CN2414001Y - Ballasting water-tank for installation of drum shape fundation platform - Google Patents
Ballasting water-tank for installation of drum shape fundation platform Download PDFInfo
- Publication number
- CN2414001Y CN2414001Y CN 99247435 CN99247435U CN2414001Y CN 2414001 Y CN2414001 Y CN 2414001Y CN 99247435 CN99247435 CN 99247435 CN 99247435 U CN99247435 U CN 99247435U CN 2414001 Y CN2414001 Y CN 2414001Y
- Authority
- CN
- China
- Prior art keywords
- water tank
- platform
- water
- ballast water
- ballast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model belongs to an improvement of a ballasting and levelling device when a drum-shaped foundation conduit frame platform is installed. The ballasting water-tank device is composed of a pump group, a ballasting water tank, water pipe lines, etc., wherein, the bottom of the ballasting water tank is welded with four conical splicing columns; a splicing socket is put on the top of a conduit frame; the bottom of the pump group module is welded with four circular splicing rods; the splicing socket is put on a bottom layer platform of the conduit frame; the ballasting water tank and the pump group module are connected by a rubber water pipe. The device can be used for increasing initialization such as mud and controlling the inclination of the platform when the drum-shaped foundation conduit frame platform is installed.
Description
The improvement of ballast and leveling equipment when the utility model belongs to the installation of barrel base jacket platform.
Bucket Foundation Platform is a kind of platform of novel concept, and it has replaced the pile foundation basis with barrel-shaped shallow foundation, utilizes negative pressure to carry out offshore construction, avoided numerous and diverse marine guidance piling and pile extension operation, save the engineering time, thereby reduced executive cost, reduced the offshore construction risk.Bucket Foundation Platform is in installation process, and initial penetration into mud is an important stage, and can it is related to barrel base form sealing and sinking smoothly.When especially using barrel base in the neritic area, the lightweight construction of platform own, grounding pressure is little, though adopt thin-wall construction can be added to mud in the bottom of bucket, but because the requirement of stability, the bottom of bucket can not be designed enough thinly, if run into top layer hard place base (as the top layer iron plate sand of Shengli Oil Field neritic area), the basic initial penetration into mud of bucket is still more shallow, might can't form sealing and set up negative pressure.Platform passes through in the process heavy, and the control difficulty that tilts especially after the bucket base is gone into the mud certain depth, only relies on crane barge can't adjust the flat-bed leaning angle.The initial penetration into mud and the control of tilting become the important step that the restriction Bucket Foundation Platform is used.
The purpose of this utility model provides a kind of ballast water tank water device, overcomes above-mentioned difficulties, and the barrel base jacket platform is installed in the area shallow at seawater easily, that the top layer ground is hard.Add water by the pump pack module in ballast water tank water, increase flat-bed construction weight, grounding pressure increases, and initial penetration into mud increases, thereby reaches the condition that negative pressure is set up; Adjust the interior water distribution in each district of water tank by pump pack module and bleed valve, change the flat-bed center-of-gravity position, produce and transfer the square of going all out, guarantee platform heavy passing through in the slant range of permission all the time.
Four cabins that the utility model has the advantages that ballast water tank water are separate, and each cabin is provided with bleed valve, and water distribution is adjustable, but both ballast was added to mud, adjustable again whole flat-bed tilt quantity; Water tank and pump component are two modules, all are plugged on the jacket, and the two connects by rubber tube, and is easy for installation; Platform installs, but piecemeal hang and move water tank and pump pack module, device can reuse.After using this device, the marine set-up time of bucket based platform is short, and construction risk reduces, and development benefit increases.
Technical solution of the present utility model is: it is made up of pump group, ballast water tank water, valve, water pipeline etc., the ballast water tank water bottom is welded with 4 conical inserting columns, plug socket is put in the jacket top, pump pack module bottom is welded with 4 circular shanks, plug socket is put on the jacket underlying platform, and ballast water tank water is connected by the rubber water pipe with the pump pack module; Ballast water tank water is provided with four independently cabins, and each cabin is provided with the bleed valve group and is connected with the bleed off bar; One end of rubber water pipe is connected on the pump pack module, and the other end fixedly hangs on the top, cabin of ballast water tank water with steel rope.
Figure of description:
Fig. 1: a kind of ballast water tank water device elevational schematic view that is used for the Bucket Foundation Platform installation
Description of drawings:
1. ballast water tank water 2. pump pack modules 3. jackets 4. bleed valve groups
5. bleed off bar 6. rubber water pipes 7. inserting columns 8. shanks
9. underlying platform
Now the utility model is further described: press required size, location designing requirement making ballast water tank water in conjunction with Figure of description, the ballast water tank water of subsidiary bleed valve, bleed off bar pegged graft is positioned over the top of jacket, and the pump pack module is pegged graft and is positioned over the underlying platform of jacket; At last ballast water tank water is connected by the rubber water pipe with the pump pack module, an end of rubber water pipe is connected on the pump pack module, and the other end fixedly hangs on the top, cabin of ballast water tank water with steel rope.During marine the installation, put to the seabed with the crane barge platform of slinging, add water by the pump pack module in ballast water tank water, increase flat-bed construction weight, grounding pressure increases, and initial penetration into mud increases, thereby is easier to reach the condition that negative pressure is set up; Adjust the interior water distribution in each district of water tank by pump pack module and bleed valve, water filling in going into the few cooresponding cabin of bucket of mud, perhaps opening bleed valve bleeds off into a part of water in the mud cooresponding cabin of bucket how, change the flat-bed center-of-gravity position, produce and transfer the square of going all out, adjustable whole flat-bed inclination angle guarantees platform heavy passing through in the slant range that allows all the time.Platform installs, and hangs with the crane barge piecemeal and moves water tank and pump pack module, and device can reuse.After using this device, the marine set-up time of bucket based platform is short, and construction risk reduces, and development benefit increases.
Claims (3)
1. one kind is used for the ballast water tank water device that Bucket Foundation Platform is installed, it is made up of pump group, ballast water tank water, valve, water pipeline etc., it is characterized in that ballast water tank water [1] bottom is welded with 4 conical inserting columns [7], plug socket is put in jacket [3] top, pump pack module [2] bottom is welded with 4 circular shanks [8], plug socket is put on the jacket underlying platform [9], and ballast water tank water [1] is connected by rubber water pipe [6] with pump pack module [2].
2. a kind of ballast water tank water device that Bucket Foundation Platform is installed that is used for according to claim 1 is characterized in that ballast water tank water [1] is provided with four independently cabins, and each cabin is provided with bleed valve [4] and is connected with bleed off bar [5].
3. a kind of ballast water tank water device that Bucket Foundation Platform is installed that is used for according to claim 1 and 2 is characterized in that an end of rubber water pipe [6] is connected on the pump pack module [2], and the other end fixedly hangs on the top, cabin of ballast water tank water [1] with steel rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99247435 CN2414001Y (en) | 1999-12-13 | 1999-12-13 | Ballasting water-tank for installation of drum shape fundation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 99247435 CN2414001Y (en) | 1999-12-13 | 1999-12-13 | Ballasting water-tank for installation of drum shape fundation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2414001Y true CN2414001Y (en) | 2001-01-10 |
Family
ID=34032867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 99247435 Expired - Fee Related CN2414001Y (en) | 1999-12-13 | 1999-12-13 | Ballasting water-tank for installation of drum shape fundation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2414001Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101463595B (en) * | 2007-12-18 | 2010-12-01 | 中国海洋石油总公司 | Internal-external holding type conduit tube rack levelling device |
CN104321488A (en) * | 2012-03-24 | 2015-01-28 | Owlc控股有限公司 | Structures for offshore installations |
CN104805818A (en) * | 2015-02-15 | 2015-07-29 | 金海重工股份有限公司 | Negative-pressure automatic maintaining system for large bucket foundation production platform |
CN109295948A (en) * | 2018-08-24 | 2019-02-01 | 武汉船用机械有限责任公司 | A kind of method and system of jack-up unit automatic stowage |
CN109455274A (en) * | 2019-01-02 | 2019-03-12 | 上海海事大学 | A kind of pier stabilising arrangement |
CN113235514A (en) * | 2021-04-30 | 2021-08-10 | 天津大学 | Compartment suction type steel cylinder island wall revetment structure designed in lower subdivision and installation method |
CN113235515A (en) * | 2021-04-30 | 2021-08-10 | 天津大学 | Subdivision bulkhead designed backfill suction type steel cylinder island wall structure and installation method |
-
1999
- 1999-12-13 CN CN 99247435 patent/CN2414001Y/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101463595B (en) * | 2007-12-18 | 2010-12-01 | 中国海洋石油总公司 | Internal-external holding type conduit tube rack levelling device |
CN104321488A (en) * | 2012-03-24 | 2015-01-28 | Owlc控股有限公司 | Structures for offshore installations |
US9771700B2 (en) | 2012-03-24 | 2017-09-26 | Owlc Holdings Ltd. | Structures for offshore installations |
EP2828435B1 (en) * | 2012-03-24 | 2017-10-11 | OWLC Holdings Ltd. | Structures for offshore installations |
CN104805818A (en) * | 2015-02-15 | 2015-07-29 | 金海重工股份有限公司 | Negative-pressure automatic maintaining system for large bucket foundation production platform |
CN109295948A (en) * | 2018-08-24 | 2019-02-01 | 武汉船用机械有限责任公司 | A kind of method and system of jack-up unit automatic stowage |
CN109455274A (en) * | 2019-01-02 | 2019-03-12 | 上海海事大学 | A kind of pier stabilising arrangement |
CN109455274B (en) * | 2019-01-02 | 2024-02-27 | 上海海事大学 | Water platform stabilizing device |
CN113235514A (en) * | 2021-04-30 | 2021-08-10 | 天津大学 | Compartment suction type steel cylinder island wall revetment structure designed in lower subdivision and installation method |
CN113235515A (en) * | 2021-04-30 | 2021-08-10 | 天津大学 | Subdivision bulkhead designed backfill suction type steel cylinder island wall structure and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107542101B (en) | Construction method of offshore four-buoy-buoyancy tank combined foundation structure | |
CN109914408B (en) | Pile driving ship and attitude adjusting, positioning control and pile driving method thereof | |
US3896628A (en) | Marine structures | |
CA1235913A (en) | System for driving open end pipe piles on the ocean floor using pneumatic evacuation and existing hydrostatic pressure | |
CN200971492Y (en) | Pile submarine drilling basal disc with suction | |
CN107653895B (en) | Combined offshore six-buoy buoyancy tank foundation structure and construction method thereof | |
CN109629568A (en) | The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating | |
CN107630461B (en) | Combined offshore four-buoy buoyancy tank foundation structure and construction method thereof | |
US4109477A (en) | Offshore driller rig | |
CN107806108A (en) | Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea | |
CA1067794A (en) | Apparatus for producing power from water waves | |
CN2414001Y (en) | Ballasting water-tank for installation of drum shape fundation platform | |
CN1317160C (en) | Self-installed suction anchor | |
GB2130623A (en) | System for drilling from a water surface which is insensitive to the swell | |
CN107740436A (en) | A kind of three floating drum buoyancy tank combined type foundation structures of sea and its construction method | |
CN107630462A (en) | A kind of six floating drum buoyancy tank combined type foundation structures of sea and its construction method | |
CN1298586C (en) | Floating transported and sucking cylindered anchor device and its operating method | |
WO2010143976A2 (en) | A foundation, a method of manufacturing the foundation, and a method of installing the foundation on a seabed | |
CN109024660A (en) | Pile foundation method for dismounting and offshore foundation method for dismounting | |
JP2003049439A (en) | Jacket structure | |
CN201347191Y (en) | Suction pile type ocean floor drilling novel basal disc | |
CN109518674A (en) | A kind of method of construction of man-made island segment, assembled man-made island and assembled man-made island | |
WO2014202948A1 (en) | Gravity base for a marine structure | |
CN107724414A (en) | Five floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea | |
CN1384018A (en) | Movable barrel base oil recovery platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |