CN2630307Y - Bridge rope-placing cat walk and suspension system apparatus - Google Patents

Bridge rope-placing cat walk and suspension system apparatus Download PDF

Info

Publication number
CN2630307Y
CN2630307Y CN 03231956 CN03231956U CN2630307Y CN 2630307 Y CN2630307 Y CN 2630307Y CN 03231956 CN03231956 CN 03231956 CN 03231956 U CN03231956 U CN 03231956U CN 2630307 Y CN2630307 Y CN 2630307Y
Authority
CN
China
Prior art keywords
rope
aisle
walkway
joist
cords
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03231956
Other languages
Chinese (zh)
Inventor
顾海欢
茅卫生
金东华
李茂兴
严进标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Original Assignee
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION ENGINEERING Co OF SHANGHAI CITY filed Critical FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority to CN 03231956 priority Critical patent/CN2630307Y/en
Application granted granted Critical
Publication of CN2630307Y publication Critical patent/CN2630307Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge cord laying cat passage and suspension system device. Two cat passages are respectively arranged in the central positions of an upstream horizontal cord and a downstream horizontal cord, and each cat passage consists of a walkway, an anchoring system and a trimmer joist. The walkway consists of six walkway cords that are positioned with an irregular interval, and is provided with steel plate walkway mesh pieces and antiskid wooden strips on the surface. The steel plate walkway mesh pieces and antiskid wooden strips are bound with iron wires. A bracket is arranged on the walkway every five meters, and each bracket has a roller wheel. Each bracket is connected with the walkway cords via U-shaped clips, and the walkway cords are anchored on the transverse dummy plates on the reserved section of the bridge surface. The track cords and handrail cords are anchored on the bottom plate of the arch rib of the midspan. The anchoring system is provided with pin rolls in the double-piece lifting ears, and connected with a 20-ton assembly pulley having a 5-ton hand-operated adjusting hoist. Six supporting trimmer joists are evenly arranged below the arch rib of the midspan, and each trimmer joist is suspended on the arch rib via steel cables. A platform is provided below each end of a trimmer joist, and the walkway cords are fixed at the bottom of the platform via press plates. The utility model can be used as the auxiliary passage system device for the laying construction of ultra-heavy ultra-long vertical cords across the river before the bridge surface is built in place.

Description

Bridge rope-placing cat walk and suspension system apparatus
Technical field
The utility model relates to a kind of bridge rope-placing cat walk and suspension system apparatus, and particularly the horizontal rope of ultralong overweight is crossed over the accessory channel system and device that uses in the river surface erection construction before bridge floor is not in place.
Background technology
In the world, the horizontal rope of large span arch bridge erection ultralong overweight is striden in the process of river, and general the employing on the arch put the rope method, and the water surface crosses that Suo Fa is put in the river and auxiliary cableway is installed the rope method of putting.Reach 550 meters Lu Pu bridge for the main span degree, used horizontal rope is in weight, length, diameter and stretching force are unprecedented in rope of the same type, if adopt on the arch and put the rope method, the arch rib that utilization installs is made passage, the subject matter that exists is that the span centre arch rib exceeds about 60 meters than bridge floor, and the width that tilts to the inside diminishes gradually and since the interim knotted rope of arch rib do not remove as yet, horizontal Suo Wufa is transferred to the bridge floor position from arch rib, therefore, workload and the required tractive force of arranging horizontal rope traction and pulley system on the arch rib end face are all very big, and existing equipment can't meet the demands; Cross the river from the water surface and set up, need a large amount of operation at sea, influence the navigation channel, and long construction period, can't satisfy construction period, horizontal rope of while sets up quality also to be difficult to guarantee; Adopt auxiliary cableway to install, the sag of horizontal rope is difficult to control, and construction risk is big, and the tension force of trailer system is very big, and existing equipment can't meet the demands.
Summary of the invention
The purpose of this utility model provides the construction equipment of a kind of auxiliary cat road and the combination of joist suspension, solves the horizontal rope of ultralong overweight and strides the difficult problem that set up in the river, guarantees that the horizontal Suo Shunli of Lu Pu bridge crosses the river and sets up.
For realizing the purpose of this utility model, the technical scheme that is adopted is: a kind of bridge rope-placing cat walk and suspension system apparatus, set up two cat roads respectively in the horizontal rope of upstream and downstream center, per pass cat road is by the aisle, anchor system and joist are partly formed, the aisle is by six roots of sensation aisle rope equidistant placement not, laying steel plate aisle net sheet above is connected with anti-skidding batten and by the iron wire colligation, the support that in the system of aisle, has roller together every five meters settings, support is connected by U type folder with the aisle rope, be provided with the track rope above the support, two limits, aisle are provided with manrope, the aisle rope is anchored in bridge floor and reserves on the diaphragm of section, during being anchored in, track rope and manrope stride on the arch rib base plate, anchor system is established bearing pin in the biplate hanger, and be connected with five tons and pull 20 tons of assembly pulleys regulating cucurbit, in stride supportings joist in six roads evenly be set under the arch rib, the per pass joist is suspended on the arch rib by wire rope, joist two ends below is provided with platform, the aisle rope is fixed on the platform bottom by pressing plate, and the track rope is through the roller at joist top.Mao Dao two ends tension force is in 20 tons, and the span centre maximum defluxion is within two and half.Aisle rope diameter is 32 millimeters a independent wire strand, and track rope diameter is 28 millimeters a independent wire strand.The joist diameter is 900 millimeters, and wall thickness is 20 millimeters, and length is 39 meters steel pipe, and the wirerope diameter that hangs joist is 65 millimeters.
The utility model is owing to adopted technique scheme, therefore setting up the horizontal rope of ultralong overweight, particularly striding the beneficial effect that is had in the erection construction of river at the horizontal rope of Lu Pu bridge is to utilize auxiliary cat road system can solve the horizontal rope of ultralong overweight to stride the difficult problem that set up in the river; Simultaneously, cat road and joist system organically combine, and suspend line style control problem in the air in midair before having solved horizontal rope bridge floor not being in place under stress state, and short construction period, to the minimum that influences in navigation channel.
Description of drawings
Accompanying drawing 1 is a cat of the present utility model road general arrangement.
Accompanying drawing 2 is aisle of the present utility model system schematic.
Accompanying drawing 3 is joist structural representations of the present utility model.
This implementation method of tool
Below in conjunction with accompanying drawing the utility model is described in further detail.
Among Fig. 1 to 3, the utility model bridge cat road and suspension system apparatus arrange that by horizontal rope set up two cat roads respectively in the horizontal rope of upstream and downstream center, every cat road is wide three meters, long 384 meters.The cat road is anchored at respectively on the corresponding arch rib base plate by assembly pulley, and upstream and downstream cat road forms whole by six road joists 1.Per pass cat road is by aisle 2, anchor system and joist 1 part are formed, aisle 2 is by six roots of sensation aisle rope 3 equidistant placement not, laying steel plate aisle net sheet above is connected with anti-skidding batten and by the iron wire colligation, the support 5 that on aisle 2, has roller together every five meters settings, supply water and use when flat rope draws, support 5 is connected by U type folder 4 with aisle rope 3, be provided with track rope 6 above the support 5,2 two limits, aisle are provided with manrope 7 and safety net 8, aisle rope 3 is anchored in bridge floor and reserves on the diaphragm of section, during being anchored in, track rope 6 and manrope 7 stride on the arch rib base plate, anchor system adopts the biplate hanger to add pin shaft structure, connect 20 tons of assembly pulleys again, use five tons to pull the position that the adjusting cucurbit is regulated the cat road, in stride supportings joist 1 in six roads evenly be set under the arch rib, every joist 1 is 900 millimeters by diameter, wall thickness is 20 millimeters, length is that 39 meters steel pipe is made, and to use diameter be that 65 millimeters wire rope 10 is suspended on the arch rib, joist 1 two ends below is provided with platform 9, and diameter is that 32 millimeters aisle rope 3 is fixed on platform 9 bottoms by pressing plate, and diameter is the roller at 28 millimeters track rope 6 process joists 1 top.Mao Dao two ends tension force is in 20 tons, and the span centre maximum defluxion is within two and half.

Claims (4)

1. bridge rope-placing cat walk and suspension system apparatus, be respectively equipped with two cat roads in the horizontal rope of upstream and downstream center, it is characterized in that: per pass cat road is by aisle (2), anchor system and joist (1) part is formed, described aisle (2) is by six roots of sensation aisle rope (3) equidistant placement not, being provided with steel plate aisle net sheet above is connected with anti-skidding batten and by the iron wire colligation, (2) go up the support (5) that has roller every five meters settings together in the aisle, support (5) is connected by U type folder (4) with aisle rope (3), be provided with track rope (6) above the support (5), (2) two limits, aisle are provided with manrope (7), aisle rope (3) is anchored in bridge floor and reserves on the diaphragm of section, strides on the arch rib base plate during track rope (6) and manrope (7) are anchored in; Described anchor system is established bearing pin in the biplate hanger, and is connected with five tons of 20 tons of assembly pulleys that pull the adjusting cucurbit; Described joist (1) two end below is provided with platform (9), aisle rope (3) is fixed on platform (9) bottom by pressing plate, track rope (6) is through the roller at joist (1) top, stride under the arch rib during six roads supporting joists (1) evenly are arranged on, per pass joist (1) is suspended on the arch rib by wire rope (10).
2. according to the described bridge rope-placing cat walk of claim 1 system and device, it is characterized in that described Mao Dao two ends tension force is in 20 tons, the span centre maximum defluxion is within 2.5 meters.
3. according to the described bridge rope-placing cat walk of claim 1 system and device, it is characterized in that described aisle rope (3) diameter is 32 millimeters a independent wire strand, track rope (6) diameter is 28 millimeters a independent wire strand.
4. according to the described bridge rope-placing cat walk of claim 1 system and device, it is characterized in that described joist (1) diameter is 900 millimeters, wall thickness is 20 millimeters, and length is 39 meters steel pipe; Wire rope (10) diameter that hangs joist (1) is 65 millimeters.
CN 03231956 2003-06-09 2003-06-09 Bridge rope-placing cat walk and suspension system apparatus Expired - Fee Related CN2630307Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03231956 CN2630307Y (en) 2003-06-09 2003-06-09 Bridge rope-placing cat walk and suspension system apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03231956 CN2630307Y (en) 2003-06-09 2003-06-09 Bridge rope-placing cat walk and suspension system apparatus

Publications (1)

Publication Number Publication Date
CN2630307Y true CN2630307Y (en) 2004-08-04

Family

ID=34291307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03231956 Expired - Fee Related CN2630307Y (en) 2003-06-09 2003-06-09 Bridge rope-placing cat walk and suspension system apparatus

Country Status (1)

Country Link
CN (1) CN2630307Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256725A (en) * 2015-10-29 2016-01-20 中交第二航务工程局有限公司 Wide catwalk for erection of double main cables
CN106087712A (en) * 2016-08-11 2016-11-09 上海市政工程设计研究总院(集团)有限公司 It is applicable to the rolling support system of the jump stay of Long-Span Tied Arch Bridge
CN106758859A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of suspension bridge cat road head-rope changes shifting displacement fixing device and method
CN110983978A (en) * 2019-12-16 2020-04-10 四川省公路规划勘察设计研究院有限公司 Method for installing tie bar of arch bridge
CN112575685A (en) * 2020-12-08 2021-03-30 上海市基础工程集团有限公司 Heavy tie bar river-crossing construction device for large-span basket type steel arch bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256725A (en) * 2015-10-29 2016-01-20 中交第二航务工程局有限公司 Wide catwalk for erection of double main cables
CN105256725B (en) * 2015-10-29 2017-05-17 中交第二航务工程局有限公司 Wide catwalk for erection of double main cables
CN106087712A (en) * 2016-08-11 2016-11-09 上海市政工程设计研究总院(集团)有限公司 It is applicable to the rolling support system of the jump stay of Long-Span Tied Arch Bridge
CN106758859A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of suspension bridge cat road head-rope changes shifting displacement fixing device and method
CN106758859B (en) * 2017-03-13 2019-06-25 中交四公局第六工程有限公司 A kind of suspension bridge cat road head-rope changes shifting and conjugates fixed device and method
CN110983978A (en) * 2019-12-16 2020-04-10 四川省公路规划勘察设计研究院有限公司 Method for installing tie bar of arch bridge
CN110983978B (en) * 2019-12-16 2021-05-04 四川省公路规划勘察设计研究院有限公司 Method for installing tie bar of arch bridge
CN112575685A (en) * 2020-12-08 2021-03-30 上海市基础工程集团有限公司 Heavy tie bar river-crossing construction device for large-span basket type steel arch bridge

Similar Documents

Publication Publication Date Title
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN101476293B (en) Non-stand construction method for large bridge arch rib
CN201172597Y (en) Wide span heavy-load cable hoisting machine
CN101224856A (en) Long-span load-carrying cable lifting machine and mounting method therefor
CN103790114B (en) Hydraulic haulage and roller are walked the deck unit erection gantry and traveling method thereof that combine
CN109488038A (en) Across the mounting structure and installation method of the beam string flexible cable of existing building
CN2630307Y (en) Bridge rope-placing cat walk and suspension system apparatus
CN209508834U (en) A kind of multispan continuously arranges CABLEWAY ERECTION SYSTEM
CN2597531Y (en) Single rope face tracting rope hanging cage
CN110143525A (en) A kind of deck unit erection gantry for having wide-angle and swinging shifting and climbing capacity
CN111924720A (en) Wind cable anchoring system of cable crane tower and construction method
CN108505623A (en) A kind of overhead cable construction method suitable for flexible double rope net system
CN101173501A (en) Cable jam-packed machine and its jamming method
CN114873483A (en) Suspension cable type hanger rail hoisting equipment and construction method thereof
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN2630308Y (en) Bridge rope placing apparatus
CN205329550U (en) Suspension bridge catwalk system
CN2871634Y (en) Bridge maintaining equipment
CN106505479B (en) High-rise shelf cable laying method and device in tunnel
CN201473146U (en) Trackless elevator
CN2477597Y (en) Lifting device of jenny
CN205954493U (en) Wet seam of balanced free cantilever erection span centre of self -propelled is with adjustment roof beam
CN221029618U (en) Cast-in-situ box girder prestress tensioning jack adjusting device
CN205634685U (en) Cable crane hoist
CN208869202U (en) A kind of deck type with T-type overhead traveling crane is multi-tower continuous across cable crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee