CN2620726Y - Combined manhole structural component - Google Patents
Combined manhole structural component Download PDFInfo
- Publication number
- CN2620726Y CN2620726Y CN 03242227 CN03242227U CN2620726Y CN 2620726 Y CN2620726 Y CN 2620726Y CN 03242227 CN03242227 CN 03242227 CN 03242227 U CN03242227 U CN 03242227U CN 2620726 Y CN2620726 Y CN 2620726Y
- Authority
- CN
- China
- Prior art keywords
- pit
- component
- borehole wall
- inspection
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
A combined type inspection pit component, solves the problems that a brick inspection pit and a concrete placement inspection pit have sewage exosmosis, pollute the environment and the ground water. The combined type inspection pit component comprises a tubular pit wall, a reinforcing and pressurizing ring used as a pit ring is precast at the upper end of the pit wall, and a tube mounting hole matched with a flow channel on a flow channel bottom plate is precast at the lower end of the pit wall. A lengthened pit wall can be precast on the upper part of the pit wall, and the flow channel bottom plate can be precast at the bottom of the pit wall. The inspection pit component can be a reinforced concrete precast component, a glass reinforced plastic precast component or a plastic precast component. The inspection pit changes the traditional brick and concrete placement structure, and precasts the inspection pit to be an integral component. The inspection pit has the advantages of convenient transportation and burial, long service life, and convenient plant production, and in particular, the inspection pit made of glass reinforced plastics has the advantages of anti-corrosion, good water tightness, and light weight. After experiment tests, the performance indexes of the inspection pit built with the component can completely meet operation requirements on drainage works in residential districts. The inspection pit component can also be used as a water meter pit, a valve pit, a fuel gas pit, and a telecommunication pit.
Description
Technical field: the utility model relates to the manhole member in the drainage works.
Background technology: at present, according to the needs of national economic development planning and national industrial policies and environmental protection, water resource recycling, housing industrialization, drainage works has in recent years begun to promote edible plastic tubing.But as very important manhole in the drainage system, still adopt brick and concrete pouring, because its physicochemical property instability, in use seepage and damage are more serious, cause sewage to exosmose, contaminated environment and underground water, for this reason, cooperate promoting the use of of plastic pipe, exploitation can just seem extremely important by matching used with it manhole member.
Summary of the invention: the utility model purpose is to solve brick and concrete pouring manhole sewage exosmoses contaminated environment and phreatic problem.
The combined inspection shaft member that the utility model provides, comprise tubular sidewall, this tubular sidewall is integral prefabricated member, in the upper end of this borehole wall or up and down to be shaped in advance with the borehole wall be the reinforcement supercharging ring of one in the end at two ends, the double simultaneously walling crib of doing of supercharging ring is strengthened in the upper end, the lower end of tubular sidewall be shaped in advance with the chute base plate on 2~6 piping erection holes matching of chute, can a prefabricated bell socket that is used for pipe laying of outwards routing up around the installing hole.
Can prefabricated 1~8 lengthening borehole wall above tubular sidewall, strengthen the supercharging ring at the upper end and prefabricated 1~4 of the middle part of this lengthening borehole wall, at the prefabricated one group of shaft orientation reinforcing rib of periphery of the lengthening borehole wall.Can a prefabricated chute base plate in the bottom of tubular sidewall, can prefabricated 2~6 corresponding pipeline chutes in the piping erection hole site with the tubular sidewall lower end on the chute base plate.
Tubular sidewall, the lengthening borehole wall and chute base plate can be precast member for reinforcing bar concrete, also can be the glass fiber reinforced plastic prefabricated units, or the plastics prefabricated units.
The utility model advantage: this manhole has changed the structure of traditional brick and concrete pouring, manhole is prefabricated into integrated member, have transportation and bury convenience, long service life underground, be convenient to the characteristics of plant produced, particularly adopt the manhole of glass fiber reinforced plastic manufacturing also have the intensity height, corrosion-resistant, watertightness good, lightweight characteristics.Through experiment test, the performance indications of the manhole that this member is built can satisfy the instructions for use of residential quarters internal drainage engineering fully.This manhole member can also use as water meter chamber, pipe valve well, combustion gas well, telecommunications well.
Description of drawings:
Fig. 1, combined inspection shaft element structure schematic diagram;
Fig. 2, straight line well element structure master look, vertical view;
Fig. 3, turning well element structure master look, vertical view;
Fig. 4, Fig. 5, top-cross remittance well element structure master look, vertical view;
Fig. 6, two top-cross remittance well element structure master look, vertical view.
The specific embodiment:
As shown in Figure 1, this combined inspection shaft member, comprise tubular sidewall 1, this tubular sidewall is integral prefabricated member, in the upper end of this borehole wall or up and down the end at two ends be shaped in advance with the borehole wall be that (this supercharging ring can be gained in strength on the one hand for the reinforcement supercharging ring 2 of one, can prevent borehole wall play displacement up and down on the other hand), the double simultaneously walling crib of doing of supercharging ring is strengthened in the upper end, the lower end of tubular sidewall be shaped in advance with the chute base plate on 2~6 piping erection holes 3 matching of chute, can a prefabricated bell socket that is used for pipe laying 45 of outwards routing up around the piping erection hole.
Degree of depth difference according to manhole, the top of tubular sidewall can prefabricated 1~8 lengthening borehole wall 6 (this example lengthening borehole wall that only draws, roughly the same surplus), supercharging ring 2 is strengthened at upper end and prefabricated 1~4 of middle part at this lengthening borehole wall, the double simultaneously walling crib of doing of supercharging ring is strengthened in the upper end, place (concrete) well lid 7 in the walling crib, the lower end cooperates with the tubular sidewall or the lengthening borehole wall of below.Bottom at tubular sidewall can also be shaped on a chute base plate 8 in advance.These chute base plate prefabricated units also can save, and directly build out a chute base plate with brick and concrete at the bottom of manhole.
Tubular sidewall in the utility model, the lengthening borehole wall and chute base plate can be precast member for reinforcing bar concrete, also can be the glass fiber reinforced plastic prefabricated units, or the plastics prefabricated units.This example is selected the glass fiber reinforced plastic prefabricated units especially for use.Accompanying drawing 2~6 has provided several multi-form installing holes and chute base plate runner schematic diagram, and Fig. 2 is the straight line well, and Fig. 3 is the bend well, and Fig. 4,5 is that a top-cross is converged well, and Fig. 6 is the both sides well that crosses.
Embodiment 2
This example is shaped on a chute base plate 8 in advance in the bottom of tubular sidewall, can prefabricated 2~6 corresponding pipeline chutes in the piping erection hole site with the tubular sidewall lower end on the chute base plate.This chute can be not prefabricated yet, and when construction, according to the position of installing hole, build out chute with brick and concrete on the chute base plate.
When selecting the glass fiber reinforced plastic prefabricated units for use, can be shaped on one group of shaft orientation reinforcing rib in advance in the periphery of the lengthening borehole wall, to improve its intensity, all the other structures are with example one.
Claims (7)
1, a kind of combined inspection shaft member, comprise tubular sidewall, it is characterized in that this tubular sidewall is integral prefabricated member, in the upper end of this borehole wall or up and down to be shaped in advance with the borehole wall be the reinforcement supercharging ring of one in the end at two ends, the double simultaneously walling crib of doing of supercharging ring is strengthened in the upper end, the lower end of tubular sidewall be shaped in advance with the chute base plate on 2~6 piping erection holes matching of chute.
2, combined inspection shaft member according to claim 1 is characterized in that the piping erection hole on the borehole wall can a prefabricated bell socket that is used for pipe laying of outwards routing up all around.
3, combined inspection shaft member according to claim 1 and 2, it is characterized in that above tubular sidewall can prefabricated 1~8 lengthening borehole wall, the supercharging ring is strengthened at upper end and prefabricated 1~4 of middle part at this lengthening borehole wall, the double simultaneously walling crib of doing of supercharging ring is strengthened in the upper end, and the lower end cooperates with the tubular sidewall or the lengthening borehole wall of below.
4, combined inspection shaft member according to claim 3 is characterized in that being shaped on one group of shaft orientation reinforcing rib in advance in the periphery of the lengthening borehole wall.
5, combined inspection shaft member according to claim 1 and 2 is characterized in that being shaped on a chute base plate in advance in the bottom of tubular sidewall.
6, combined inspection shaft member according to claim 5, it is characterized in that can prefabricated 2~6 corresponding pipeline chutes in the piping erection hole site with the tubular sidewall lower end on the chute base plate.
7, according to claim 1,2,4,6 described combined inspection shaft members, it is characterized in that tubular sidewall, the lengthening borehole wall and chute base plate can be precast member for reinforcing bar concrete, also can be the glass fiber reinforced plastic prefabricated units, or the plastics prefabricated units.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03242227 CN2620726Y (en) | 2003-03-21 | 2003-03-21 | Combined manhole structural component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03242227 CN2620726Y (en) | 2003-03-21 | 2003-03-21 | Combined manhole structural component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2620726Y true CN2620726Y (en) | 2004-06-16 |
Family
ID=34250521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03242227 Expired - Fee Related CN2620726Y (en) | 2003-03-21 | 2003-03-21 | Combined manhole structural component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2620726Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101591920B (en) * | 2009-06-19 | 2011-06-08 | 朱新良 | Novel street lamp wire connection well |
CN102102393A (en) * | 2010-12-21 | 2011-06-22 | 慈溪市德顺容器有限公司 | Inspection shaft |
CN102518149A (en) * | 2011-12-15 | 2012-06-27 | 昆明理工大学 | Plastic inspection well and assembling method thereof |
CN102787615A (en) * | 2012-08-28 | 2012-11-21 | 济南水务集团有限公司 | Anti-seepage meter well |
CN103696443A (en) * | 2013-12-31 | 2014-04-02 | 中国地质大学(北京) | Prefabricated assembly-type inspection well |
CN108035425A (en) * | 2017-11-28 | 2018-05-15 | 中国二十冶集团有限公司 | Drainage pipeline is connected prefabricated interface construction method with well body |
CN113914369A (en) * | 2021-10-08 | 2022-01-11 | 重庆永悦汇管廊科技有限公司 | Concrete inspection well |
-
2003
- 2003-03-21 CN CN 03242227 patent/CN2620726Y/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101591920B (en) * | 2009-06-19 | 2011-06-08 | 朱新良 | Novel street lamp wire connection well |
CN102102393A (en) * | 2010-12-21 | 2011-06-22 | 慈溪市德顺容器有限公司 | Inspection shaft |
CN102518149A (en) * | 2011-12-15 | 2012-06-27 | 昆明理工大学 | Plastic inspection well and assembling method thereof |
CN102787615A (en) * | 2012-08-28 | 2012-11-21 | 济南水务集团有限公司 | Anti-seepage meter well |
CN103696443A (en) * | 2013-12-31 | 2014-04-02 | 中国地质大学(北京) | Prefabricated assembly-type inspection well |
CN103696443B (en) * | 2013-12-31 | 2016-01-13 | 中国地质大学(北京) | Precast splice type manhole |
CN108035425A (en) * | 2017-11-28 | 2018-05-15 | 中国二十冶集团有限公司 | Drainage pipeline is connected prefabricated interface construction method with well body |
CN113914369A (en) * | 2021-10-08 | 2022-01-11 | 重庆永悦汇管廊科技有限公司 | Concrete inspection well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210031914U (en) | Assembled inspection shaft | |
CN201232197Y (en) | Combined inspection well | |
CN2918937Y (en) | Steel faucet pre-stressed concrete pipe | |
CN202208931U (en) | Individual combination type inspection well | |
CN2620726Y (en) | Combined manhole structural component | |
CN201772155U (en) | Four-circle arch channel with base | |
CN104278738A (en) | Pump station base, pump station and mounting method for pump station | |
CN202247719U (en) | Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge | |
CN208633120U (en) | A kind of pattern foundation pit supporting structure assembled concrete-filled rectangular steel tube diagonal brace | |
CN104179239B (en) | A kind of Integral glass fibre reinforced plastic inspection pit | |
CN2799670Y (en) | Prefabricated glass fiber reinforced plastic inspection well | |
CN108951657A (en) | A kind of pattern foundation pit supporting structure assembled concrete-filled rectangular steel tube diagonal brace | |
CN106592635A (en) | Integrated inspection shaft and installation method thereof | |
CN201196299Y (en) | Prefabricated concrete pipe gallery | |
CN200943254Y (en) | Outdoor buried large caliber water-exhausting pipe | |
CN201770583U (en) | Unit bucket integrated assembled type septic tank | |
CN209399990U (en) | Open-air surface observation mound structure | |
CN203429781U (en) | Pump station base and pump station | |
CN2597552Y (en) | Prefabricated concrete round door arch type manhole | |
CN203475593U (en) | Pump station base and pump station | |
CN208201925U (en) | prefabricated rainwater inspection well | |
CN2743440Y (en) | Environment-friendly assembled inspection well | |
CN216973641U (en) | Positioning prefabricated base | |
CN221255691U (en) | Assembled integrated sinking tank | |
CN213926648U (en) | Assembled precast concrete pond |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |