CN2378374Y - Improved double-drum lifter - Google Patents

Improved double-drum lifter Download PDF

Info

Publication number
CN2378374Y
CN2378374Y CN 98219220 CN98219220U CN2378374Y CN 2378374 Y CN2378374 Y CN 2378374Y CN 98219220 CN98219220 CN 98219220 CN 98219220 U CN98219220 U CN 98219220U CN 2378374 Y CN2378374 Y CN 2378374Y
Authority
CN
China
Prior art keywords
lifting container
weight
steel cables
rope
track adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98219220
Other languages
Chinese (zh)
Inventor
袁保林
孙连仁
李晓峰
阳龙宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98219220 priority Critical patent/CN2378374Y/en
Application granted granted Critical
Publication of CN2378374Y publication Critical patent/CN2378374Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to an improved double-drum lifter. When the utility model is used for a vertical (upright) well, both ends of two rolling drums of the utility model are respectively wound with a steel rope of an overlay rope and the steel rope of an underlay rope; other ends of the two steel ropes which are wound in the same direction are respectively connected with two lifting devices or a balancing bell, and four guide wheels are correspondingly collocated on a headframe. A guide wheel is additionally arranged on the headframe; both ends of the steel rope which is flexibly lapped on the guide wheel are respectively connected with two lifting containers (or the balancing bell) to reduce the maximum static tension of the steel rope of the lifter, and thus three-rope type multi-rope lifting is formed. Consequently, the pattern selection of the lifter can be lower with one to two stages, corresponding investment of well building and operation cost are reduced, and lifting work is safe.

Description

Improved double-drum hoist
The utility model relates to mine hoist equipment, mainly is can only make the single-rope hoisting mode at double-drum hoist to change the multi rope winding mode into, is used for promoting or transfer weight at perpendicular (standing) well.
Mine hoist equipment is the visual plant of mining industry.Mainly undertaking the vertical transport task, is the key link of mining industry transportation.Both at home and abroad in perpendicular (standing) well promotes, the equipment that generally uses has two big classes at present: one makes single-rope hoisting as double-drum hoist; One makes multi rope winding for multi-rope friction hoisting machine.And the latter is used for deep-well more and be the mine of big-and-middle-sized scale.The twin-roll lifting means mainly consists of the following components: the other end that the coaxial cylinder that two quilts drive simultaneously, two head rolls respectively twine a steel cable (winding direction is opposite), two steel cables be connected with lifting container respectively (twin containers lifting), or one be connected with lifting container, and another root is connected (single container band counterweigght winding) with bob-weight and two steel cables need respectively dispose a track adjusting wheel on derrick.Double-drum hoist is pressed the classification typing of productive capacity size at present.Select the main foundation of lifting means, the one, it is poor to satisfy biggest quiet tension and biggest quiet tension that steel cable bears; The one, cylinder holds the needs that the rope amount must satisfy hoisting depth (especially when perpendicular (standing) well lifting personnel, require winding of single layer particularly outstanding).
Main purpose of the present utility model is: the first, can only change into the multi rope winding mode to double-drum hoist as single-rope hoisting, because steel cable is thinner, the Rong Shengliang that makes the cylinder winding of single layer increases and has improved the service hoisting depth of winding of single layer, and makes it have the advantage of multi rope winding; The second, effectively reduce the steel cable biggest quiet tension that gig bears.In a word, make gig type selecting " degradation " (promptly need select φ 3.5m for use and can select φ 3.0m for use even select φ 2.5m gig for use) as far as possible, reach the minimizing annual running cost of reducing investment outlay by traditional design.
The utility model proposes in perpendicular (standing) well, using double-drum hoist (seeing Fig. 1 and Fig. 2), is by two coaxial drive cylinders (1), a thinner underlap steel cable (6) and a thinner overlap steel cable (5) that two coaxial drive cylinders (1) twine respectively, the other end of two underlap steel cables (6) connects a lifting container (8), two overlap steel cables (5) other end connects a lifting container or a bob-weight (9), two underlap steel cables (6) required two less track adjusting wheels (3) on derrick, two overlap steel cables (5) required two less track adjusting wheels (2) on derrick.Here two track adjusting wheels (3) and two track adjusting wheels (2) are staggeredly arranged for double-layer horizontal, its horizontal separation distance equals the width between centers of lifting container (8) and lifting container or bob-weight (9), and promotes central lines on the line of centres and extended line thereof of lifting container (8) and lifting container or bob-weight (9).With regard to having formed two lifting containers or a lifting container and a bob-weight, the container amount of cylinder winding of single layer is increased (promptly increasing the hoisting depth of service) like this by the two rope formula multi rope windings that two thinner steel cables are suspending in midair.
Promote the steel cable biggest quiet tension in order to reduce, set up the 5th track adjusting wheel (4) on the derrick, steel cable (7) one ends that ride on the 5th track adjusting wheel (4) of living are connected with lifting container (8), the other end is connected with lifting container or bob-weight (9).The 5th track adjusting wheel (4) is arranged on the position, middle, below of two track adjusting wheels (2), track adjusting wheel (4) diameter should equal the width between centers of lifting container (8) and lifting container or bob-weight (9), the two ends of steel cable (7) are connected with lifting container or bob-weight (9) with lifting container (8) respectively, and its position is respectively in the middle of two steel cables (6) and two steel cables (5).Two lifting containers or a lifting container and the three rope formula multi rope windings that bob-weight is suspending in midair by 3 steel cables have been formed so again.
The utility model advantage is:
(1) the utility model is applicable to that all perpendicular (standing) wells promote applied range:
(2) the utility model makes it change the multi rope winding mode into by single-rope hoisting to the collocation form change that double-drum hoist promotes, and has not only improved the degree of safety that promotes, and has increased the service hoisting depth of steel cable winding of single layer;
(3) the utility model is set up the 5th track adjusting wheel and the 5th steel cable on derrick, has reduced the steel cable biggest quiet tension that acts on the gig effectively;
(4) the utility model improves the derrick strained condition, simplifies perpendicular (standing) well safety facilities;
(5) the utility model is brought into play the ability of gig fully, reach gig type selecting " degradation " effectively, correspondingly save electric power and reduced winding houses maintenance crane specification, receive and save shaft building and equipment investment, reduce the economic benefit of annual running cost.
Fig. 1 looks scheme drawing for the utility model master.
Fig. 2 is the utility model schematic top plan view.
Be indefiniteness embodiment (seeing 1 figure and Fig. 2) below, double-drum hoist be described in perpendicular (standing) well promotes, the comparison (seeing attached list) aspect lectotype selection of new collocation form and conventional arrangement form.
Double-drum hoist tradition and new arrangement comparison sheet subordinate list
Sequence number Project Double drum hoist promotes configuration
The conventional arrangement form The new arrangement form
1 Gig 2Jk-3/20, v=5.73m/ s, machinery weight~53.15t 2Jk-2.5/11.5, v=5.52 m/s, machinery weight~38.4t
2 Promote electrical motor YR450-8,N=400kW YR500-12,N=355kW
3 Promote the guiding principle rope 6 Δs (33)-Φ 36.5-p5.53 3-L270, two weight~3t 6 Δs (33)-Φ 22-p2.055-L240,4 weight~2t
The 5th guiding principle rope 6 Δs (33)-Φ 22-p2.055-L170, weight~0.35t
4 Track adjusting wheel Φ 3.0m, individual weight~2.69t, two weight~5.38t Φ 2.0m, individual weight~1.23t, 4 weight~4.92t
The 5th track adjusting wheel Φ 1.936m, individual weight~1.2t,
5 Cage weight and suspension gear height thereof Weight~5.5t, suspension gear height~2.45m Weight~5.4t, suspension gear height~3.45m
6 Disconnected rope anti-falling facility Snub rope and check band weight~5.4t, anti-falling facility and platform weight~5.5t thereof,
7 Mineshaft diameter and height (comparable difference) Φ 5.5m, highly~4.87m
8 Derrick height (comparable difference) Highly~5.62m
9 Derrick track adjusting wheel podium level (comparable difference) Highly~1.73m
10 Winding houses Length * wide * rubber height=14 * 13 * 6.5m Length * wide * rubber height=13 * 12 * 5m
11 Capital expenditure (comparable difference) (ten thousand yuan) 80~100 0
12 Annual running cost (%) 100 ≤90

Claims (2)

1. improved double-drum hoist, the other end that mainly comprises two coaxial drive cylinders (1), its (6) overlap steel cables of a underlap steel cable (5) that twine respectively, two underlap steel cables (6) connect a lifting container (8), two overlap steel cables (5) other end connect a lifting container or bob-weight (9), two underlap steel cables (6) required on the derrick two track adjusting wheels (3) are set, two overlap steel cables required two track adjusting wheels (2) that are provided with on derrick is characterized in that:
A. an end of two underlap steel cables (6) is the same direction end that is fixed on two head rolls (1), the other end is connected with lifting container (8), one end of two overlap steel cables (5) is the other direction end that is fixed on two head rolls (1), the other end is connected with lifting container or bob-weight (9), but must be pointed out, bob-weight both can hang on two overlap steel cables, also can hang on two underlap steel cables;
B. two track adjusting wheels (3) and two track adjusting wheels (2) are for double-layer horizontal is staggeredly arranged, and its distance that staggers equals the width between centers of lifting container (8) and lifting container or bob-weight (9);
C. promote central lines on the line of centres and extended line thereof of lifting container (8) and lifting container or bob-weight (9).
2. according to the described improved double-drum hoist of claim 1, it is characterized in that:
A. the 5th track adjusting wheel (4) is arranged on the position, middle, below of two track adjusting wheels (2);
B. track adjusting wheel (4) diameter should equal the width between centers of lifting container (8) and lifting container or bob-weight (9);
C. steel cable (7) is to live in riding on the track adjusting wheel (4);
D. the two ends of steel cable (7) are connected with lifting container or bob-weight (9) with lifting container (8) respectively, and its position is in the middle of two steel cables (6) and two steel cables (5) respectively.
CN 98219220 1998-08-01 1998-08-01 Improved double-drum lifter Expired - Fee Related CN2378374Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98219220 CN2378374Y (en) 1998-08-01 1998-08-01 Improved double-drum lifter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98219220 CN2378374Y (en) 1998-08-01 1998-08-01 Improved double-drum lifter

Publications (1)

Publication Number Publication Date
CN2378374Y true CN2378374Y (en) 2000-05-17

Family

ID=33971364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98219220 Expired - Fee Related CN2378374Y (en) 1998-08-01 1998-08-01 Improved double-drum lifter

Country Status (1)

Country Link
CN (1) CN2378374Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1323023C (en) * 2001-07-16 2007-06-27 杨光良 Lifter suspended by multiple cables and balanced by tail cable
CN102283619A (en) * 2011-07-01 2011-12-21 上海普英特高层设备有限公司 Double-rope groove multilayer hoisting mechanism
CN104340811A (en) * 2014-10-23 2015-02-11 重庆大学 Double-rope winding type lifter for ultra-deep well
CN104590974A (en) * 2014-11-28 2015-05-06 中信重工机械股份有限公司 Multi-rope composite type mine elevator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1323023C (en) * 2001-07-16 2007-06-27 杨光良 Lifter suspended by multiple cables and balanced by tail cable
CN102283619A (en) * 2011-07-01 2011-12-21 上海普英特高层设备有限公司 Double-rope groove multilayer hoisting mechanism
CN102283619B (en) * 2011-07-01 2014-10-29 上海普英特高层设备有限公司 Double-rope groove multilayer hoisting mechanism
CN104340811A (en) * 2014-10-23 2015-02-11 重庆大学 Double-rope winding type lifter for ultra-deep well
CN104590974A (en) * 2014-11-28 2015-05-06 中信重工机械股份有限公司 Multi-rope composite type mine elevator

Similar Documents

Publication Publication Date Title
CN104590974A (en) Multi-rope composite type mine elevator
CN107618963B (en) Large-load goods elevator suspension system with traction ratio of 6 to 1
CN203568650U (en) Mine vertical shaft elevating system with main elevator and auxiliary elevator
CN2378374Y (en) Improved double-drum lifter
CN205011258U (en) A double small car actuating mechanism for passing through formula double small car bank bridge
CN201183702Y (en) Novel silo hoisting device using movable pulley
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN1666948A (en) Inside climbing tower crane with multi-hook and deep well winch
CN105645275B (en) Cable hoist and its construction method
CN105129612A (en) Double-trolley drive mechanism used for traversing type double-trolley quay crane
CN101863423A (en) Steel box beam cable carrying lifter for construction of suspension bridge
CN215666505U (en) Dual-drive elevator
CN101407299B (en) Double-cylinder articulated multi-rope winding type hoist
CN206783157U (en) Overhead explosion-proof crane with rolling screen door cut-off workshop
CN201125127Y (en) Ultralong electric gourd
CN212245836U (en) 12: 1 traction structure for heavy-load goods elevator
CN209023976U (en) A kind of Novel counterweight diversion sheave device
CN201525716U (en) Main hook driving mechanism of crown block
CN111439657A (en) 12: 1 traction structure for heavy-load goods elevator
CN101537983B (en) Hoisting method of large-scale equipment in factory building for high-altitude positioning
CN201458453U (en) Hoisting device with combined rope pulley
CN113291951B (en) Multi-winding composite traction elevator and adjusting method
CN220951058U (en) Traction lifting stacker
CN204416891U (en) A kind of head four rope lifting wheels
CN220432167U (en) Mine lifting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Yuan Baolin

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee