CN2595792Y - Soil quick percolation analogue device - Google Patents

Soil quick percolation analogue device Download PDF

Info

Publication number
CN2595792Y
CN2595792Y CN 03211215 CN03211215U CN2595792Y CN 2595792 Y CN2595792 Y CN 2595792Y CN 03211215 CN03211215 CN 03211215 CN 03211215 U CN03211215 U CN 03211215U CN 2595792 Y CN2595792 Y CN 2595792Y
Authority
CN
China
Prior art keywords
main body
pipe
diafiltration
diafiltration post
percolation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03211215
Other languages
Chinese (zh)
Inventor
郭伟
李培军
台培东
贾宏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Applied Ecology of CAS
Original Assignee
Institute of Applied Ecology of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Applied Ecology of CAS filed Critical Institute of Applied Ecology of CAS
Priority to CN 03211215 priority Critical patent/CN2595792Y/en
Application granted granted Critical
Publication of CN2595792Y publication Critical patent/CN2595792Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to a quick percolation technique, more specifically relates to a soil quick percolation analogue device. The utility model is mainly composed of an upper end of a percolation column, a main body of the percolation column, a pipe plug, and pipe hoops, wherein, the upper end of the percolation column is provided with a water supply opening and a water level positioning opening, the water supply opening and the water level positioning opening are respectively connected with an amphibious pump and a water supply tank through pipelines, the bottom of the upper end of the percolation column is connected with one end of the main body of the percolation column through the pipe hoop, the main body of the percolation column is provided with a side sampling hole, the interior of the pipe plug is provided with a lattice, the pipe plug is connected with the other end of the main body of the percolation column through the pipe hoop, and the lower end of the pipe hoop is provided with a lower sampling hole. The utility model has the characteristics of multi purposes, convenient soil filling, raw material saving, etc.

Description

A kind of rapid infiltration land simulator
Technical field
The utility model relates to quick diafiltration technology, specifically a kind of rapid infiltration land simulator.
Background technology
Diafiltration is one of important technical of polluted water land processing fast, receive domestic and international concern for a long time, the quick diafiltration of polluted water land is big with the hydraulic load amount of disposing of sewage, can move all the year round, water outlet can reuse etc. characteristics and being used widely, but the simulation diafiltration post that adopts owing to the experimental simulation stage mostly is the starting material once shaped and makes (as utilizing clay pipe, PVC plastics tubing etc.), loaded down with trivial details on manufacture craft (generally needing a large amount of processing) at present; Owing to diafiltration post too high (have more than 1.5m) causes the inconvenience of loading soil sample; And greatly influenced the experimental simulation research work (document 1: Cui Lihua etc. in early stage in Unit Installation and reasons such as dismantling the shortage handiness, the experimental study of municipal effluent artificial soil rapid filtration bed operating mode, agriculture environmental protection 2002,21 (1): 37~40; Document 2: Hao Huofan, the lab simulation of dried wetted perimeter phase research in the polluted water land treatment system, Gansu research and monitoring 2001,14 (2): 72~73).When simulating especially in enormous quantities; required starting material showed increased; and in case after making moulding; purposes is more single, seldom can use in other respects, promptly allows to be applied in other aspects and also is difficult to device is transformed again; cause raw-material significant wastage (document 1: Cui Lihua etc.; the experimental study of municipal effluent artificial soil rapid filtration bed operating mode, agriculture environmental protection 2002,21 (1): 37~40).
Summary of the invention
In order to overcome above-mentioned deficiency, the rapid infiltration land simulator that the purpose of this utility model is to provide a kind of multi-usage, makes things convenient for soil sample to load, save material.
To achieve these goals, the technical solution of the utility model is: mainly be made up of diafiltration post upper end, diafiltration post main body, pipe plug, pipe collar, wherein: described diafiltration post upper end is uncovered structure, sidewall is established diafiltration post feed water inlet, water level positioning port, link to each other with supply flume with amphibious pump respectively by pipeline, the bottom of diafiltration post upper end is connected with diafiltration post main body one end that has the side thief hole by pipe collar, the built-in grid of pipe plug, link together by the pipe collar and the diafiltration post main body the other end, set thief hole in the pipe collar lower end; Be equipped with valve on the thief hole down described; Described diafiltration post main body quantity is at least one joint, interconnects by pipe collar; On diafiltration post main body, establish a side thief hole at least; On described grid, place gravel, soil pattern successively.
The utlity model has following advantage:
1. installation easy to operate, easy.The utility model mainly is to utilize existing section bar and accessory, the employing separation member assembles, only need to get final product according to the synoptic diagram installation, need not special expertise, can determine the height of diafiltration post according to the experiment demand, random lengthening or shorten diafiltration post main body, very convenient soil sample add dress, and be easy to dismounting, operate also very convenient.
2. multi-usage is practical.The utility model is except that simulating as quick diafiltration, can also be used as simulation experiment study such as material element vertical migration in slow rate, subsurface infiltration and the soil, and be applicable to the simulation experiment study that experimental factor and level are more, can analyze different soil to water purification effect and various physics, chemical property from sidewall thief hole and following thief hole water sampling, use flexible.
3. save human and material resources, financial resources.The utility model can unattended continuous operation, saves manpower; Need not to do in addition when lengthening or shortening diafiltration post main body, save starting material and reduce production costs.
4. the starting material wide material sources need not to have made to order, and manufacture craft is simple.Main accessory of the present utility model as: diafiltration post upper end, diafiltration post main body, pipe collar, pipe plug etc. are to utilize existing P VC section bar and accessory etc., only need to bore several thief holes and get final product.
Description of drawings
Fig. 1 is example structure synoptic diagram of the utility model.
Fig. 2 is another example structure synoptic diagram of the utility model.
Embodiment
Embodiment 1
1. structure: as shown in Figure 1, comprise diafiltration post upper end 1, diafiltration post main body 2, pipe plug 3, pipe collar 6, wherein: described diafiltration post upper end 1 is uncovered structure, sidewall is established diafiltration post feed water inlet 4, water level positioning port 5, adopt amphibious pump 11 to be connected with 1 feed water inlet 4, diafiltration post upper end by the water outlet of PVC hose line with supply flume, the water level positioning port 5 of diafiltration post upper end 1 links to each other with the water-in of supply flume; The bottom of diafiltration post upper end 1 is connected with a joint diafiltration post main body 2 one ends by pipe collar 6, and diafiltration post main body 2 is provided with 2 side thief holes 7; Pipe plug 3 built-in grids 8 link together by the pipe collar 6 and diafiltration post main body 2 the other ends, set thief hole 10 in its lower end; Be equipped with valve 9 on the thief hole 10 down; On described grid 8, place gravel, add soil sample on the gravel again; By the water supply and the water stopping time of the time relay 12 control water pumps 11, reach the purpose of waterflooding of diafiltration post and mummification.
2. main raw material(s)
Commercially available pvc pipe material and accessory thereof, the time relay, small-sized amphibious water pump etc.
3. make and installation method
Diafiltration post upper end 1 makes: get 50cm pvc pipe material and bore two holes (diameter 2cm) on its sidewall, be that unit length intercepts two sections of the upper hoses that diameter is 2cm (external diameter) with 3cm, with the PVC special adhesive it is bonded in the drill hole of diafiltration post upper end 1, one as feed water inlet 4 and one as water level positioning port 5.
Diafiltration post main body 2 is made: get 70cm pvc pipe material (length and internal diameter are determined in experimental requirement), experimental requirement is holed at a certain distance on its sidewall, and (present embodiment is holed 2, phase spacing 30cm, diameter 2cm, be 35cm with water level positioning port 5 distances wherein) by top side thief hole 7, present embodiment is that unit length intercepts the upper hose number section that diameter is 2cm (external diameter) with 3cm, with the PVC special adhesive it is bonded in drill hole, make side thief hole 7, seal the mouth of pipe with soft rubber ball; Diafiltration post main body 2 can be a joint or a more piece, and present embodiment is a joint.
Diafiltration post lower end makes: in hole of following drill with ferrule (diameter 2cm) of pipe plug 3, be that unit length intercepts one section of the upper hose that diameter is 2cm (external diameter) with 3cm, with the PVC special adhesive it is bonded in drill hole,, is being equipped with valve 9 on the thief hole 10 down as following thief hole 10.
Install: pipe plug 3 is connected with pipe collar 6, place grid 8 thereon, it places gravel on grid 8, add soil sample on the gravel again, and then by pipe collar 6 successively with diafiltration post main body 2, diafiltration post upper end 1 links to each other, by the PVC plastic hose with amphibious pump 11 and diafiltration post feed water inlet 4, the water outlet of supply flume is connected, the water level positioning port 5 of diafiltration post upper end 1 links to each other with the water-in 4 of supply flume, again by being installed in water supply and the water stopping time that the time relay 12 on the water pump 11 and control valve are controlled water pump 11 respectively, to reach the purpose of control diafiltration post waterflooding and mummification.
The embodiment test data
Soil pattern black earth: quartz sand Soil sample loading height (cm) Raw waste water CODcr (mg/L) Following thief hole water outlet CODcr (mg/L) Rate of percolation (cm/h) 60cm side thief hole water outlet CODcr (mg/L)
Embodiment 1 9∶11 100 177.0 42.4 10.6 73.8
Embodiment 2
Be with the embodiment difference: as shown in Figure 2, described diafiltration post main body 2 quantity are 2 joints, interconnect by pipe collar 6.
Make and install:
(1) gets three sections of the pvc pipe materials of 40cm, wherein on as the sidewall of two pvc pipes of diafiltration post main body 6 every 20cm boring (diameter 2cm), be that unit length intercepts the upper hose number section that diameter is 2cm (external diameter) with 3cm, with the PVC special adhesive it is bonded in drill hole, make side thief hole 7, with the soft rubber ball shutoff mouth of pipe; As an end distance of the 3rd pipe of diafiltration post upper end 1 from first side thief hole 7 upwards 25cm bore a hole, upwards 5cm bores a hole (as feed water inlet 4 and water level positioning port 5) again; Be that unit length intercepts the upper hose number section that diameter is 2cm (external diameter) with 3cm, it be bonded in drill hole with the PVC special adhesive;
(2) with pipe collar 6 pipe plug 3 (leaving down thief hole 10 is controlled by straight mouth pipe valve) is connected, place grid 8 thereon, place gravel on it, add the experiment soil sample on it again.With the PVC flexible pipe water pump 11 is connected with 1 feed water inlet 4, diafiltration post upper end with the water outlet of supply flume, the water level positioning port 5 of diafiltration post upper end 1 then links to each other with the water-in of supply flume again.
The embodiment test data
Soil pattern black earth: quartz sand Soil sample loading height (cm) Raw waste water CODcr (mg/L) Following thief hole water outlet CODcr (mg/L) Rate of percolation (cm/h) 60cm side thief hole water outlet CODcr (mg/L)
Embodiment 2 9∶11 100 177.0 43.2 10.9 73.0

Claims (4)

1. rapid infiltration land simulator, it is characterized in that: mainly by diafiltration post upper end (1), diafiltration post main body (2), pipe plug (3), pipe collar (6) is formed, wherein: described diafiltration post upper end (1) is uncovered structure, sidewall is established diafiltration post feed water inlet (4), water level positioning port (5), link to each other with supply flume with amphibious pump (11) respectively by pipeline, the bottom of diafiltration post upper end (1) is connected with diafiltration post main body (2) one ends that have side thief hole (7) by pipe collar (6), the built-in grid of pipe plug (3) (8), link together by the pipe collar (6) and diafiltration post main body (2) the other end, set thief hole (10) in pipe collar (6) lower end.
2. according to the described rapid infiltration land simulator of claim 1, it is characterized in that: be equipped with valve (9) on the thief hole (10) down described.
3. according to the described rapid infiltration land simulator of claim 1, it is characterized in that: described diafiltration post main body (2) quantity is at least one joint, interconnects by pipe collar (6); On diafiltration post main body (2), establish a side thief hole (7) at least.
4. according to the described rapid infiltration land simulator of claim 1, it is characterized in that: on described grid (8), place gravel, soil pattern successively.
CN 03211215 2003-01-28 2003-01-28 Soil quick percolation analogue device Expired - Fee Related CN2595792Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03211215 CN2595792Y (en) 2003-01-28 2003-01-28 Soil quick percolation analogue device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03211215 CN2595792Y (en) 2003-01-28 2003-01-28 Soil quick percolation analogue device

Publications (1)

Publication Number Publication Date
CN2595792Y true CN2595792Y (en) 2003-12-31

Family

ID=33754298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03211215 Expired - Fee Related CN2595792Y (en) 2003-01-28 2003-01-28 Soil quick percolation analogue device

Country Status (1)

Country Link
CN (1) CN2595792Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063829A (en) * 2010-12-08 2011-05-18 沈阳大学 Experimental device for collecting solid waste filtrate
CN102071967A (en) * 2011-01-26 2011-05-25 中国科学院武汉岩土力学研究所 Filling simulator for salt rock cavern
CN102590362A (en) * 2012-02-23 2012-07-18 北京师范大学 Columnar infiltration device and method for simulating in-situ migration and transfer of pollutants
CN102976557A (en) * 2012-12-05 2013-03-20 华东师范大学 Underground percolation and purification simulating device of urban natural type bank belt rainfall radial flow
CN106706495A (en) * 2016-12-28 2017-05-24 中国科学院武汉岩土力学研究所 Assembled saline soil-containing percolation test system and method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063829A (en) * 2010-12-08 2011-05-18 沈阳大学 Experimental device for collecting solid waste filtrate
CN102063829B (en) * 2010-12-08 2012-02-22 沈阳大学 Experimental device for collecting solid waste filtrate
CN102071967A (en) * 2011-01-26 2011-05-25 中国科学院武汉岩土力学研究所 Filling simulator for salt rock cavern
CN102071967B (en) * 2011-01-26 2013-06-05 中国科学院武汉岩土力学研究所 Filling simulator for salt rock cavern
CN102590362A (en) * 2012-02-23 2012-07-18 北京师范大学 Columnar infiltration device and method for simulating in-situ migration and transfer of pollutants
CN102590362B (en) * 2012-02-23 2014-01-15 北京师范大学 Columnar infiltration device and method for simulating in-situ migration and transfer of pollutants
CN102976557A (en) * 2012-12-05 2013-03-20 华东师范大学 Underground percolation and purification simulating device of urban natural type bank belt rainfall radial flow
CN102976557B (en) * 2012-12-05 2014-06-25 华东师范大学 Underground percolation and purification simulating device of urban natural type bank belt rainfall radial flow
CN106706495A (en) * 2016-12-28 2017-05-24 中国科学院武汉岩土力学研究所 Assembled saline soil-containing percolation test system and method thereof

Similar Documents

Publication Publication Date Title
CN105298490B (en) Underground fluid Stratified Sampling apparatus and method based on U-tube technology
CN103630659B (en) Simulation test device and simulation test method for in-situ chemical and biological remediation of underground water
CN111646577A (en) Circulating well system for treating VOCs and DNAPLs in polluted underground water
CN112570437A (en) System and method for restoring organic polluted site by in-situ heat conduction coupling electroosmosis well point dewatering
CN2595792Y (en) Soil quick percolation analogue device
CN206772764U (en) A kind of multifunctional soil column device of analog study area source pollutants migration
CN104597218B (en) Groundwater dynamic simulation experiment platform
CN106988295A (en) The processing method and its processing equipment of sludge dewatering and solidification are carried out using ground treatments
CN104596737B (en) A kind of DYNAMIC MODELING OF GROUNDWATER experimental method based on groundwater dynamic simulation experiment platform
CN105541069A (en) Three-cavity septic tank
CN2828027Y (en) Underflow artificial wet land simulator
CN201681072U (en) City stagnant riverway sediment pollution releasing and inhibition research device
CN106781962A (en) A kind of heterogeneous isotropic aquifer seepage action of ground water rule simulation test device
CN210995782U (en) Contaminated site soil-groundwater integral type simulation prosthetic devices
CN205954648U (en) Light well point precipitation device
CN107700461B (en) Saline-alkali soil improvement system
CN211777390U (en) Simulation experiment device is invaded to irregular air water boundary individual well water
CN104569322B (en) A kind of construction method of groundwater dynamic simulation experiment platform
CN201400679Y (en) Prestressed steel cylinder concrete marsh gas generation tank
CN104631599B (en) A kind of urgent flood discharge of rain flood
CN208039405U (en) One kind being based on rain sewage diversion town road initial rainwater collection device
CN106630430A (en) Groundwater pollution circulating purification system under effects of key sponge-city modules
CN1920183A (en) Pile bottom mud jacking method for pump-grouting concrete and structure of madjack pipe
CN215886529U (en) Modular assembly type variable flow direction undercurrent artificial wetland
CN106277108A (en) A kind of multistage standard device in situ repairing heavy metal pollution in subsoil water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee