CN2563310Y - High power anchorage cable - Google Patents

High power anchorage cable Download PDF

Info

Publication number
CN2563310Y
CN2563310Y CN 02247913 CN02247913U CN2563310Y CN 2563310 Y CN2563310 Y CN 2563310Y CN 02247913 CN02247913 CN 02247913 CN 02247913 U CN02247913 U CN 02247913U CN 2563310 Y CN2563310 Y CN 2563310Y
Authority
CN
China
Prior art keywords
steel
steel strand
anchor cable
utility
clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02247913
Other languages
Chinese (zh)
Inventor
邢树国
郭东升
王士强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAILUAN (GROUP) CO Ltd
Original Assignee
KAILUAN (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAILUAN (GROUP) CO Ltd filed Critical KAILUAN (GROUP) CO Ltd
Priority to CN 02247913 priority Critical patent/CN2563310Y/en
Application granted granted Critical
Publication of CN2563310Y publication Critical patent/CN2563310Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a high anchor-hold anchor cable, comprising a steel strand, a clamp sheathed with the steel strand and an anchorage section, wherein the steel strand is made of steel wires; a steel wire in the middle of the anchorage section is orderly sleeved by hexagon nuts, two hexagon nuts are combined into one body with the support of a steel pipe; the other steel wires are orderly abutted with each angle of the nuts, which makes the anchorage section form a jujube-stone shaped structural body. Compared with the prior clamp type anchor cable, the utility model enlarges the diameter of the steel strand, thereby making the steel strand capable of completely and evenly stirring up the resin anchoring agent to the utmost, providing the reliable anchoring force, furthermore enhancing the production efficiency and realizes the safe production, hence an ideal high anchor-hold anchor cable for supporting coal mine roadways.

Description

The strong anchoring force anchor cable
Technical field
The utility model relates to a kind of anchor cable, particularly a kind of colliery tunnel support strong anchoring force anchor cable.
Background technology
At present, the anchor cable that use in the colliery mostly is ф 15.24mm steel strand greatly, resin-bonded anchoring, and its structure is a clamping hoop type.The anchor cable of this structure, its shortcoming is: resin anchoring agent is stirred inhomogeneous insufficient, thereby easily cause anchored force not reach designing requirement, cause anchor cable to lose efficacy, bring hidden danger to safety in production.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art and a kind of full and uniform stirring that can guarantee effectively resin anchoring agent is provided, the structural drag that increases anchored end reduces the stretch-draw stand-by period, accelerate the anchor cable installation rate, the strong anchoring force anchor cable of reliable anchored force is provided.
The purpose of this utility model is achieved in that and comprises the clip that is sleeved on the steel strand, steel strand, anchoring section, wherein steel strand are made up of steel wire, its structural feature is that according to being with hex nut, two nuts support to one by steel pipe on a steel wire in the middle of the anchoring section, remaining steel wire apical grafting according to the order of sequence makes anchoring section constitute jujube nutty structure body on each angle of nut.
Compare with existing clamping hoop type anchor cable, the utility model has increased the steel strand diameter, makes it provide reliable anchored force to greatest extent with the full and uniform stirring of resin anchoring agent.The variation of anchoring section structure can provide good structural drag.The fat edges structure of clip also can play an important role to the stirring of resin anchoring agent simultaneously, and the combination of several structures can greatly improve anchored force, and then enhances productivity, and realizes safety in production.
The explanation of accompanying drawing drawing
Accompanying drawing is the utility model structural representation.
The specific embodiment
Below in conjunction with drawings and Examples in detail the utility model is described in detail.
The utility model is by clip 5, anchor cable section 6 compositions such as grade.Clip 5 be two ends all with the clip of fat edges 4, according to designing requirement a plurality of being sleeved on the steel strand can be set.Steel strand are made up of seven steel wires, wherein on a steel wire in the middle of the anchoring section, be with hex nut 1 successively, two hex nuts 1 support to one by steel pipe 2, remaining six roots of sensation steel wire according to the order of sequence apical grafting on each angle of nut 1, just head on steel wire respectively on six of nut 1 angles, anchoring section 6 is strutted formation jujube nutty structure as accompanying drawing.Make gauge of wire by original ф 15.24mm, become ф 21mm.
Clip 5 of the present utility model forms twice fat edges 4 through the mould compacting in the steel strand that are locked, make the diameter of clip 5 also reach 21mm, so just can carry out stirring to resin anchoring agent effectively full and uniformly, and then reach goal of the invention.
Preparation method of the present utility model is; Earlier some circular clips 5 are inserted in steel strand, then steel strand anchoring section 6 is taken apart, therebetween on straight line steel wire, be inserted in nut 1, steel pipe 2, nut 1 successively, nut 1 and steel pipe 2 play the effect of spreading steel strand and steel wire jointly, then the steel strand of taking apart are compiled back original state, have so just formed a jujube nutty structure body, the clip that will in advance be inserted in is suppressed on mould at last, suppresses fat edges 4.

Claims (2)

1, a kind of strong anchoring force anchor cable, comprise the clip that is sleeved on the steel strand, steel strand, anchoring section, wherein steel strand are made up of steel wire, it is characterized in that, on a steel wire in the middle of the anchoring section, comply with and be with hex nut, two nuts support to one by steel pipe, and remaining steel wire apical grafting according to the order of sequence makes anchoring section constitute jujube nutty structure body on each angle of nut.
2, strong anchoring force anchor cable according to claim 1 is characterized in that clip is provided with a plurality of, and the two ends of each clip all have fat edges.
CN 02247913 2002-08-09 2002-08-09 High power anchorage cable Expired - Fee Related CN2563310Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02247913 CN2563310Y (en) 2002-08-09 2002-08-09 High power anchorage cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02247913 CN2563310Y (en) 2002-08-09 2002-08-09 High power anchorage cable

Publications (1)

Publication Number Publication Date
CN2563310Y true CN2563310Y (en) 2003-07-30

Family

ID=33718663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02247913 Expired - Fee Related CN2563310Y (en) 2002-08-09 2002-08-09 High power anchorage cable

Country Status (1)

Country Link
CN (1) CN2563310Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881175A (en) * 2010-06-04 2010-11-10 新汶矿业集团物资供销有限责任公司 Anchor cable for cage-shaped mine and preparation method thereof
CN103114865A (en) * 2013-03-08 2013-05-22 安徽省煤炭科学研究院 Vane-type stirring anchor cable
CN103670467A (en) * 2013-10-29 2014-03-26 淮南矿业(集团)有限责任公司 Grouting anchor cable
CN105971646A (en) * 2016-07-02 2016-09-28 安徽碧源环保工程有限公司 Novel mining anchor cable

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881175A (en) * 2010-06-04 2010-11-10 新汶矿业集团物资供销有限责任公司 Anchor cable for cage-shaped mine and preparation method thereof
CN103114865A (en) * 2013-03-08 2013-05-22 安徽省煤炭科学研究院 Vane-type stirring anchor cable
CN103670467A (en) * 2013-10-29 2014-03-26 淮南矿业(集团)有限责任公司 Grouting anchor cable
CN103670467B (en) * 2013-10-29 2015-12-30 淮南矿业(集团)有限责任公司 Grouting cable anchor
CN105971646A (en) * 2016-07-02 2016-09-28 安徽碧源环保工程有限公司 Novel mining anchor cable

Similar Documents

Publication Publication Date Title
CN202674167U (en) Steel wire rope tensioning device
CN205123185U (en) Non -maintaining insulator wire fixation clamp
CN2563310Y (en) High power anchorage cable
CN207018016U (en) A kind of new shear anchor arm
CN103244607A (en) Steel wire rope tensioning device
CN200952401Y (en) Mine anchor
CN202000653U (en) Steel pipe scaffold lack catch
CN201835846U (en) Nest type anchor cable
CN207597721U (en) A kind of prestress steel twist wire-connecting device
CN202430904U (en) Clamping piece for anchorage device
CN205029257U (en) Cable stainless steel ribbon
CN2801874Y (en) Antitwisting torpedo clamp for mounting suspension wire bridge construction rope
CN2448927Y (en) Steel stranded wire anchor rod
CN2734811Y (en) Steel rope for contact system
CN201206248Y (en) Single stretching rear clip type jack parts
CN204640498U (en) The beam prefabricated steel twisted line protective sleeve of a kind of novel railway T
CN2572005Y (en) Support frame for anchor end of anchorage cable
CN200971586Y (en) Expansion cone anchoring tool
CN2414194Y (en) Flexible anchoring-bolt for roadway support
CN2541605Y (en) Wedge anchor arm
CN206409260U (en) A kind of new mine product anchor cable
CN2658263Y (en) Steel strand whole bundle extrusion anchoring device
CN2742076Y (en) Triangle line pulling tower for communication
CN220927514U (en) Suspension bridge anchorage arc cable strand anchoring system
CN209921208U (en) Sealing strip assembly of automobile rear spoiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee