CN2472029Y - Plastic composite pipe with steel net sheath - Google Patents

Plastic composite pipe with steel net sheath Download PDF

Info

Publication number
CN2472029Y
CN2472029Y CN 00242227 CN00242227U CN2472029Y CN 2472029 Y CN2472029 Y CN 2472029Y CN 00242227 CN00242227 CN 00242227 CN 00242227 U CN00242227 U CN 00242227U CN 2472029 Y CN2472029 Y CN 2472029Y
Authority
CN
China
Prior art keywords
steel band
steel belt
plastic
steel
composite pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00242227
Other languages
Chinese (zh)
Inventor
侯贤忠
侯欣田
侯冰冰
侯可欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00242227 priority Critical patent/CN2472029Y/en
Application granted granted Critical
Publication of CN2472029Y publication Critical patent/CN2472029Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a plastic composite tube with steel belt net framework, which belongs to a plastic composite tube. The utility model comprises an inner wall of the plastic tube 2, an outer wall of the plastic tube 3 and a steel belt net framework 1; a steel belt 4 is helically rotated into tube shape and the two ends of the steel belt 4 are welded with a connecting ring 6; a steel belt 5 is arranged at the outside of the steel belt 4 and the intersections are fixed in welding style; the two ends of the steel belt 5 are welded with the connecting ring 6, so as to form the steel belt net framework 1; the steel belt net framework 1 is covered by the inner wall of the plastic tube 2 inside and the outer wall of the plastic tube 3 outside. The utility model has the advantages of decreasing wall thickness of the composite tube, saving steel and raw materials and reducing cost by ten to twenty percents.

Description

Steel band network framework plastic composite pipe
The utility model relates to the application of reinforcing material in the plastic composite pipe pipe, relates in particular to steel band network framework plastic composite pipe, belongs to a kind of in the plastic composite pipe of nonmetal pipeline technology----.
In nonmetal pipeline, plastic tube is because the restriction of its material, make the resistance to compression of plastic tube, counter-bending, performances such as stretch-proof have certain narrow limitation, for improving the intensity of plastic tube, the technological method that adopts is to add reinforcing mesh skeleton and steel plate hole network framework in plastic tube at present, number of patent application is respectively 94209612, name is called that metal frame--plastic composite pipe and application number are 94239887, name is called the high duty metal frame plastic composite pipe, the former is embedded with netted tubular Framework Of Steel Reinforcement in the middle of the plastic tube tube wall, as everyone knows, two reinforcing bar zigzag welds are connected together, and the thickness of its weld is 2 times bar diameter, for the reinforcing bar tube net with this thickness is rolled in the plastic tube wall, certainly will increase the pipe thickness of plastic composite pipe, wasted raw material, and the high duty metal frame plastic composite pipe is to go out on steel plate one by one that Kong Houzai is rolled into tubulose, this has not only wasted steel, also make manufacturing process loaded down with trivial details, cause the increase of product cost.
The purpose of this utility model provides a kind of steel band network framework plastic composite pipe, reduces the pipe thickness of plastic composite pipe, saves steel, reduces product cost.
The technical solution of the utility model is: the steel band network framework is welded by two layers of steel band are staggered, the first layer steel band is center convolution coiled tubulose with the axis, pitch is greater than width of steel band, be welded on the outside of helical steel band with several axial steel bands of parallel axes, axially steel band and helical steel band intersection are connected and fixed with welding method, thereby form the steel band network framework, utilize the plastic pipe moulding process that the steel band network framework is freezed solidly in the plastic tube wall, constitute steel band network framework plastic composite pipe.
Described steel band network framework also can be welded so that opposite sense of rotation is crossing by the central axis of two steel bands around pipeline.
The utility model has the advantages that: (1) can reduce the wall thickness of composite pipe.(2) avoid the steel waste, save raw material, reduce the cost of plastic composite pipe, can fall cost 10-20%.(3) steel band network framework processing and fabricating is realized easily, reduces processing cost.(4) helical steel band bears the suffered radial pressure of plastic composite pipe, the axial tension that axial steel band bears plastic composite pipe.
Above-mentioned advantage can be by calculating proof.For example: external diameter is the reinforcing mesh frame plastic composite pipe of 50mm, and reinforcing bar is φ 4mm, and plastic protective layer is thick to be 2mm, and then the plastic composite pipe wall thickness is 12mm, that is:
4 * 2+2 * 2=12mm, the steel band that is converted into the reinforcing bar homalographic then should be wide * thick=6.28mm * 2mm, this moment, the wall thickness of plastic composite pipe should be 2 * 2+2 * 2=8mm, made the wall thickness of plastic composite pipe reduce 4mm, and this saves the economic benefit that produces is considerable.
Fig. 1 is a steel band network framework composite plastic pipe structural drawing.
Fig. 2 is a steel band network framework structural drawing.
Fig. 3 is the longitudinal section of plastic composite pipe shown in Figure 1
Fig. 4 is the B-B sectional view of steel band skeleton shown in Figure 2
Below in conjunction with Fig. 1, Fig. 2 the utility model is described in detail.
Referring to Fig. 2, the steel band network framework is made up of the tubulose short circuit ring 6 at two ends and the steel band of two layers of staggered welding, first layer steel band 4 is center convolution rotation coiled tubulose with the axis, pitch is greater than width of steel band 1-10mm, the two ends of steel band 4 are welded on respectively on two tubulose short circuit rings 6, distribute vertically with several steel bands 5 of parallel to an axis, steel band 5 is connected and fixed with welding manner with helical steel band 4 jointing places, the two ends of steel band 5 are welded on two tubulose short circuit rings 6, steel band 5 is the interval certain spacing each other, thereby constitutes the steel band network framework 1 that has mesh with steel band 4; Referring to Fig. 1, place steel band network framework 1 in the plastic composite pipe shaping machine set and make steel band network framework 1 be in the tube wall neutral position, utilize the plastic pipe moulding process, make by plastic tube inwall 2, outer wall 3 steel band network framework 1 parcel binding all-in-one-piece steel band network framework plastic composite pipe.

Claims (1)

1, steel band network framework plastic composite pipe, by plastic tube inwall (2), plastic tube outer wall (3), steel band network framework (1) constitutes, it is characterized in that: steel band (4) is center convolution rotation coiled tubulose with the axis, pitch is greater than width of steel band, the two ends of steel band (4) are welded on respectively on two tubulose short circuit rings (6), be distributed in the outside of steel band (4) with several steel bands (5) of parallel to an axis, steel band (5) links fixing with steel band (4) jointing place with welding manner, the two ends of steel band (5) are welded on the short circuit ring (6) at two ends, steel band (5) each interval certain spacing, thus constitute steel band network framework (1); Plastic tube inwall (2), outer wall (3) are with the interior outer wrapping of steel band network framework (1).
CN 00242227 2000-07-06 2000-07-06 Plastic composite pipe with steel net sheath Expired - Fee Related CN2472029Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00242227 CN2472029Y (en) 2000-07-06 2000-07-06 Plastic composite pipe with steel net sheath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00242227 CN2472029Y (en) 2000-07-06 2000-07-06 Plastic composite pipe with steel net sheath

Publications (1)

Publication Number Publication Date
CN2472029Y true CN2472029Y (en) 2002-01-16

Family

ID=33602439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00242227 Expired - Fee Related CN2472029Y (en) 2000-07-06 2000-07-06 Plastic composite pipe with steel net sheath

Country Status (1)

Country Link
CN (1) CN2472029Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345768A (en) * 2011-10-25 2012-02-08 浙江双林机电科技有限公司 PE water supply pipe and connecting structure thereof
CN102748542A (en) * 2012-07-13 2012-10-24 新兴铸管股份有限公司 Steel-plastic composite protective sleeve
CN103195989A (en) * 2013-04-08 2013-07-10 上海天力实业(集团)有限公司 Plastic composite tube with metal pressure bearing layer clamped inside and machining method thereof
CN103883797A (en) * 2014-03-26 2014-06-25 乌海市公路工程有限公司 Construction method of steel wire mesh framework plastic composite pipe
CN112963632A (en) * 2021-03-11 2021-06-15 四川泰鑫实业发展有限责任公司 Flexible composite pipe and production method and production device thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345768A (en) * 2011-10-25 2012-02-08 浙江双林机电科技有限公司 PE water supply pipe and connecting structure thereof
CN102748542A (en) * 2012-07-13 2012-10-24 新兴铸管股份有限公司 Steel-plastic composite protective sleeve
CN103195989A (en) * 2013-04-08 2013-07-10 上海天力实业(集团)有限公司 Plastic composite tube with metal pressure bearing layer clamped inside and machining method thereof
CN103883797A (en) * 2014-03-26 2014-06-25 乌海市公路工程有限公司 Construction method of steel wire mesh framework plastic composite pipe
CN112963632A (en) * 2021-03-11 2021-06-15 四川泰鑫实业发展有限责任公司 Flexible composite pipe and production method and production device thereof

Similar Documents

Publication Publication Date Title
CN102305316B (en) Internal rib-reinforced outer corrugated plastic wound structural wall pipe and manufacturing method thereof
CN2472029Y (en) Plastic composite pipe with steel net sheath
CN110714576A (en) Corrugated steel pipe restricts steel core concrete column that UHPC component is strengthened
CN104279379A (en) Continuously wound reinforced corrugated pipe and manufacturing method thereof
CN102072365B (en) Method and device for manufacturing plastic composite pipe with flexibly-knitted wire mesh skeleton
CN104329519A (en) Externally corrugated plastic tube structure wall pipe and production method thereof
CN201014069Y (en) Steel skeleton plastic composite pipe
CN104295815A (en) Winding corrugated pipe and manufacturing method thereof
CN102052526A (en) Double-wall corrugated pipe formed through winding and provided with metal framework reinforcement and manufacturing method thereof
CN102661452B (en) Tube-framework plastic composite tube and producing process thereof
CN215215130U (en) Compound reinforced pipe of inside and outside two pressure-bearing porous frameworks
CN213871498U (en) Steel wire mesh framework pipe
GB1475190A (en) Chain-link fencing
CN106051325B (en) The composite reinforced pipe of overall steel-plastic and its processing method
CN102661453B (en) Tube-framework strengthened plastic composite tube and producing process thereof
CN103418627B (en) Little radius-thickness ratio cold-drawn roll-welding steel pipe and combination revolving die drawing pipe crimping equipment
CN201242001Y (en) Large diameter steel mesh reinforced plastic pressure pipe
CN109099225A (en) A kind of double muscle winding bellowss of plastics
CN2892311Y (en) Aluminium pipe forming welding platoform
JPH07308726A (en) Manufacture of air-permeable molding
CN2482615Y (en) Plastic steel pipe with multi-strand hinged reinforced steel network
CN2217495Y (en) Thread-connected prestressed steel reinforced concrete well tube
CN203880254U (en) Production apparatus for thermoplasticity-reinforcing composite tube with spiral longitudinal reinforcing belt
KR100519633B1 (en) The manufacturing method of composite dual steel tubing
CN2491673Y (en) Wide-bore low pressure liquid transfer plastic pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee