CN2345622Y - Outer wall suspending structure scaffold - Google Patents

Outer wall suspending structure scaffold Download PDF

Info

Publication number
CN2345622Y
CN2345622Y CN 98239549 CN98239549U CN2345622Y CN 2345622 Y CN2345622 Y CN 2345622Y CN 98239549 CN98239549 CN 98239549 CN 98239549 U CN98239549 U CN 98239549U CN 2345622 Y CN2345622 Y CN 2345622Y
Authority
CN
China
Prior art keywords
scaffold
utility
model
triangular support
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98239549
Other languages
Chinese (zh)
Inventor
王彦明
赵立斌
刘鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Prov No1 Building Engineering Co
Original Assignee
Heilongjiang Prov No1 Building Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Prov No1 Building Engineering Co filed Critical Heilongjiang Prov No1 Building Engineering Co
Priority to CN 98239549 priority Critical patent/CN2345622Y/en
Application granted granted Critical
Publication of CN2345622Y publication Critical patent/CN2345622Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to an outer wall hanging structure scaffold which belongs to the construction tool. The utility model is composed of triangle supports, scaffold boards, safety guard fences, draw bars, bolts, nuts, pad boards and hangers, wherein the hangers are arranged on a right-angle side of the triangle support, the scaffold board is fixed on the other right-angle side of the two triangle supports, the safety guard fence is connected with the external side of the scaffold board, and the safety guard fence and the scaffold board are fixed by the draw bars. The utility model solves the problem of overlapping of the scaffolds from the ground to a top, and has the advantages of small lump sum investment, short turnaround periodicity, repeated use and layer-by-layer lift in construction, lower engineering cost and safety.

Description

Exterior wall suspended structure scaffold
The utility model belongs to the realm of building construction, relates to a kind of exterior wall suspended structure scaffold.
Usually highrise building major project construction, all need set up scaffold, set up from ground up to building and only bind, after building is completed, row is removed again, the disposable input of this scaffold is many, and turn around time is long, and efficient is low, prolong the duration, increase construction costs, amount of high-altitude operation is big simultaneously, has hidden danger.
The purpose of this utility model provides a kind of simple in structure, easy installation and removal, quick, and turnover is fast, can directly be fixed on the suspended structure scaffold on the exterior wall.
The technical solution of the utility model realizes as follows:
The utility model is made up of two triangular support bracket, scaffold floor and safety barrier, pull bar, stay bolt, nut, backing plate and suspenders, one right-angle side of triangular support bracket is provided with suspender, scaffold floor is fixed on another right-angle side of two triangular support brackets, safety barrier is connected the outside of scaffold floor, and safety barrier and scaffold floor are fixed together by pull bar, one end of stay bolt is fixed on the exterior wall by nut and backing plate, the other end is connected with suspender on the triangular support bracket, forms exterior wall suspended structure scaffold.
Advantage of the present utility model is: simple in structure, easy installation and removal, solve scaffold in the building operations and set up a problem of taking the top from ground, disposable less investment, turn around time is short, in whole construction course, the utility model can successively promote, and reuses, and reduces construction costs, realize civilized construction, safe and reliable.
Description of drawings:
Fig. 1 is an overall structure schematic diagram of the present utility model;
Fig. 2 is a scheme of installation of the present utility model;
Fig. 3 is the structural representation of triangular support bracket of the present utility model.
Be specific embodiment of the utility model below:
The utility model comprises two triangular support brackets 1, scaffold floor 2, safety barrier 3, pull bar 4, stay bolt 5, nut 6, cushion block 7 and suspender 8 compositions.Triangular support bracket 1 usefulness channel-section steel is welded, and connects in order to strengthen rigidity, and each weld of triangular support bracket 1 can be reinforced a stiffener again, and a right-angle side is provided with a suspender 8, is welded into channel-section steel, and its below adds a cushion block 9.Scaffold floor 2 usefulness angle steel are linked to be framework, spread flat board, and are fixed on another right-angle side of two triangular support brackets 1, safety barrier 3 usefulness steel pipes are linked to be, and be connected with scaffold floor 2, its bottom welds together with scaffold floor 2, and the top is formed by connecting with pull bar 4 and scaffold floor 2.Process the stay bolt 5 that has crotch and the nut 6 that is complementary with it and backing plate 7 with steel.The utility model is a plurality of to link together, around every one week of one storey building.During construction, from second floor, reserve bolt 5 holes at every layer of underfloor, the spacing of the suspender 8 on hole spacing and the triangular support bracket 1 is corresponding.Every layer of hole is all on same horizon.
During installation, the stay bolt 5 that will have crotch passes reserving hole, and at bolt 5 previous generation's upper padding plates 7 and the nut 6 of inner side of outer wall, with tower crane scaffold floor 2 is sling, and is articulated on the crotch of the bolt 5 that stretches out exterior wall, check errorless after, nut 6 is tightened.Can construct around just installing in a week of first floor.During dismounting, only the nut 6 of side is unscrewed within the walls, the utility model can be sling, and after slinging, directly hangs on the stay bolt 5 of a floor, enters next life cycle then.

Claims (1)

1, a kind of exterior wall suspended structure scaffold, comprise scaffold floor (2) and safety barrier (3), it is characterized in that: by two triangular support brackets (1), scaffold floor (2), safety barrier (3), pull bar (4), stay bolt (5), nut (6), cushion block (7) and suspender (8) are formed, one right-angle side of triangular support bracket (1) is provided with suspender (8), scaffold floor (2) is fixed on another right-angle side of two triangular support brackets (1), safety barrier (3) is connected the outside of scaffold floor (2), and safety barrier (3) and scaffold floor (2) are fixed together with pull bar (4), one end of stay bolt (5) is fixed on the exterior wall by nut (6) and backing plate (7), the other end is connected with suspender (8) on the triangular support bracket (1), forms exterior wall suspended structure scaffold.
CN 98239549 1998-12-01 1998-12-01 Outer wall suspending structure scaffold Expired - Fee Related CN2345622Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98239549 CN2345622Y (en) 1998-12-01 1998-12-01 Outer wall suspending structure scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98239549 CN2345622Y (en) 1998-12-01 1998-12-01 Outer wall suspending structure scaffold

Publications (1)

Publication Number Publication Date
CN2345622Y true CN2345622Y (en) 1999-10-27

Family

ID=33986904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98239549 Expired - Fee Related CN2345622Y (en) 1998-12-01 1998-12-01 Outer wall suspending structure scaffold

Country Status (1)

Country Link
CN (1) CN2345622Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101597956B (en) * 2008-06-06 2011-01-05 海洋石油工程股份有限公司 Suspended scaffold
CN101922230B (en) * 2009-06-12 2012-01-11 柏凯工程有限公司 Scaffolding guard bar
CN102587356A (en) * 2012-02-14 2012-07-18 南通建筑工程总承包有限公司 Joist frame
CN103498550A (en) * 2013-10-11 2014-01-08 郭德炳 Outer-extending scaffold convenient and rapid to use
CN103821334A (en) * 2014-02-27 2014-05-28 中天建设集团有限公司 Overhung scaffold with detachable triangular supports
CN104005547A (en) * 2014-06-19 2014-08-27 中兴建设有限公司 Suspension scaffold attached to wall
CN104018656A (en) * 2014-06-19 2014-09-03 中兴建设有限公司 Scaffold construction method for prefabricated outer wall
CN104074358A (en) * 2014-07-02 2014-10-01 中铁二局股份有限公司 Construction method of prefabricated assembled building
CN104975707A (en) * 2014-04-04 2015-10-14 吴庆豪 Shed frame and triangular support frame body of shed frame
CN105178618A (en) * 2015-07-31 2015-12-23 中天建设集团有限公司 Protecting frame for construction of prefabricated external wall board with bay window

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101597956B (en) * 2008-06-06 2011-01-05 海洋石油工程股份有限公司 Suspended scaffold
CN101922230B (en) * 2009-06-12 2012-01-11 柏凯工程有限公司 Scaffolding guard bar
CN102587356A (en) * 2012-02-14 2012-07-18 南通建筑工程总承包有限公司 Joist frame
CN102587356B (en) * 2012-02-14 2014-12-10 江苏中南建筑产业集团有限责任公司 Construction method of joist frame
CN103498550A (en) * 2013-10-11 2014-01-08 郭德炳 Outer-extending scaffold convenient and rapid to use
CN103821334A (en) * 2014-02-27 2014-05-28 中天建设集团有限公司 Overhung scaffold with detachable triangular supports
CN104975707A (en) * 2014-04-04 2015-10-14 吴庆豪 Shed frame and triangular support frame body of shed frame
CN104005547A (en) * 2014-06-19 2014-08-27 中兴建设有限公司 Suspension scaffold attached to wall
CN104018656A (en) * 2014-06-19 2014-09-03 中兴建设有限公司 Scaffold construction method for prefabricated outer wall
CN104074358A (en) * 2014-07-02 2014-10-01 中铁二局股份有限公司 Construction method of prefabricated assembled building
CN105178618A (en) * 2015-07-31 2015-12-23 中天建设集团有限公司 Protecting frame for construction of prefabricated external wall board with bay window

Similar Documents

Publication Publication Date Title
CN2345622Y (en) Outer wall suspending structure scaffold
CN101672102A (en) Steel structural overhead ceiling construction platform
CN201598820U (en) Single-point suspension external hanging rack
CN107090968A (en) Integrated form attached lifting scaffold and its elevating method
CN210798252U (en) Assembled outer protection frame system
CN103615103B (en) Suspension type assembling movable platform
CN211173007U (en) Novel tripod of encorbelmenting
CN210289078U (en) Light self-climbing type shielding frame system
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN216007746U (en) Lifting type elevator shaft safety operation platform
CN213171224U (en) Tower crane attached quick-mounting platform
CN211736308U (en) Self-sliding hanging frame device for mounting steel structure factory building roof inner plate
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN203783106U (en) Hanging assembling moving platform
CN207377096U (en) Overlength large girder scaffold building structure
CN216587638U (en) Scaffold frame steel protection network blank pressing formula connecting device
CN215564714U (en) Chimney derrick type dismantling device
CN211949527U (en) Combined hanging basket for construction of overhung eave of high-rise building
CN215407355U (en) Temporary diagonal draw bar of attached lifting scaffold
CN221051421U (en) Tool type tower crane operation frame platform
CN203654698U (en) Attached lifting scaffold structure provided with double guide rails
CN218176130U (en) Beam rising column joint
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN220165672U (en) Hoisting device for special-shaped steel structure roof
CN211736299U (en) Scaffold supporting system for multi-layer continuous supporting of outer wall of fabricated building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee