CN2428698Y - Small-boiler energy-saving desulfurizing dust-collecting integrated apparatus - Google Patents
Small-boiler energy-saving desulfurizing dust-collecting integrated apparatus Download PDFInfo
- Publication number
- CN2428698Y CN2428698Y CN 00223584 CN00223584U CN2428698Y CN 2428698 Y CN2428698 Y CN 2428698Y CN 00223584 CN00223584 CN 00223584 CN 00223584 U CN00223584 U CN 00223584U CN 2428698 Y CN2428698 Y CN 2428698Y
- Authority
- CN
- China
- Prior art keywords
- dust
- smoke box
- flue
- air
- energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Chimneys And Flues (AREA)
Abstract
The utility model relates to a small-boiler energy-saving desulfurizing dust-collecting integrated apparatus, which is composed of a dusting collector, a fume energy-saving refrigerator, a draught fan, a spraying desulfurizing tower, sedimentation tanks, a neutralization tank and a water dusting collecting chamber, wherein, the fume energy-saving refrigerator (2) is connected with the dust collector (1) and the draught fan (4); the draught fan (4) is connected with the spraying desulfurizing tower (6) through an outlet press head (5) of the draught fan; a flue (8), the sedimentation tanks (9) and (12) and the neutralization tank (10) are arranged on the water dust collecting chamber (11). Energy-saving, desulfurizing and dust-collecting can be integrate in a small-boiler fume treatment; the energy saving efficiency is high; the desulfurizing dust removing efficiencies are good; the utility model is suitable for cooling and purifying for a small-boiler fume and a stove and kiln with high-temperature fume.
Description
The utility model relates to the boiler desulfurization dust arrester, and particularly a kind of miniature boiler is energy-conservation, desulfurization, dust removal integrated plant.
In the prior art small scall coal-fired boiler is administered, is made fume emission reach emission standard of air pollutants for boilers, but in improvement, also depositing following problem:
1, air-introduced machine band water, fan belt water not only influences exerting oneself of blower fan, and owing to contain the composition of sulfurous acid and sulfuric acid mist, has corroded draught fan impeller and casing, has shortened the life cycle of air-introduced machine.
2, the small low-voltage boiler mostly adopts the wing cast iron gilled tube economizer to flue gas waste heat recovery at present, in use causes cigarette ash to stop up easily, directly has influence on boiler combustion.Operating pressure was higher than boiler pressure during cast iron gilled tube economizer used, and belonged to pressure-vessel, operated strictly for this reason, needed monitoring to use, and the flue-gas temperature time requirement of being fed water influences, and the exhaust gas temperature instability is unfavorable for wet scrubbing desulfurization requirement.
3, since miniature boiler, particularly 2T/h with assistant's baker because the furnace type structure aspect, exhaust gas temperature is generally higher, this has not only wasted the energy, and is unfavorable for the improvement of flue gas desulfurization and dedusting.
4, at present in the improvement of arcola desulfurization and dedusting, very inconvenient to sedimentary removing, influence treatment facility and normally move.
The purpose of this utility model is: provide that a kind of miniature boiler is energy-conservation, desulfurization, dust removal integrated plant, it can be in the too high cooling and purification treatment of miniature boiler flue gas and stove, kiln exhaust gas temperature, collect energy-conservation, desulfurization, dust removal integrated the time, reach the energy-saving efficiency height, operating cost is low, floor space is little, desulfurization and dedusting is effective, operation is simple, small investment, purpose that comprehensive utilization ratio is high.
Formation of the present utility model: form by deduster, flue gas energy saving cooler, air-introduced machine, spray desulfurizing tower, sedimentation basin, neutralization pond and water bath dust-removing chamber, deduster (1) is connected with flue gas energy saving cooler (2), flue gas energy saving cooler (2) is connected with air-introduced machine (4) by air inlet duct (3), air-introduced machine (4) connects spray desulfurizing tower (6) by air-introduced machine discharge head (5), goes up in water bath dust-removing chamber (11) spray desulfurizing tower (6), water pump (7), flue (8), sedimentation basin (9) (12) and neutralization pond (10) are installed.Heat exchanger tube (18) upper end is upper smoke box (27), the lower end is lower smoke box (25), lower smoke box (25) is connected with ash dropping hopper (20) with flue (17) respectively, be installed in the casing (19), exhanst gas outlet (28) and upper smoke box cover plate (13) are arranged on the upper smoke box (27), on the upper smoke box cover plate, be welded with guide vane (14), smoke inlet (16) is arranged on the flue (17), water inlet (15), delivery port (24) and telethermometer silk seat (26) are arranged on casing (19).
Compared with the prior art, the utility model is rational in infrastructure, and during boiler smoke process flue gas energy saving cooler, dust has been removed about 60%, and when entering air-introduced machine, flue gas is a dry flue gas, has overcome the fan belt water problem.
The flue gas energy saving cooler is a kind of water---the gas heat exchanger, its heat transfer rate height as long as control the flow (forced circulation) of water well, just can be controlled the flue gas discharge temperature effectively.
Energy-saving effect is obvious, with exhaust smoke level 5000m
3About/h, about 350 ℃ of flue-gas temperatures, exhaust gas temperature is controlled at about 120 ℃, equipment operation 1 hour, the 152000KJ~200000KJ that can conduct heat can make the 2m of inflow temperature about 20 ℃
3Water reaches more than 40 ℃, is equivalent to save about the thermal efficiency 70% boiler consumption coal 15kg.Hot water can also can be connected with softened water tank for taking a shower, and improves the boiler feed water temperature, reaches the purpose of energy savings.
Sediment is outdoor at water bath dust-removing, is convenient to remove, and the solution after the desulfurization can be recycled behind neutralization pond and milk of lime reaction regeneration, and therefore, non-wastewater discharge does not cause secondary pollution.
Low (the about 80-100mmHO of this device flue gas resistance
2), it has changed the situation that former dust-removal and desulfurizing overall process is all carried out under condition of negative pressure, made full use of centrifugal blower air outlet positive pressure head and carried out desulfurization and dedusting.
This device adopts and does, wet two-stage dedusting, the efficiency of dust collection height.Two alkaline process washing desulphurizations are adopted in desulfurization, belong to gas, liquid reaction, and rate of sulphur expulsion is fast, efficient height, calcium utilization height.
This device also can be used for other stove, kiln cooling, dedusting, purifies flue gas and recovery waste heat.
The flue gas energy saving cooler belongs to heat exchanger class normal pressure product, has overcome the stifled grey shortcoming of cast iron gilled tube economizer and the characteristics of band pressure work, and the heat exchange effect is better than cast iron gilled tube economizer.
Make and install easily, simple to operate, as long as connect the import and export flue flange, add running water or soft water and can move use.
Accompanying drawing 2 is vertical views of accompanying drawing 1;
Accompanying drawing 3 is flue gas energy saving cooler front views;
Accompanying drawing 4 is right views of accompanying drawing 3;
Accompanying drawing 5 is vertical views of accompanying drawing 3.
Embodiment of the present utility model: shown in accompanying drawing 1, accompanying drawing 2, the smoke inlet of flue gas energy saving cooler (2) is connected with deduster (1), exhanst gas outlet is connected with air-introduced machine (4) by air inlet duct (3), air-introduced machine (4) is connected with spray desulfurizing tower (6) by air-introduced machine discharge head (5), goes up in water bath dust-removing chamber (11) spray desulfurizing tower (6), water pump (7), flue (8), sedimentation basin (9) (12) and neutralization pond (10) are installed.
Flue gas enters flue gas energy saving cooler (2) by low-resistance deduster (1), enter air-introduced machine (4) about 120 ℃ of cigarette temperature by air inlet duct (3), after by air-introduced machine discharge head (5) flue gas being sent into spray desulfurizing tower (6), water bath dust-removing chamber (11) and washed, discharge clean flue gas by flue (8).
As accompanying drawing 3, accompanying drawing 4, shown in the accompanying drawing 5, between upper smoke box (27) and lower smoke box (25), be communicated with it by many heat exchanger tubes (18), lower smoke box (25) is connected with ash dropping hopper (20) with flue (17) respectively, be installed in the casing (19), exhanst gas outlet (28) and upper smoke box cover plate (13) are arranged on the upper smoke box (27), on the upper smoke box cover plate, be welded with guide vane (14), smoke inlet (16) is arranged on the flue (17), water inlet (15) is arranged on casing (19), delivery port (24), telethermometer silk seat (26), overflow pipe (29) and sewage draining exit (21), casing is supported by support (23).
After flue gas entered casing (19) inner flue (17) by smoke inlet (16), flue gas flow direction heat exchanger tube (18) to air-introduced machine, was promptly finished the heat exchange overall process from upper smoke box (27) exhanst gas outlet (28).Running water or soft water enter casing (19) by water inlet (15), and water inlet is by ball-cock assembly control water level, and water flowed out from overflow pipe (29) when ball-cock assembly was malfunctioning.Water pump is picked out the mouth of a river (24), and cigarette Wen Houyong valve control discharge is observed the thermometer of drawing from remote temperature support (26) this moment after measured, grasps the heat exchange temperature.
Open plate ash-draining gate (22), get rid of the dust stratification of ash dropping hopper (20).Regularly open upper smoke box cover plate (13), the dust stratification in the cleaning heat exchanger tube (18) is checked the abrasion condition of guide vane (14) when opening, so that in time change.
Claims (2)
1, a kind of miniature boiler is energy-conservation, desulfurization, dust removal integrated plant, by deduster, the flue gas energy saving cooler, air-introduced machine, spray desulfurizing tower, sedimentation basin, neutralization pond and water bath dust-removing chamber are formed, it is characterized in that: deduster (1) is connected with flue gas energy saving cooler (2), flue gas energy saving cooler (2) is connected with air-introduced machine (4) by air inlet duct (3), air-introduced machine (4) connects spray desulfurizing tower (6) by air-introduced machine discharge head (5), goes up in water bath dust-removing chamber (11) spray desulfurizing tower (6) is installed, water pump (7), flue (8), sedimentation basin (9) (12) and neutralization pond (10).
2, miniature boiler according to claim 1 is energy-conservation, desulfurization, dust removal integrated plant, it is characterized in that: heat exchanger tube (18) upper end is upper smoke box (27), the lower end is lower smoke box (25), lower smoke box (25) is connected with ash dropping hopper (20) with flue (17) respectively, be installed in the casing (19), exhanst gas outlet (28) and upper smoke box cover plate (13) are arranged on the upper smoke box (27), on the upper smoke box cover plate, be welded with guide vane (14), smoke inlet (16) is arranged on the flue (17), water inlet (15) is arranged on casing (19), delivery port (24) and telethermometer silk seat (26).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00223584 CN2428698Y (en) | 2000-06-30 | 2000-06-30 | Small-boiler energy-saving desulfurizing dust-collecting integrated apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00223584 CN2428698Y (en) | 2000-06-30 | 2000-06-30 | Small-boiler energy-saving desulfurizing dust-collecting integrated apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2428698Y true CN2428698Y (en) | 2001-05-02 |
Family
ID=33588108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00223584 Expired - Fee Related CN2428698Y (en) | 2000-06-30 | 2000-06-30 | Small-boiler energy-saving desulfurizing dust-collecting integrated apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2428698Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104888588A (en) * | 2015-06-29 | 2015-09-09 | 颜声林 | Exhaust gas treatment device with energy-saving and environment-friendly functions |
CN105588142A (en) * | 2016-03-22 | 2016-05-18 | 中国能源建设集团广东省电力设计研究院有限公司 | Desulfurizing absorption tower and flue gas heat exchanger integrated flue gas system behind dust remover |
-
2000
- 2000-06-30 CN CN 00223584 patent/CN2428698Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104888588A (en) * | 2015-06-29 | 2015-09-09 | 颜声林 | Exhaust gas treatment device with energy-saving and environment-friendly functions |
CN105588142A (en) * | 2016-03-22 | 2016-05-18 | 中国能源建设集团广东省电力设计研究院有限公司 | Desulfurizing absorption tower and flue gas heat exchanger integrated flue gas system behind dust remover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203155034U (en) | Energy saving and smoke purifying device of boiler | |
CN202835409U (en) | Smoke dust waste-heat utilization and dust removing device of low-capacity boiler | |
CN204952337U (en) | Wet flue gas desulfurization heat pipe formula heat transfer defogging device | |
CN106051800A (en) | Energy-saving and environment-friendly two-circuit parallel type smoke waste heat recycling device and method | |
CN2428698Y (en) | Small-boiler energy-saving desulfurizing dust-collecting integrated apparatus | |
CN213746819U (en) | Boiler flue gas waste heat recovery device | |
CN209204947U (en) | With the matching used dual dust pelletizing system of coal-fired hot-blast stove | |
CN105299674B (en) | A kind of Multifunctional smoke energy-saving and emission-reduction system | |
CN201006390Y (en) | Oil-containing smoke purifying installation | |
CN209828585U (en) | Calcium carbide furnace gas purifying and dust removing device | |
CN2468567Y (en) | Spraying and rotating film type apparatus for purifying flue gas | |
CN208389773U (en) | A kind of condensing type heating stove wet-desulfurizing dust remover | |
CN206045704U (en) | A kind of desulfurizer for little Miniature coal-fired boiler | |
CN110894954A (en) | High-temperature tail gas purification and waste heat recovery system | |
CN201497398U (en) | High-efficiency automatic dust-removing heat exchanger | |
CN201055749Y (en) | Water immersion type flue gas dust wiper | |
CN205635673U (en) | Converter coal gas clarification plant that once removes dust | |
CN214345064U (en) | Environment-friendly energy-saving industrial waste gas treatment device | |
CN109915844A (en) | A kind of atmosphere pollution energy conservation improvement utilization system | |
CN211537006U (en) | Wet dust remover | |
CN210544252U (en) | Boiler flue gas de-whitening heat exchange device | |
CN216047559U (en) | High-efficiency energy-saving gas steam generator | |
CN214486255U (en) | Boiler flue gas waste heat recovery utilizes economizer system | |
CN221051899U (en) | Blast furnace roof diffused gas collecting and recycling device | |
CN218608632U (en) | Dust pelletizing system of high-efficient boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |