CN2522508Y CN 01247261 CN01247261U CN2522508Y CN 2522508 Y CN2522508 Y CN 2522508Y CN 01247261 CN01247261 CN 01247261 CN 01247261 U CN01247261 U CN 01247261U CN 2522508 Y CN2522508 Y CN 2522508Y
Authority
CN
China
Prior art keywords
parapet
tie beam
collar tie
proof
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01247261
Other languages
Chinese (zh)
Inventor
陈国联
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01247261 priority Critical patent/CN2522508Y/en
Application granted granted Critical
Publication of CN2522508Y publication Critical patent/CN2522508Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a roof platform and parapet wall external and internal permanent water-proof, leakage-proof and ooze-proof innovative structure. A cement mortar layer (11), a waterproof layer (1), a cement mortar protection layer (2), a steel roof (3) and a daughter parapet beam (8) are lapped over a roof slab (10). A roof ring beam (9) is provided with a steel column (6) and drills through the roof slab (10) to be connected with a daughter parapet beam reinforced steel bar (7), a tensile reinforced steel bar (5) and a top-shelved reinforced steel bar (4). The daughter wall and the room structure are integrated together so as to achieve long-term waterproofing effectiveness. The utility model solves the problem of the internal wall and the external wall in terms of water leakage as well as the problem of rubbish due to the maintenance. The utility model requires no maintenance for the whole service life, thus saving a lot of maintenance fund. The utility model lays foundations for the promotion of environmentally-friendly industry projects of roof platforms.

Description

The inside and outside permanent waterproof, seepage control leakproof innovation structure of roofdeck and parapet
The utility model relates to the roof water-proof structure, the inside and outside permanent waterproof, seepage control leakproof innovation structure of particularly a kind of roofdeck and parapet.
The waterproof, seepage control leakproof problem of roofdeck never is well solved in the prior art, and waterproofing materials is aging easily, parapet and roof panel are subjected to natural environment influence, expand with heat and contract with cold, tortoise literary composition crack occurs, cause the inside and outside roof that reaches of parapet to seep water, leak.
Cause that thus the roofdeck waterproof repairment is frequent, maintenance cost is big, and the garbage environment pollution that waterproof repairment produced is rooted out old waterproofing course, lays new waterproofing course, and the radioactivity of waterproofing materials is seriously polluted to air.
Such roofdeck can't be promoted roofdeck environmental protection industry engineering.
The purpose of this utility model is: provide a kind of roofdeck and parapet inside and outside permanent waterproof, seepage control leakproof innovation structure, it has solved the difficult problem of roofdeck waterproof, seepage control leakproof in the long-term puzzlement construction market, need not keep in repair all the life, saved the waterproof repairment fund, solved the rubbish of waterproof repairment generation once more, can promote roofdeck environmental protection industry engineering, reach the purpose of permanent waterproof, seepage control leakproof.
Formation of the present utility model: by the cement mortar screeding layer; waterproofing course; cement mortar protective course; the rigidity roofing; parapet and parapet collar tie beam constitute; on roof panel (10) cement mortar screeding layer (11); go up bonding waterproofing course (1) at cement mortar screeding layer (11); on waterproofing course (1) cement mortar protective course (2); on cement mortar protective course (2) rigidity roofing (3) and parapet collar tie beam (8); parapet collar tie beam (8) be positioned at rigidity roofing (3) around; the structure column reinforcing bar (6) of roof collar tie beam (9); pass roof panel (10) and parapet collar tie beam reinforcing bar (7); parapet tension reinforcement (5) is connected with the pre-reinforcing bar of pressure (4), and parapet and room body structure are fused.
Waterproofing course (1) adopts two sides band nature sand cloth tire flexible waterproof sheet and highly effective matched cementing agent.
4 reinforcing bars (6) in roof collar tie beam (9) the structure column and interior 4 parapet collar tie beam reinforcing bars (7), 4 parapet tension reinforcements (5) and vertical connection of 4 reinforcing bars that bear down on one (4) of parapet collar tie beam (8).
The pre-buried pipe fitting of crossing in parapet collar tie beam (8).
Compared with the prior art, the utility model can reach permanent waterproof effect, has solved the leakage problem of decorating inner and external walls wall and the rubbish that waterproofing materials ageing resistance, the radioactive contaminated air of waterproofing materials and waterproof construction produce.The waterproof repairment fund can be saved in a large number, roofdeck environmental protection industry engineering can be promoted, can heat-insulation and heat-preservation, can produce economic benefit again, save the soil.
Accompanying drawing 1 is the utility model structural representation;
Accompanying drawing 2 is parapet collar tie beam reinforcing bar and parapet column bar construction figure;
Accompanying drawing 3 is parapet collar tie beam reinforcing bar and parapet column reinforcing bar binding figure;
Accompanying drawing 4 is cement mortar screeding layers;
Accompanying drawing 5 is waterproofing courses;
Accompanying drawing 6 is cement mortar protective courses;
Accompanying drawing 7 is the pre-buried pipe fitting structure charts of crossing of parapet collar tie beam;
Accompanying drawing 8 is the pre-buried straight-through pipe fitting of water and sleeve pipes crossed;
Accompanying drawing 9 is pre-buried sluice bend pipes;
Accompanying drawing 10 is parapet tension reinforcement and parapet column reinforcing bar binding figure;
Accompanying drawing 11 is sectional drawings of accompanying drawing 10;
Accompanying drawing 12 is bear down on one reinforcing bar and column reinforcing bar, tension reinforcement binding figure of parapet;
Accompanying drawing 13 is that the waterproof schematic diagram is drawn in the room.
Embodiment of the present utility model: as shown in Figure 1, roof collar tie beam (9) structure column reinforcing bar (6) passes roof panel (10), on roof panel (10) cement mortar screeding layer (11), go up with the highly effective binder waterproofing course (1) that bonds at cement mortar screeding layer (11), waterproofing course (1) adopts two sides band nature sand cloth tire flexible waterproof sheet.On waterproofing course (1), make cement mortar protective course (2); on cement mortar protective course (2), make parapet collar tie beam (8) again; 4 parapet collar tie beam reinforcing bars (7) link with the structure column reinforcing bar (6) of roof collar tie beam (9); to cross pipe fitting imbeds in the parapet collar tie beam; pouring mixes earth then; on parapet collar tie beam (8), make parapet; 4 parapet tension reinforcements (5) are stretched in the parapet constructional column; be connected with structure column reinforcing bar (6); parapet bear down on one reinforcing bar (4) with the structure column reinforcing bar (6) be connected; thus, reinforcing bar connects integrated, and parapet and room body structure are fused.
Be rigidity roofing (3) above the mortar cover (2) of the cement mortar in parapet collar tie beam (8), rigidity roofing (3) sloping layer is made partitioning slot, covers with the highly effective binder filleting.
Shown in accompanying drawing 2, accompanying drawing 3,4 parapet collar tie beam reinforcing bars (7) are connected with 4 structure column reinforcing bars (6), and column stirrup (12) is arranged on column reinforcing bar (6), and collar tie beam stirrup (13) is arranged on parapet collar tie beam reinforcing bar (7).
As shown in Figure 4, be the cement mortar screeding layer, 4 root post reinforcing bars (6) on every constructional column pass cement mortar screeding layer (11).
As shown in Figure 5, be waterproofing course, waterproofing course (1) adopts two sides band nature sand cloth tire flexible waterproof sheet and highly effective matched cementing agent, and 4 root post reinforcing bars (6) on every constructional column pass waterproofing course (1).
As shown in Figure 6, be cement mortar protective course, 4 root post reinforcing bars (6) on every constructional column pass cement mortar protective course (2).
Shown in accompanying drawing 7, accompanying drawing 8, accompanying drawing 9, pre-buried pipe fitting (16) and the sluice bend pipe (17) crossed in parapet collar tie beam (8) has pre-buried pipe fitting mouth (14), (15) crossed on parapet collar tie beam (8).
Shown in accompanying drawing 10, accompanying drawing 11, be parapet tension reinforcement and parapet column reinforcing bar connection layout.Column stirrup (12) is arranged on column reinforcing bar (6).
As shown in Figure 12, be bear down on one reinforcing bar and column reinforcing bar, tension reinforcement binding figure of parapet.
As shown in Figure 13, be the roof waterproof schematic diagram, the centre is rigidity roofing (3), is parapet (18) and constructional column (19) on every side.

Claims (4)

1; the inside and outside permanent waterproof, seepage control leakproof innovation structure of a kind of roofdeck and parapet; by the cement mortar screeding layer; waterproofing course; cement mortar protective course; the rigidity roofing; parapet and parapet collar tie beam constitute; it is characterized in that: be cement mortar screeding layer (11) on roof panel (10); go up bonding waterproofing course (1) at cement mortar screeding layer (11); on waterproofing course (1) cement mortar protective course (2); on cement mortar protective course (2) rigidity roofing (3) and parapet collar tie beam (8); parapet collar tie beam (8) be positioned at rigidity roofing (3) around; the structure column reinforcing bar (6) of roof collar tie beam (9); pass roof panel (10) and parapet collar tie beam reinforcing bar (7); parapet tension reinforcement (5) is connected with the reinforcing bar that bears down on one (4), and parapet and room body structure are fused.
2, the inside and outside permanent waterproof, seepage control leakproof innovation structure of roofdeck according to claim 1 and parapet, it is characterized in that: waterproofing course (1) adopts two sides band nature sand cloth tire flexible waterproof sheet and highly effective matched cementing agent.
3, the inside and outside waterproof, seepage control leakproof for a long time of roofdeck according to claim 1 and parapet innovation structure is characterized in that: 4 reinforcing bars (6) in roof collar tie beam (9) the structure column and interior 4 parapet collar tie beam reinforcing bars (7), 4 parapet tension reinforcements (5) and vertical connection of 4 reinforcing bars that bear down on one (4) of parapet collar tie beam (8).
4, the inside and outside permanent waterproof, seepage control leakproof innovation structure of roofdeck according to claim 1 and parapet is characterized in that: the pre-buried pipe fitting of crossing in parapet collar tie beam (8).
CN 01247261 2001-08-10 2001-08-10 Roof platform and parapet wall external and internal permanent water-proof, leakage-proof and ooze-proof innovative structure Expired - Fee Related CN2522508Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01247261 CN2522508Y (en) 2001-08-10 2001-08-10 Roof platform and parapet wall external and internal permanent water-proof, leakage-proof and ooze-proof innovative structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01247261 CN2522508Y (en) 2001-08-10 2001-08-10 Roof platform and parapet wall external and internal permanent water-proof, leakage-proof and ooze-proof innovative structure

Publications (1)

Publication Number Publication Date
CN2522508Y true CN2522508Y (en) 2002-11-27

Family

ID=33658149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01247261 Expired - Fee Related CN2522508Y (en) 2001-08-10 2001-08-10 Roof platform and parapet wall external and internal permanent water-proof, leakage-proof and ooze-proof innovative structure

Country Status (1)

Country Link
CN (1) CN2522508Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121297A (en) * 2011-01-13 2011-07-13 江苏省江建集团有限公司 Roof periphery waterproofing system
CN103266723A (en) * 2013-05-27 2013-08-28 天津住宅集团建设工程总承包有限公司 Fireproof heat preserving parapet construction structure
CN104074318A (en) * 2014-07-03 2014-10-01 天津住宅集团建设工程总承包有限公司 Prefabricated plate parapet roof construction method
CN106703306A (en) * 2017-01-19 2017-05-24 香港华艺设计顾问(深圳)有限公司 Precast concrete parapet wall component and connecting structure thereof
CN107254964A (en) * 2017-07-21 2017-10-17 马明才 Waterproof beam structure of steel die above flat-top

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121297A (en) * 2011-01-13 2011-07-13 江苏省江建集团有限公司 Roof periphery waterproofing system
CN102121297B (en) * 2011-01-13 2012-05-09 江苏省江建集团有限公司 Roof periphery waterproofing system
CN103266723A (en) * 2013-05-27 2013-08-28 天津住宅集团建设工程总承包有限公司 Fireproof heat preserving parapet construction structure
CN104074318A (en) * 2014-07-03 2014-10-01 天津住宅集团建设工程总承包有限公司 Prefabricated plate parapet roof construction method
CN106703306A (en) * 2017-01-19 2017-05-24 香港华艺设计顾问(深圳)有限公司 Precast concrete parapet wall component and connecting structure thereof
CN107254964A (en) * 2017-07-21 2017-10-17 马明才 Waterproof beam structure of steel die above flat-top
CN107254964B (en) * 2017-07-21 2019-09-20 马明才 Waterproof beam structure of steel die above flat-top

Similar Documents

Publication Publication Date Title
CN100513717C (en) Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN201972252U (en) External water stopper structure
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN206545228U (en) A kind of piping lane with waterproof construction
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN206189455U (en) Piping lane
CN112411901B (en) Waterproof and heat-insulating construction process for roof deformation joint
CN2522508Y (en) Roof platform and parapet wall external and internal permanent water-proof, leakage-proof and ooze-proof innovative structure
CN102912945A (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN112127390A (en) Construction process for simply plugging outer wall reserved sleeve in underground structural area
CN108560585B (en) Basement outer wall full assembly structure and construction method thereof
CN217679289U (en) Underground structure induced seam system
CN204238264U (en) A kind of sole plate post-poured strip structure
CN106088758A (en) A kind of double-deck assembled underground granary
CN113512932B (en) Prestressed steel beam connected prefabricated small box girder type hidden cover beam and construction method thereof
CN205975951U (en) Side fascia installation node
CN205314601U (en) A scalable instrument for protection of tower crane entrance to a cave
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN204590336U (en) A kind of overlapped shear wall based on half prefabricated ultra-tough steel concrete
CN1900438A (en) Construction body for repairing underground building cracks and its method
CN1186509C (en) Post-stretching prestressed concrete arch bar roof and its construction method
CN107460955A (en) A kind of large-span prestressed prefabricated industrial plant building
CN106193685A (en) Prefabricated assembled communications equipment room structure
CN108071197A (en) Roofing ultrastrong water-proof structure and construction method
CN207160064U (en) Template system of open cut tunnel arc roof water proof coating

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee