Prior art keywords
space
reinforcing bar
shaped reinforcing
frames
stop rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00243939
Other languages
Chinese (zh)
Inventor
钟文川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00243939 priority Critical patent/CN2446195Y/en
Application granted granted Critical
Publication of CN2446195Y publication Critical patent/CN2446195Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a structure of a building wallboard. A plurality of shear force pins which are protruded out are prearranged on two I-shaped steel frames, a plurality of upright distance frames are arranged in parallel between the I-shapes steel frames, and every two distance frames are positioned by connecting frames in transverse connection; inner meshes and outer meshes are respectively pasted on both sides of each of the distance frames, and an interval between upper and lower meshes are cast with concrete to cause the concrete after air drying to form a wallboard; particularly the shear force pins which are protruded out on the I-shaped steel frames can grip the concrete and the I-shaped steel frames in connection. The wallboard can carry out in situ operation quickly without precasting to reduce a lot of unnecessary transportation and transportation cost, and realize various angular changes easily according to actual demands.

Description

The structure of building wall board
The utility model relates to a kind of structure of building board wall, be meant the non-prefabricated component of main employing especially, exempt from the structure of form removal, between the steel I-beam that overlap joint is finished, directly construct, thereby reach the purpose of saving cost, quick construction, can reach the board wall of making the multi-angle variation according to actual needs according to this structure.
Usually, the traditional architecture thing is to set in advance brick or reinforcing bar in board wall mostly when building board wall, and two-layer wooden form is built in the outside, then therebetween concrete spouting, and to make this wallboard.But need stripping after utilizing this method construction, quite trouble; Then, appearance along with the steel skeleton construction building, just transfer to adopt the mode of prefabricated board wall, after soon the main skeleton of each floor structure of building will be barricaded as with steel I-beam, measure the spacing between each steel I-beam again, and change places according to the size of measuring and to water cast plate in advance, and then the wallboard of precasting is transported to the building site, with crane lifting between steel I-beam.This method still has following defective: 1. owing to adopt the mode of precasting, the error that is produced when therefore measuring or during precasting can't make driving fit fully between the board wall finished and steel I-beam, therefore also will make finishing or precasting again to board wall.2. owing to take the mode of precasting, the wallboard behind the precasting also will be transported to the building site, and again by crane lifting, has therefore increased the cost of construction.When 3. being arc as if this board wall angle, the mode of this precasting just is difficult to accomplish accurately.
The purpose of this utility model is to provide a kind of structure of building wall board, the structure of adopt non-precasting, exempting from form removal is finished board wall, during construction, utilization is being built between the steel I-beam of finishing, direct overlap joint building wall board of the present utility model is saved cost, quick construction to reach, and can be finished the purpose of the board wall that multi-angle changes with actual needs.
Above-mentioned purpose of the present utility model can be achieved through the following technical solutions.
A kind of structure of building wall board, it is characterized in that including: I-shaped reinforcing bar, net sheet, space-stop rack, link and WELDING STUDS, WELDING STUDS is convexly set in place, I-shaped reinforcing bar outer face, be arranged with space-stop rack in parallel between this I-shaped reinforcing bar, its L type lower plate of this space-stop rack is fixed on the I-shaped reinforcing bar or on the ground, offer perforation on each space-stop rack, this adjacent space-stop rack and I-shaped reinforcing bar in I-shaped reinforcing bar outside is abutted against, and space-stop rack both sides, fixedly be covered with the net sheet respectively, form the building wall board structure of a hollow thus.
Above structure is when aggregate erection, on two I-shaped reinforcing bars, set in advance the WELDING STUDS of several evaginations, and several upright space-stop racks are set between the I-shaped reinforcing bar, and it is its bottom is fixing, horizontal link is with the location between each space-stop rack, add in both sides then and cover Intranet sheet and external net slice, concrete perfusion is come in space in the utilization between lower net plate, concrete after air-dry, to freeze solidly between space-stop rack, link and WELDING STUDS,, provide this concrete grasping force by the WELDING STUDS of evagination, guarantee that the wallboard of finishing closely is connected with the I-shaped reinforcing bar, unlikely collapse mutually from.
Compare with the wall body structure in the prior art, the utlity model has following significant advantage: 1., therefore saved construction cost because the utility model slab-wall structure has adopted non-precasting, the mode of exempting from form removal is carried out site operation to board wall; 2. because the concrete of evagination WELDING STUDS that the I-shaped reinforcing bar in the utility model slab-wall structure is provided with and perfusion forms a grasping force, can make body of wall more solid; 3. the utility model board wall can realize that various angles change with actual needs.
Below in conjunction with embodiment and accompanying drawing the structure of utility model and the effect that is produced are done detailed explanation:
Fig. 1 is a three-dimensional exploded view of the present utility model.
Fig. 2 is a sectional drawing of the present utility model.
See also illustrated in figures 1 and 2, the utility model mainly includes: I-shaped reinforcing bar 11,12, Intranet sheet 21,22, external net slice 23,24, space-stop rack 3, connection 4 and WELDING STUDS 5 etc., this I-shaped reinforcing bar 11,12 overlap in advance with building and to form, the end convexes with an amount of WELDING STUDS 5 outside, I-shaped reinforcing bar 11,12 are arranged with an amount of space-stop rack 3 in parallel, this space-stop rack 3 is fixed on its L type lower plate on the I-shaped reinforcing bar of ground or below in advance with staple 39, offer perforation 38 on each space-stop rack 3, be used for link 4 horizontal location, and at I-shaped reinforcing bar 11, space-stop rack 3 and I-shaped reinforcing bar 11 that 12 outsides are adjacent, 12 are connected, this space-stop rack 3 is fixedly connected with Intranet sheet 21,22, and the opposite side of space-stop rack 3 correspondences also is fixed with external net slice 23 by screw 29,24.By above structure as can be known, this slab-wall structure that paste in these I-shaped reinforcing bar 11,12 outsides, form the slab-wall structure of a hollow, last space concrete perfusion on this net sheet top, this concrete will fully be dispersed throughout between Intranet sheet 21,22 and the external net slice 23,24, air-dry through a period of time, this concrete just is set in 5 of space-stop rack 3, link 4 and WELDING STUDS, and because the WELDING STUDS 5 of this evagination provides grasping force for this concrete, can guarantee to finish perfusion and air-dry board wall, as long as repair Intranet sheet 21,22 and external net slice 23,24 smooth again.
Because the utility model structure is to finish with site operation, compares with prefabricated board wall and reduce many unnecessary carryings, conveying cost, and can realize smoothly according to actual needs that various angles change.

Claims (1)

  1. A kind of structure of building wall board, it is characterized in that including: I-shaped reinforcing bar, net sheet, space-stop rack, link and WELDING STUDS, WELDING STUDS is convexly set in place, I-shaped reinforcing bar outer face, be arranged with space-stop rack in parallel between this I-shaped reinforcing bar, its L type lower plate of this space-stop rack is fixed on the I-shaped reinforcing bar, offer perforation on each space-stop rack for the horizontal location of link usefulness, this adjacent space-stop rack and I-shaped reinforcing bar in I-shaped reinforcing bar outside is abutted against, and space-stop rack both sides, fixedly be covered with the net sheet respectively, form the building wall board structure of a hollow thus.
CN 00243939 2000-07-26 2000-07-26 Structure of building wallboard Expired - Fee Related CN2446195Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00243939 CN2446195Y (en) 2000-07-26 2000-07-26 Structure of building wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00243939 CN2446195Y (en) 2000-07-26 2000-07-26 Structure of building wallboard

Publications (1)

Publication Number Publication Date
CN2446195Y true CN2446195Y (en) 2001-09-05

Family

ID=33603731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00243939 Expired - Fee Related CN2446195Y (en) 2000-07-26 2000-07-26 Structure of building wallboard

Country Status (1)

Country Link
CN (1) CN2446195Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100365229C (en) * 2003-07-02 2008-01-30 马拉研究所D.O.O. Constructing the large-span self-braced buildings of composite load-bearing wall-panels and floors
CN1948653B (en) * 2005-10-12 2010-05-26 汪右城 Precombined composite supporting frame construction method and its structure
CN102900195A (en) * 2011-07-26 2013-01-30 闫丕春 Inner wallboard and its manufacturing method
CN110273552A (en) * 2019-06-25 2019-09-24 中交一公局集团有限公司 A kind of tool improving WELDING STUDS positioning accuracy

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100365229C (en) * 2003-07-02 2008-01-30 马拉研究所D.O.O. Constructing the large-span self-braced buildings of composite load-bearing wall-panels and floors
CN1948653B (en) * 2005-10-12 2010-05-26 汪右城 Precombined composite supporting frame construction method and its structure
CN102900195A (en) * 2011-07-26 2013-01-30 闫丕春 Inner wallboard and its manufacturing method
CN110273552A (en) * 2019-06-25 2019-09-24 中交一公局集团有限公司 A kind of tool improving WELDING STUDS positioning accuracy

Similar Documents

Publication Publication Date Title
WO2015131792A1 (en) Building structure and construction method for same
WO2019206194A1 (en) Prefabricated floor slab, connection structure thereof and construction method therefor
CN106088330B (en) The connection structure and its construction method of assembling frame beam and frame column based on 3D printing
CN108277881A (en) A kind of assembled beam-column connecting node
CN202430876U (en) Floor system with structure of steel and concrete precast slabs
CN2446195Y (en) Structure of building wallboard
CN203113217U (en) Steel box component and steel box-concrete combined U-shaped beam consisting of same
CN101148910A (en) Reinforced composite dismounting-free die building construction method
CN219773324U (en) Concrete beam plate structure
CN103046462A (en) Steel box component and steel box-concrete combined U-shaped girder composed of same
CN105332450A (en) Rapidly assembled non-dismantling heat preservation template for exterior wall
CN106088470B (en) Assembly concrete complex case shape beam and its construction method
CN215907025U (en) Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column
CN214737405U (en) Inner operating platform of thin-wall hollow high pier
CN208472975U (en) A kind of across frame structure deflecting support node structure of steel bar girder plate
CN210140934U (en) Lightweight concrete internal partition board
CN207846658U (en) The modularization node of prefabricated buildings
CN207714722U (en) A kind of setting assembling type suspension scaffold
JP5174786B2 (en) Rafter unit for roof construction, roof construction block and roof construction method of building
CN201031453Y (en) Novel building plate wall structure
CN207032474U (en) A kind of assembly concrete frame structure beam column rigid connection node
CN111364680A (en) Preformed column for reserved steel bars
CN210857723U (en) Light steel and light concrete combined prefabricated part
CN205153223U (en) Heat preservation template is exempted from to tear open by fast assembly's outer wall
CN213449076U (en) Pour rust-resistant truss plate of exempting from to tear open of floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee