416063U (en) | Overhead hanging basket for steel reinforcement framework | |
CN210049105U (en) | Self-propelled bridge formwork operation trolley | |
CN209873572U (en) | Interim navigation lifting station of adjustable vertical lift height | |
CN215714714U (en) | Hanging basket equipment for installing bridge guardrail | |
CN111058609A (en) | Construction and protection integrated portable operation platform and method | |
CN213356779U (en) | Overweight steel column translation transportation installation device | |
CN202023149U (en) | Hanging basket used in construction | |
CN115258908A (en) | Landscape engineering stone dry-hanging construction device and construction method | |
CN213653209U (en) | Integrated construction movable platform for bridge flange plate | |
CN210366717U (en) | Be applied to console mode and from climbing formula whole construction work platform | |
CN210886924U (en) | Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area | |
CN2871634Y (en) | Bridge maintaining equipment | |
CN209958220U (en) | Movable trolley for mounting and dismounting railing | |
CN112125244A (en) | Working platform capable of ascending and descending along arc dome and installation method thereof | |
CN214613654U (en) | Bridge maintenance device | |
CN216587576U (en) | Truss overhauls platform | |
CN2775016Y (en) | Headframe type two purpose construction lift for person and goods | |
CN217756625U (en) | Existing building roof hoist and mount system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |