CN2529914Y - Broken pile treating appts. for building bridge engineering - Google Patents

Broken pile treating appts. for building bridge engineering Download PDF

Info

Publication number
CN2529914Y
CN2529914Y CN 02211340 CN02211340U CN2529914Y CN 2529914 Y CN2529914 Y CN 2529914Y CN 02211340 CN02211340 CN 02211340 CN 02211340 U CN02211340 U CN 02211340U CN 2529914 Y CN2529914 Y CN 2529914Y
Authority
CN
China
Prior art keywords
conduit
guide pipe
spring
boots
unhook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02211340
Other languages
Chinese (zh)
Inventor
刘迈时
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02211340 priority Critical patent/CN2529914Y/en
Application granted granted Critical
Publication of CN2529914Y publication Critical patent/CN2529914Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A broken pile processing unit for bridgework belongs to the technical field of bridge construction machinery. In order to solve the problems that the current broken pile processing method used in the bridgework requires a lot of labor, takes time and expends large funds, the utility model proposes a dedicated device that the secondary guide pipe broken pile processing method is adopted during bored pile concreting, which comprises a guide pipe, a guide pipe boot seat, a guide pipe boot, a hooking and unhooking device and a tightener; wherein, the guide pipe boot seat is welded at the lower end of the guide pipe, a seal ring sealing is provided between the guide pipe boot and the guide pipe boot seat, the slinger nut of the hooking and unhooking device is arranged on the steel wire of the tightener, the tightening slinger is clamped in the ring groove of the clamper body of the hooking and unhooking device, the lower end of the tightening slinger is welded at the bottom of the guide pipe boot, the tightener is used to tighten the guide pipe boot and the guide pipe boot seat, and the tightener is installed at the top of the guide pipe. The utility model has changed the previous method of broken pile treatment in bridgeworks, can be used to process broken piles conveniently, time-savingly and economically, and has the advantages of simple structure, low manufacturing cost and so on.

Description

Bridging engineering broken pile treating apparatus
Affiliated technical field
The utility model belongs to the bridge construction field of mechanical technique.
Background technology
In the pile foundation construction of highway bridge construction engineering, pile foundation generally adopts bored pile, runs into the situation of broken pile in the castinplace pile process unavoidably.Castinplace pile is the basis of bridge, and it directly has influence on the quality of bridge.Be not allow broken pile to exist in the pile foundation construction quality specifications, just must handle in case broken pile takes place.General processing broken pile is exactly reinforcing cage to be hung out the concrete that will pour into again come outbreak out.Handle broken pile like this and often will drop into very big man power and material, and incur loss through delay the duration.Such as the broken pile that took place in certain unit, 1.5 meters in stake footpath, dark 19.5 meters of stake, the processing broken pile was with 5 day time and lose more than 10,000 yuan; Also have two broken piles in addition, 1.8 meters in stake footpath, stake is dark all to be 44 meters, handle these two broken piles and used more than 40 day time, direct losses more than 250,000 yuan.
Summary of the invention
At existing bridging engineering broken pile processing method take a lot of work, time-consuming, need the problem of bigger investment, the utility model that a kind of bridging engineering broken pile treating apparatus that the concrete that reinforcing cage hangs out, will pour into is come outbreak out of need not is provided.The utility model is to adopt the secondary downcomer to handle the special equipment of broken pile method in the drilled pile concrete casting process.Broken pile so is difficult to continue, be because the secondary downcomer will be by the mud and the boring mud beds of precipitation, boring mud can all that has been achieved is spoiled if enter mud and precipitation in the conduit in the downcomer process, loses time, because conduit has advanced mud, the boring mud sediment still can produce broken pile.So secondary downcomer successfully, the sealing that must at first solve conduit can not brought mud and precipitation boring mud into the concrete layer when allowing it by mud layer, and remove this problem of sealing after end of conduit is entered concrete layer certain depth.
The utility model constitutes (electromagnetic shaker is adhered in order to installing in four holes of the last strip of stretcher) by conduit, conduit boots seat, conduit boots body, extension detacher, stretcher.
Conduit boots seat is welded on the conduit lower end, between conduit boots body and the conduit boots seat sealing ring is arranged, and sealing ring sticks with glue in the seal groove of conduit boots seat; Hang detacher and be made of clamping body, clamping pin, unhook spring, spring housing, jump ring, retaining pin, retaining guide, retaining pin spring, anti-sticking top board, anti-sticking spring, eyenut, bolt, stop collar, unhook tongue, unhook tongue pad circle, suspension ring spring etc., the unhook tongue is welded on the unhook tongue pad circle; Stretcher is made of wire rope, reel, support, spool shaft, handle, click.Hanging detacher is connected with buckle with the wire rope of stretcher.The connected mode of stretcher and conduit: be that flange is connected or is threaded between each section of conduit, also connect between stretcher reel base plate and the conduit in identical with it mode.
The eyenut of hanging detacher is contained on the wire rope of stretcher, and bolt passes clamping body centre bore and is connected with eyenut, and the suspension ring spring is housed on bolt successively, stop collar and unhook tongue pad circle, and the unhook tongue is welded on the unhook tongue pad circle.Clamping pin, unhook spring, spring housing and jump ring are equipped with in the bottom of clamping body, be welded with retaining guide, retaining pin, anti-sticking top board and plate washer on the spring housing, have the retaining spring on the retaining pin, and be provided with cottor pin, anti-sticking spring and packing ring are housed, the tensioning suspension ring are stuck in the cannelure of clamper.Tensioning suspension ring lower end is welded in the bottom of conduit boots, in the middle of conduit boots body and the conduit boots seat sealing ring is housed, and strains by stretcher.
The utility model is installed, conduit is kept flat on the ground, stretcher is installed in the conduit upper end, decontrol the wire rope on the reel and hang detacher, through the conduit lower end, the suspension ring of conduit boots are inserted hang the unhook body in the conduit, promote clamping pin, simultaneously the anti-sticking top board is removed to spring housing end compression anti-sticking spring, retaining pin enters unhook spring housing retaining hole, blocks the clamping pin end; With the seal groove on the straight mouthful of platform aligning conduit boots seat of conduit boots upper end, shake stretcher reel handle tensioning wire rope, sealing ring is compacted, the suspension ring spring is subjected to being compressed behind certain pressure simultaneously, conduit boots suspension ring also snap in the groove on the clamping pin, the unhook tongue is stirred retaining pin in rising, the work of anti-sticking top board is blocked ratchet with ratchet behind the stretcher tensioning wire rope.
Use the utility model to handle broken pile, the conduit top of slinging is with in the conduit boots one end fill-in well, and conduit boots surface is a smooth curved surface, during by mud and precipitation boring mud layer, impurity can not brought into the concrete layer, enter concrete layer 2-3 rice after, the conduit upper end is fixed on the reinforcing cage, prevents the conduit come-up.The stretcher ratchet opened unclamp wire rope, clamping pin is return under the effect of unhook spring, hangs detacher and breaks away from suspension ring, wire rope is regained just can be continued pour concrete.The conduit boots lose pulling force and only are subjected to buoyancy, and the concrete in the conduit constantly accumulates rising, when catheter interior pressure surpasses external pressure, separate with conduit boots seat under the pressure of conduit boots concrete in conduit, and the inside and outside concrete of conduit has just combined together.
If the broken pile position is very dark, the conduit of sealing can be subjected to bigger buoyancy, can tie up to conduit upper end with the downward tractive of manpower with coir rope, when manpower is difficult to control, can adopt machinery such as Chain block that the conduit upper end is applied pulling force, and can use simultaneously and adhere to electromagnetic shaker, make conduit reach appointed part smoothly, be fixed on the reinforcing cage and get final product.Resistance maximum when conduit enters the concrete layer can be used electromagnetic shaker when inserting conduit.
Conduit boots seat, conduit boots can be foundry goods, steel construction piece.And the conduit boots can also be made hollow body with materials such as plastics, rubber, nylon and replace steel part to reduce cost, even can form with log turning.The conduit boots that certain nonmetals are made will be regained, and can not stay in the concrete.
The utility model has changed the method for the processing of bridging in the past broken pile, it is the device that the secondary downcomer is handled the broken pile indispensability in the drilled pile concrete casting process, it is very convenient to use the utility model to handle broken pile, can save plenty of time and fund, and the utlity model has simple in structure, advantage of low manufacturing cost.
Description of drawings
Accompanying drawing is the utility model structural representation.
Among the figure: 1 conduit, 2 conduit boots seats, 3 conduit boots, 4 sealing rings, 5 clamping bodies, 6 eyenuts, 7 bolts, 8 suspension ring springs, 9 stop collars, 10 retaining springs, 11 tensioning suspension ring, 12 clamping pins, 13 unhook springs, 14 jump rings, 15 spring housings, 16 cottor pins, 17 anti-sticking springs, 18 packing rings, 19 retaining guidees, 20 anti-sticking top boards, 21 unhook tongues, 22 unhook tongue pad circles, 23 retaining pins, 24 plate washers, 25 attaching nuts, 26 reel base plates, 27 ratchets, 28 ratchets, 29 spool shaft, 30 reels, 31 roller stands, 32 electromagnetic shaker supports, 33 electromagnetic shaker base plates, 34 wire rope.
The specific embodiment
As shown in the figure: the utility model is made of conduit 1, conduit boots seat 2, conduit boots 3 hook devices and stretcher.Conduit boots seat 2 is welded on the lower end of conduit, between conduit boots 3 and the conduit boots seat 2 sealing ring 4 is arranged, and sealing ring 4 sticks with glue in the seal groove of conduit boots seat 2; Hook device is made of clamping body 5, clamping pin 12, unhook spring 13, spring housing 15, jump ring 14, retaining pin 23, retaining guide 19, retaining pin spring 10, anti-sticking top board 20, anti-sticking spring 17, eyenut 6, bolt 7, stop collar 9, unhook tongue 21, unhook tongue pad circle 22, suspension ring spring 8; Stretcher is made of wire rope 34, reel 30, roller stand 31, spool shaft 29, handle, ratchet 28, ratchet 27.Hanging detacher is connected with the wire rope 34 usefulness buckles of stretcher.Adopt flange to connect between each section of conduit, stretcher reel base plate 26 also adopts flange to be connected with conduit 1, the eyenut 6 of hanging detacher is connected with the wire rope 34 usefulness buckles of stretcher, the centre bore that bolt 7 passes clamping body 5 is threaded with eyenut 6, suspension ring spring 8 is housed on bolt 7 successively, stop collar 9 and unhook tongue pad circle 22, unhook tongue 21 is welded on the unhook tongue pad circle 22, clamping pin 12 is equipped with in the bottom of clamper 5, unhook spring 13, spring housing 15 and jump ring 14, be welded with retaining guide 19 on the spring housing 15, retaining pin 23, anti-sticking top board 20 and plate washer 24, have retaining spring 10 on the retaining pin 23 and be provided with cottor pin 16, be equipped with and prevent spring 7 and packing ring 18, tensioning suspension ring 11 are stuck in the cannelure of clamper 5, tensioning suspension ring 11 lower ends are welded in the bottom of conduit boots 3, and conduit boots 3 and conduit boots seat 2 intermediate seals are also strained by stretcher.At the top of conduit 1, electromagnetic shaker support 32 is housed on the reel base plate 26, on the top of electromagnetic shaker support 32 electromagnetic shaker base plate 33 is housed.

Claims (4)

1, a kind of bridging engineering broken pile treating apparatus, it is characterized in that constituting by conduit, conduit boots seat, conduit boots, extension detacher and stretcher, conduit boots seat is welded on the sealing ring sealing between conduit lower end, conduit boots and the conduit boots seat, the eyenut of hanging detacher is contained on the wire rope of stretcher, the tensioning suspension ring are stuck in the cannelure of the clamping body of hanging detacher, the lower end of tensioning suspension ring is welded in the bottom of conduit boots, by the stretcher tension, stretcher is installed in the conduit upper end between conduit boots and the conduit boots seat.
2, bridging engineering broken pile treating apparatus as claimed in claim 1, it is characterized in that said extension detacher is by the clamping body, clamping pin, the unhook spring, spring housing, jump ring, retaining pin, the retaining guide, the retaining pin spring, the anti-sticking top board, the anti-sticking spring, eyenut, bolt, stop collar, the unhook tongue, unhook tongue pad circle, the suspension ring spring constitutes, bolt passes clamping body centre bore and is connected with eyenut, the suspension ring spring is housed on bolt successively, stop collar and unhook tongue pad circle, the unhook tongue is welded on the unhook tongue pad circle, clamping pin is equipped with in the bottom of clamping body, the unhook spring, spring housing and jump ring, be welded with the retaining guide on the spring housing, retaining pin, anti-sticking top board and plate washer have the retaining spring and are provided with cottor pin on the retaining pin, anti-sticking spring and packing ring are housed.
3, bridging engineering broken pile treating apparatus as claimed in claim 1 is characterized in that said stretcher is identical with the connected mode between each section of conduit with the connected mode of conduit.
4, bridging engineering broken pile treating apparatus as claimed in claim 1 is characterized in that its surface of said conduit boots is a smooth curved surface.
CN 02211340 2002-02-19 2002-02-19 Broken pile treating appts. for building bridge engineering Expired - Fee Related CN2529914Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02211340 CN2529914Y (en) 2002-02-19 2002-02-19 Broken pile treating appts. for building bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02211340 CN2529914Y (en) 2002-02-19 2002-02-19 Broken pile treating appts. for building bridge engineering

Publications (1)

Publication Number Publication Date
CN2529914Y true CN2529914Y (en) 2003-01-08

Family

ID=33691268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02211340 Expired - Fee Related CN2529914Y (en) 2002-02-19 2002-02-19 Broken pile treating appts. for building bridge engineering

Country Status (1)

Country Link
CN (1) CN2529914Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220762A (en) * 2011-04-25 2011-10-19 中交隧道工程局有限公司 Method and device for disposing underwater pouring concrete pile breaking accident
CN103195065A (en) * 2013-04-15 2013-07-10 华东交通大学 Screw-on disposable underwater concrete conduit head
CN110004925A (en) * 2019-04-04 2019-07-12 中国葛洲坝集团第一工程有限公司 Breakage of cast-in-place bored pile processing unit and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220762A (en) * 2011-04-25 2011-10-19 中交隧道工程局有限公司 Method and device for disposing underwater pouring concrete pile breaking accident
CN103195065A (en) * 2013-04-15 2013-07-10 华东交通大学 Screw-on disposable underwater concrete conduit head
CN103195065B (en) * 2013-04-15 2015-04-01 华东交通大学 Screw-on disposable underwater concrete conduit head
CN110004925A (en) * 2019-04-04 2019-07-12 中国葛洲坝集团第一工程有限公司 Breakage of cast-in-place bored pile processing unit and construction method

Similar Documents

Publication Publication Date Title
CN100510280C (en) Method for the earthwork of a foundation sunk for a wind energy facility
CN109630128B (en) Prefabricated reinforced concrete assembled dead weight sinking vertical shaft
CN2529914Y (en) Broken pile treating appts. for building bridge engineering
CN203670605U (en) Conveying belt tightening device
CN201362956Y (en) Novel wall connector
CN116556703A (en) Aerated concrete block overturning and carrying device
CN116446267A (en) Prefabricated pier stud connecting assembly
US5775837A (en) Inflatable plugs for installing erosion control blocks
CN111810091A (en) Full-intelligent vertical hydraulic pumping unit and pumping unit control method
JP2009041194A (en) Temporary scaffold for pile
CN116480847A (en) Dynamic pipe cable distributed type float underwater online replacement method
CN101871197B (en) Construction method for plugging air gap between bottom hole of pier steel suspension box and foundation pile
CN213751672U (en) Suspension type signboard is used in parking area
CN2635726Y (en) Cable adjustable low stress clamp piece anchoring system
CN2234477Y (en) High-strength wire tensioning bolt
CN202483155U (en) Cantilever beam anchoring apparatus
CN218440425U (en) Quick-dismantling wedge rope ring
JP2011021318A (en) Method for preventing lift of manhole and water flowing pipe, and underground buried water flowing device therefor
CN216817456U (en) Cable-stayed chain video inspection device
CN218204188U (en) Slope protection equipment
CN2384021Y (en) Adjustable bolt capable of preventing being detached by theft
CN221358688U (en) Reinforcing belt of filter press hopper
CN217378908U (en) Assembly connection structure of steel sheet pile and inner support
CN214143080U (en) Energy-saving safety railway rail turnover device
CA2267969C (en) Method and apparatus for installing pipeline weights

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee