CN2436652Y - Anchor rod pretightening installation means - Google Patents

Anchor rod pretightening installation means Download PDF

Info

Publication number
CN2436652Y
CN2436652Y CN 00215529 CN00215529U CN2436652Y CN 2436652 Y CN2436652 Y CN 2436652Y CN 00215529 CN00215529 CN 00215529 CN 00215529 U CN00215529 U CN 00215529U CN 2436652 Y CN2436652 Y CN 2436652Y
Authority
CN
China
Prior art keywords
anchor
anchor pole
oil pump
electric coal
coal drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00215529
Other languages
Chinese (zh)
Inventor
雷进
田祟平
杨广祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00215529 priority Critical patent/CN2436652Y/en
Application granted granted Critical
Publication of CN2436652Y publication Critical patent/CN2436652Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pre-tightening installing device for anchor rods, which is composed of a stretched jack 1, an oil pump 2, an oil pipe 3, a sheathed type top press head 4 and an electric coal drill 5. Because the top press head of the pre-tightening installing device for anchor rods uses the sheathed type so that the top head is caused to have the advantages of compact structure, reasonable structure and small size, [and] thus, the exposed part of an anchor rod or an anchor cable is reduced; at the same time, because the electric coal drill is directly used by dynamic force, a pull wire in a drift is reduced. The utility model can be used for installing pre-stress anchor rods or pre-stress anchor cables.

Description

Anchor pole gives tight erector
The utility model relates to and gives stress anchor pole erecting device, and specifically a kind of anchor pole gives tight erector, is applicable to that the stress anchor pole that gives in coal mining or the tunnelling is installed.
In the driving in the exploitation in colliery or tunnel, the rock stratum is adopted bolt support or cable bolting mostly, stress is given in also having applied of having, and claims to give the stress anchor pole or give the stress anchor cable.Use at present give the stress anchor pole or anchor cable is made of the body of rod, anchor slab, key, need use special-purpose erecting tools when skyhook or anchor cable, it is applied give stress, this instrument comprises stretch-draw jack, oil pump, oil pipe, motor special and stacked roof pressure head, this stacked roof pressure head is owing to wedge top, spring, overlapping being installed in of platen are coiled in the top, so structure is not compact, volume is big, use inconvenient, and after the anchor pole installation, the anchor pole exposed portions serve is bigger, and stream takes material, reduces the tunnel useful area.Simultaneously, because of motor is special-purpose, range of application is narrower, and in addition, in work progress, perforating is given the stress anchor pole with pump and installation and all needed independent backguy with pump, is unfavorable for construction.
The purpose of this utility model is to provide a kind of compact conformation, volume is little, application is convenient, the anchor pole of economical with materials, available electric coal drill driven by motor gives tight erector.
The utility model is achieved in that this anchor pole gives tight erector and is made of stretch-draw jack, oil pump, oil pipe, and the front end of its stretch-draw jack and sleeve type roof pressure head are connected and fixed, and oil pump is connected transmission with electric coal drill.Sleeve type roof pressure head is by Pan Ding, the wedge top, spring, platen constitutes, the wedge top, spring, platen is sleeved in the dish top successively, spring is contained in the wedge top, the wedge top is sleeved in the dish top, platen is rotated in the outside on wedge top, and be sleeved in the dish top, make structure more reasonable by suit, compactness has reduced the volume of roof pressure head, has dwindled the anchor pole exposed portions serve, oil pump is connected transmission with electric coal drill by connecting axle, one end of connecting axle and the turning cylinder of electric coal drill are connected and fixed, and the turning cylinder of the other end and oil pump is connected and fixed, and electric coal drill is general in perforating with when giving tight anchor pole, reduce backguy, helped operation.In addition, also can establish upper bearing (metal) and bracing frame, with the stability that keeps rotating at the connecting axle place.
The utility model is compared with the existing stress anchor pole erecting tools that gives, and its advantage is:
1, the roof pressure header structure is reasonable, compact, volume is little, application is convenient.
2, electric coal drill is general, has reduced backguy, helps producing.
3, the anchor pole exposed portions serve is little, has reduced consumptive material, has increased the tunnel useful area.
Below in conjunction with accompanying drawing the utility model is described in further detail.
Fig. 1 looks schematic diagram for the utility model master.
Fig. 2 is the utility model sleeve type roof pressure head cross-sectional schematic.
Make the utility model with reference to accompanying drawing 1,2.This anchor pole gives tight erector, is made of stretch-draw jack 1, oil pump 2, oil pipe 3, and the front end of stretch-draw jack 1 and sleeve type roof pressure head 4 are connected and fixed, and oil pump 2 is connected transmission with electric coal drill 5.Sleeve type roof pressure head 4 is made of dish top 6, wedge top 7, spring 8, platen 9, and wedge top 7, spring 8, platen 9 are sleeved in the dish top 6 successively, and spring 8 is contained in the wedge top 7, and wedge top 7 is sleeved in the dish top 6, and platen 9 is rotated in the outside on wedge top 7, and is sleeved in the dish top 6; Oil pump 2 is connected transmission with electric coal drill 5 by connecting axle 10, and an end of connecting axle 10 and the turning cylinder of electric coal drill 5 are connected and fixed, and the turning cylinder of the other end and oil pump 2 is connected and fixed.The outer end of connecting axle 10 also is provided with bearing and bracing frame, with the stability that keeps rotating.When using the utility model, to coil top 6 is pressed on the anchor slab, wedge top 7 is pressed on the fixedly key of anchor pole, anchor pole or anchor cable pass the center cavity on wedge top 7, be stuck on the locking device in the stretch-draw jack 1, open electric coal drill 5, drive oil pump 2 work, 1 work of stretch-draw jack, outer on the one hand anchor pole or the anchor cable of drawing, promotion dish top 6 compresses anchor slab on the one hand, and simultaneously, wedge top 7 effects by spring 8 compress key, anchor pole or anchor cable are given tightly, when electric coal drill quit work, because the effect of key, anchor pole or anchor cable can not bounce back because of locking.

Claims (3)

1. an anchor pole gives tight erector, is made of stretch-draw jack (1), oil pump (2), oil pipe (3), it is characterized in that the front end of stretch-draw jack (1) and sleeve type roof pressure head (4) are connected and fixed, and oil pump (2) is connected transmission with electric coal drill (5).
2. anchor pole according to claim 1 gives tight erector, it is characterized in that sleeve type roof pressure head (4) is made of Pan Ding (6), wedge top (7), spring (8), platen (9), wedge top (7), spring (8), platen (9) are sleeved in the Pan Ding (6) successively, spring (8) is contained in the wedge top (7), wedge top (7) is contained in the Pan Ding (6), platen (9) is rotated in the outside on wedge top (7), and is sleeved in the Pan Ding (6).
3. anchor pole according to claim 1 gives tight erector, it is characterized in that oil pump (2) is connected transmission with electric coal drill (5) by connecting axle (10), one end of connecting axle (10) is connected with electric coal drill (5) turning cylinder, and the other end is connected with the turning cylinder of oil pump (2).
CN 00215529 2000-07-18 2000-07-18 Anchor rod pretightening installation means Expired - Fee Related CN2436652Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00215529 CN2436652Y (en) 2000-07-18 2000-07-18 Anchor rod pretightening installation means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00215529 CN2436652Y (en) 2000-07-18 2000-07-18 Anchor rod pretightening installation means

Publications (1)

Publication Number Publication Date
CN2436652Y true CN2436652Y (en) 2001-06-27

Family

ID=33581459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00215529 Expired - Fee Related CN2436652Y (en) 2000-07-18 2000-07-18 Anchor rod pretightening installation means

Country Status (1)

Country Link
CN (1) CN2436652Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590843A (en) * 2013-11-21 2014-02-19 山东大学 Full-thread anchor rod pre-tightening force exertion device capable of rapidly hauling off anchor rod and operation method
CN104164876A (en) * 2014-08-12 2014-11-26 四川准达科技有限责任公司 Auxiliary anchor cable installing device
CN104295308A (en) * 2014-09-19 2015-01-21 天地科技股份有限公司 Anchor rod drawing device and method
CN105370303A (en) * 2015-11-26 2016-03-02 湖南科技大学 Tensioning device for deep roadway high-prestress anchor bolt support and operation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590843A (en) * 2013-11-21 2014-02-19 山东大学 Full-thread anchor rod pre-tightening force exertion device capable of rapidly hauling off anchor rod and operation method
CN103590843B (en) * 2013-11-21 2015-10-21 山东大学 A kind of full-thread bolt pretightning force bringing device and method of operating can moving back anchor fast
CN104164876A (en) * 2014-08-12 2014-11-26 四川准达科技有限责任公司 Auxiliary anchor cable installing device
CN104164876B (en) * 2014-08-12 2016-01-06 四川准达科技有限责任公司 A kind of anchor cable auxiliary installing device
CN104295308A (en) * 2014-09-19 2015-01-21 天地科技股份有限公司 Anchor rod drawing device and method
CN105370303A (en) * 2015-11-26 2016-03-02 湖南科技大学 Tensioning device for deep roadway high-prestress anchor bolt support and operation method thereof

Similar Documents

Publication Publication Date Title
CN2423318Y (en) Explosion expanded rockbolt
CN2436652Y (en) Anchor rod pretightening installation means
CN206245745U (en) Hand-held concrete dabbing machine
CN2475832Y (en) Anchor rod recovery apparatus
CN214993764U (en) Civil engineering pile foundation fixed knot constructs
CN101148971B (en) Cutting mechanism of anchor bar drilling machine
CN2606169Y (en) Homocentric drill with separate drive
CN2431311Y (en) Electric stamper driven forward-backward
CN2240609Y (en) Self-advance type anchoring-bolt
CN212867601U (en) Shell stock installation device rises
CN210117703U (en) Foundation leveling device with damping function
CN201618873U (en) Electric hammer drill for mine
CN2532177Y (en) High-frequency insert type concvete vibrator needle with built-in motor
CN2176432Y (en) String-assembling and shell-expanding roofbolt
CN2185325Y (en) Self-drilling slurry filling type anchoring-bolt system
CN217974349U (en) Novel ground anchor structure
CN215108747U (en) Cutter device for reaming and reinforcing anchor rope of coal mine anchor rod
CN2216590Y (en) Anchoring-bolt
CN214660233U (en) Anchor net roadway temporary supporting device
CN214091920U (en) Supporting frame for coal mining tunneling roadway
CN2303082Y (en) Spiral anchoring-bolt
CN216428257U (en) Pile driver convenient to move
CN211104866U (en) Concrete construction joint side chisel hair device
CN218322207U (en) Hammering noise reduction device for municipal road construction
CN221032413U (en) Pile driver for road construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee