CN2290136Y - On-off coil protector for circuit braker - Google Patents

On-off coil protector for circuit braker Download PDF

Info

Publication number
CN2290136Y
CN2290136Y CN 97207754 CN97207754U CN2290136Y CN 2290136 Y CN2290136 Y CN 2290136Y CN 97207754 CN97207754 CN 97207754 CN 97207754 U CN97207754 U CN 97207754U CN 2290136 Y CN2290136 Y CN 2290136Y
Authority
CN
China
Prior art keywords
circuit
output
breaker
high level
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97207754
Other languages
Chinese (zh)
Inventor
罗昌林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97207754 priority Critical patent/CN2290136Y/en
Application granted granted Critical
Publication of CN2290136Y publication Critical patent/CN2290136Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Keying Circuit Devices (AREA)

Abstract

The utility model relates to an on-off coil protector for a circuit breaker. The input of a large power electronic switch and an energy dissipating circuit 2 is connected with an on-off coil, a control circuit 3 is switched off by the large power switch and the large power switch 2 is connected with a circuit 2 in parallel. The output of the circuit 2 is connected with a current sampling and diode amplitude limiting circuit 4, the output of the circuit 4 is connected with an on-off operation judging and starting circuit 5, the output of the circuit 5 is connected with a division and conjunction resisting circuit 6 of a two second time delay judging circuit breaker, the circuit 6 can start the circuit 3 and switch off the circuit 2 and the output of the circuit 5 is kept in high level. One path of the output of the circuit 6 is arranged according to a one second timing circuit 7, and a self-holding circuit 10 can be eliminated by the high level outputted by the circuit 6, so that the large power electronic switch 2 is switched on again.

Description

The circuit-breaker switching on-off coil protector
The utility model is relevant with the circuit-breaker switching on-off coil protector that Automation of Electric Systems and nothing are gone in the transformer station on duty.
In automation and unattended substation, because the operating mechanism stability of some circuit breaker is relatively poor, in time, has and refuses the situation generation that branchs refused to close or auxiliary contact break not open.Under unwatched situation, the power supply of rupturing operation in time promptly can cause and burn switching winding, closing contactor so that closing coil.Even more serious is, also burns tripping operation or combined floodgate latching relay, so that burns the i.e. system wiring board of protective relaying device, brings serious hidden danger to safe operation.
The purpose of this utility model this to provide a kind of volume little, low in energy consumption, external connection is simple, is convenient to on-the-spot circuit-breaker switching on-off coil protector with low cost, safe and reliable is installed.
The utility model is achieved in that
Power circuit 1 provides direct current to high-power electronic switch and energy dissipating circuit 2, the input of circuit 2 meets divide-shut brake coil HQ, TQ, it is 3 in parallel with circuit 2 that high power switch switches off control circuit, the output of circuit 2 connects current sample and diode limiting circuit 4, the output of circuit 4 connects breaker tripping and closing operation judgement and starting circuit 5 makes light-emitting diode DYD Chang Liang, as the work repeater lamp, the output of circuit 5 connects 2 seconds time-delay determining devices and refuses branch and refuse to close circuit 6, circuit 6 is operational amplifier IC2:C, resistance, the delay time circuit that electric capacity is formed, if circuit breaker can not be finished separating brake or making process in 2 seconds, then IC2:C exports high level, make the transistor BG3 conducting of control circuit 3, thereby breaking circuit 2, cut off the separating brake or the switching current of circuit breaker, starting state self-hold circuit 9 input circuits 5 that the high level of circuit 6 outputs is formed through resistance R 13 make the output of circuit 5 remain on high level state, the output one tunnel of circuit 6 connects by fortune pipe amplifier IC2:D and resistance, 1 second time circuit 7 of time-delay that electric capacity is formed, when circuit 3 turn-offed for 1 second, after HBJ in the breaker control circuit or TBJ reliably return, circuit 7 output high level are delivered to the inverting input of operational amplifier IC2:B, eliminate self-hold circuit 10 and make high-power electronic switch conducting again.
Power circuit 1 is square wave ac for the switch inversion stabilized voltage power supply with the direct current operative power source inversion, behind rectifying and wave-filtering, offer circuit 2 DC power supply, circuit 2 is by triode BG1, BG2 forms high-power electronic switch, circuit 3 is made of triode BG3, be in operation and be in cut-off state, BG1, the collector electrode of BG2 meets circuit-breaker switching on-off coil HQ, TQ, piezo-resistance YM1, capacitor C 1 is formed the energy dissipating circuit and is connected to BG1, between the collector electrode of BG2 and the working power negative pole, the sampling resistor R0 of circuit 4 is connected to BG1, the emitter of BG2, operational amplifier IC2:A outputs to the normal phase input end of comparator IC2:B after the R0 sampled voltage amplified 10 times, the inverting input of IC2:B meets variable resistor W2, regulate W2 and can determine starting current, normally in service, comparator IC2:B is output as low level, light-emitting diode DYD Chang Liang, during starting, IC2:B exports high level, and DYD extinguishes.The output of IC2:B is through resistance R 16, R17 connects the positive input of operational amplifier IC2:C, the reverse input end of IC2:C meets R14 and R15, capacitor C 5 is connected between R16 and the R15, the time circuit of forming 2 seconds time-delay determining devices, if primary cut-out can't be finished separating brake or separating brake process in 2 seconds, then operational amplifier IC2:C output high level is through 5 pin of R13 to IC2:B, make IC2:B remain on the output high level state, the output of IC2:C is simultaneously through resistance R 5, WD1 provides base current to transistor BG3, the BG3 conducting, the base current of bypass BG2 makes BG1, BG2 turn-offs immediately, the separating brake or the switching current of circuit breaker have been cut off, separating brake in the breaker control circuit or combined floodgate latching relay HBJ or TBJ promptly reliably return, remove current operating process, operational amplifier IC2:D, R21, R22, C7 etc. form the delay time circuit, IC2:D output low level at ordinary times, and diode D9 ends, when high-power electronic switch turn-offed for 1 second, after HBJ in the breaker control circuit or TBJ reliably returned, IC2:D output high level made the package unit involution to the inverting input 6 of comparator IC2:B.
The high level of operational amplifier output provides base flow to triode BG4, the BG4 conducting, DZD is bright for the actuating signal lamp, relay DZJ is moving, the 15V power supply is through DZJ1, and R18 makes BG4 be in the maintenance conducting state, and actuating signal is memorized, another dumb contact DZJ2 of relay DZJ can with local signal system or Computerized monitor system interface, manual reset switch FA is connected between the base stage and emitter of BG4.
Surpass 2 seconds when breaker open operation or switching current duration, the utility model then is judged to be circuit breaker and refuses branch and refuse to close, and auxiliary contact break not open or closing coil master fuse melting etc.Automatically cut off the negative supply in divide-shut brake loop this moment by the high-power electronic switch of establishing in the protective device.Energy dissipating circuit by being connected in parallel on the electronic switch bleeds off the electromagnetic energy that stores in the divide-shut brake coil.Through 1 second time, guarantee that HBJ closes a floodgate and keep and after TBJ trips latching relay really no current has returned, connect negative supply more automatically, reliably prevented the generation of above-mentioned fault.The purpose that the shutoff negative supply is connected after 1 second again is that after the circuit breaker once-through operation tripping that has, operation might success once more.This device also designs action inhibit signal lamp, and provides the signal relay dumb contact, is convenient to and supervisory control system remote signalling circuit interface.Actuating signal must must arrive the scene to impel the attendant through the involution of the ability of the hand resetting button on the device, checks the reason of circuit breaker tripping, and in time handles defective.
The utility model proves that through on-the-spot actual motion its design principle and side circuit are practicable.Device volume is little, and is low in energy consumption, and external connection is simple, is convenient to on-the-spot the installation, cheap.For improving the substation safety operation level, Chengdu Power Bureau sets up the project, at first goes in the station on duty to be extensive use of in comprehensive automation or nothing.Building and design and from now on old station being changed unwatched transformer station, the utility model is formally stood in the design drawing, in construction and rebuilding construction, once finish.
Following is accompanying drawing of the present utility model.
Fig. 1 is an operation principle block diagram of the present utility model.
Fig. 2 is circuit theory diagrams of the present utility model.
Fig. 3 front view of the present utility model.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 is the left view of Fig. 3.
Fig. 6 is the installation diagram of the utility model in electric power system.
Following is embodiment of the present utility model:
See Fig. 2 Lower Half, by triode BG5, BG6, capacitor C 9~C16, resistance R 23~R31, diode D10~D14, original shapes such as high frequency transformer JB constitute the self-energizing switches inverter.With 220V or 110V direct current operative power source, inversion is the square wave ac of 8KHZ.Through fast recovery diode GFD1, GFD2 rectification, output direct current 7V voltage after capacitor C 13, the CX filtering provides the enough base currents of high-power switch tube BG1, BG2 to guarantee high-power switch tube degree of depth saturation conduction.By original papers such as high-frequency rectification bridge ZLQ2, three-terminal voltage-stabilizing IC6, capacitor C 14~C16, form rectification, filtering and voltage stabilizing circuit, output 15V voltage is as the working power in the device.Guarantee operating power when ± 30% scope fluctuates, the work that device also can be reliable and stable.And play the effect of isolating and reducing power consumption as far as possible.
See Fig. 2 first half, form high-power electronic switch by triode BG1, BG2, triode BG3 in service is in cut-off state, the 7V power supply provides enough base currents through R4, D3 to BG2, BG1, BG2 degree of depth saturation conduction guarantee that the separating brake or the closing coil electric current of circuit breaker passes through electronic switch smoothly.Piezo-resistance YM1, capacitor C 1 are formed the disconnected energy circuit that disappears.The breaker mechanism fault, the utility model action is cut off by high-power electronic switch and to be divided, when closing electric current, discharge the electromagnetic energy of divide-shut brake coil storage by this energy dissipating circuit, has suppressed overvoltage, reliably protecting electronic switch.Diode D, D1 make the reverse protection of electronic switch.
R0 is 0.2 Ω/8W resistance, makes current sample and uses.Form amplifier by original papers such as operational amplifier IC2:A, resistance R 7~R9, the R0 sampled voltage is amplified 10 times.Form voltage comparator by amplifier IC2:B, resistance R 10~R12, potentiometer W2, regulate can the adjust starting current of this device of W2, generally adjusting is 0.15A, promptly applicable to the primary cut-out of various dc operations.Normally in service, comparator IC2:B is output as low level, and light-emitting diodes DYD Chang Liang is as the work repeater lamp of this device.During the device starting, IC2:B exports high level, and DYD extinguishes, and indication device reliably starts.
By elements such as amplifier IC2:C, resistance R 14~R17, capacitor C 5, form the time circuit of rechargeable time-delay action in about 2 seconds.To various primary cut-outs,, then be judged to be circuit breaker and gone out the barrier event if can't finish separating brake or making process in 2 seconds.At this moment, amplifier IC2:C exports high level, makes IC2:B remain on the output high level state through resistance R 13.Simultaneously provide base current to BG3 through R5, WD1, the BG3 conducting, bypass the base flow of BG2, BG1, BG2 are turn-offed immediately, cut off the separating brake or the switching current of circuit breaker.Separating brake in the breaker control circuit or combined floodgate latching relay, HBJ or TBJ promptly reliably return, and have removed current operating process.Guarantee that combined floodgate or switching winding HQ and TQ can not burnt out.Simultaneously, protected also that the relevant relay in the control loop is unlikely to be burnt out.
In the time of amplifier IC2:C output high level, provide the base flow of triode BG4 through D6, R19, WD2, the BG4 conducting, actuating signal lamp DZD lights, and relay DZJ is moving.The 15V power supply makes BG4 be in the maintenance conducting state through DZJ1, R18, and actuating signal is memorized.Another dumb contact DZJ2 of relay can with local signal system or Computerized monitor system interface, report protected circuit breaker generating mechanism fault once.Manually press signal return button F A, short circuit BG4 base flow, signal can be eliminated.
Form 1 second time circuit of time-delay by amplifier IC2:D, R21, R22, C7 etc., IC2:D output low level at ordinary times, diode D9 ends, and IC2:B does not have influence to comparator.When this device action, high-power electronic switch turn-offed for 1 second, and after HBJ in the breaker control circuit or TBJ reliably returned, IC2:D output high level was delivered to the inverting input of comparator IC2:B, makes the package unit involution.High-power electronic switch is conducting again, is ready to the operated once more possibility of circuit breaker.
The utility model has loam cake 12, base 13.Two row's binding posts 14 are arranged on the base, transparent terminal cap 15 is arranged on the terminal 14, installing hole 16 is arranged.
Use and points for attention:
During 1. on-the-spot the installation, according to device outline overall and installing dimensions figure, confirm to know the binding post numbering after, with reference to Fig. 6 wiring,, confirm could switch on after errorless through crosschecking.If wiring error, device can not shield, and also can damage this protective device even.Particularly No. 5 terminals of positive supply (1) misconnection at device; divide-shut brake coil tail end (2 ') misconnection is at No. 1 terminal; after the energising; can cause the high-power electronic switch direct short-circuit of positive and negative power supply in installing; burn electronic switch immediately; P cock tripping operation of control power supply or protection fusing ask 10,000,000 10,000,000 to pay attention to!
2. in order to reduce the amount of information of remote signalling, after the actuating signal relay dumb contact parallel connection of suggestion with each road device output, insert a remote signalling point of supervisory control system, send out the resultant signal of " circuit breaker operation mechanism fault ".Control end operations staff can according to which platform circuit breaker of remote operation at that time, or which platform relaying protection action, and which road once sent information such as " control loop broken strings ", and which platform circuit breaker operation mechanism fault differentiates is.There is red actuating signal lamp to keep on the device, is convenient to reaffirm to the scene.
3. on the device greensignal light is arranged, whether Chang Liang monitors power supply and installs at normal operating condition at ordinary times.During operating breaker, green light extinguishes, and the starting of device dress is described, design is whole group of on-the-spot for convenience debugging like this.If it is bright again that circuit breaker operation mechanism fault really, green light are extinguished after two seconds kinds, red light is also bright simultaneously, illustrates that device behind the correct operation, connected divide-shut brake loop negative supply again.
4. on-the-spot the installation, general with every covering device in the terminal board chest of switch cubicle, wiring nearby is the most convenient.Also can near the terminal board of protection or control flow, install.In a word, must be by after 1. the loop be distinguished in a requirement, correct wiring.

Claims (3)

1; a kind of circuit-breaker switching on-off coil protector; it is characterized in that power circuit (1) provides direct current to high-power electronic switch and energy dissipating circuit (2); the input of circuit (2) meets divide-shut brake coil HQ; TQ; high power switch switch off control circuit (3) in parallel with circuit (2); the output of circuit (2) connects current sample and diode limiting circuit (4); the output of circuit (4) connects breaker tripping and closing operation judgement and starting circuit (5) makes light-emitting diode DYD Chang Liang; as the work repeater lamp; the output of circuit (5) connects 2 seconds time-delay determining devices and refuses branch and refuse to close circuit (6); circuit (6) is operational amplifier IC2:C; resistance; the delay time circuit that electric capacity is formed; if circuit breaker can not be finished separating brake or making process in 2 seconds; then IC2:C exports high level; make the transistor BG3 conducting of control circuit (3); thereby breaking circuit (2); cut off the separating brake or the switching current of circuit breaker; starting state self-hold circuit (9) input circuit (5) that the high level of circuit (6) output is formed through resistance R 13 makes the output of circuit (5) remain on high level state; the output one tunnel of circuit (6) connects by fortune pipe amplifier IC2:D and resistance; 1 second time circuit (7) of time-delay that electric capacity is formed; when circuit (3) turn-offed for 1 second; after HBJ in the breaker control circuit or TBJ reliably return; circuit (7) output high level is delivered to the inverting input of operational amplifier IC2:B, eliminates self-hold circuit (10) and makes high-power electronic switch conducting again.
2; circuit-breaker switching on-off coil protector according to claim 1; it is characterized in that it is square wave ac with the direct current operative power source inversion that power circuit (1) has the switch inversion stabilized voltage power supply; behind rectifying and wave-filtering, offer circuit (2) DC power supply; circuit (2) is by triode BG1; BG2 forms high-power electronic switch; circuit (3) is made of triode BG3; be in operation and be in cut-off state; BG1; the collector electrode of BG2 meets circuit-breaker switching on-off coil HQ; TQ; piezo-resistance YM1; capacitor C 1 is formed the energy dissipating circuit and is connected to BG1; between the collector electrode of BG2 and the working power negative pole; the sampling resistor R0 of circuit (4) is connected to BG1; the emitter of BG2; operational amplifier IC2:A; output to the normal phase input end of comparator IC2:B after the R0 sampled voltage amplified 10 times; the inverting input of IC2:B meets variable resistor W2; regulate W2 and can determine starting current; normally in service; comparator IC2:B is output as low level, and light-emitting diode DYD Chang Liang is during starting; IC2:B exports high level, and DYD extinguishes.The output of IC2:B is through resistance R 16, R17 connects the positive input of operational amplifier IC2:C, the reverse input end of IC2:C meets R14 and R15, capacitor C 5 is connected between R16 and the R15, the time circuit of forming 2 seconds time-delay determining devices, if primary cut-out can't be finished separating brake or separating brake process in 2 seconds, then operational amplifier 1C2:C output high level is through the positive input of R13 to IC2:B, make IC2:B remain on the output high level state, the output of IC2:C is simultaneously through resistance R 5, WD1 provides base current to transistor BG3, the BG3 conducting, the base current of bypass BG2 makes B61, BG2 turn-offs immediately, the separating brake or the switching current of circuit breaker have been cut off, separating brake in the breaker control circuit or combined floodgate latching relay HBJ or TBJ promptly reliably return, remove current operating process, operational amplifier IC2:D, R21, R22, C7 etc. form the delay time circuit, IC2:D output low level at ordinary times, and diode D9 ends, when high-power electronic switch turn-offed for 1 second, after HBJ in the breaker control circuit or TBJ reliably returned, IC2:D output high level made the package unit involution to the inverting input of comparator IC2:B.
3, circuit-breaker switching on-off coil protector according to claim 1 and 2; the high level that it is characterized in that operational amplifier output provides base flow to triode BG4; the BG4 conducting; DZD is bright for the actuating signal lamp, and relay DZJ is moving, and the 15V power supply is through DzJ1; R18 makes BG4 be in the maintenance conducting state; actuating signal is memorized, another dumb contact DZJ2 of relay DZJ can with local signal system or Computerized monitor system interface, manual reset switch FA is connected between the base stage and emitter of BG4.
CN 97207754 1997-03-17 1997-03-17 On-off coil protector for circuit braker Expired - Fee Related CN2290136Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97207754 CN2290136Y (en) 1997-03-17 1997-03-17 On-off coil protector for circuit braker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97207754 CN2290136Y (en) 1997-03-17 1997-03-17 On-off coil protector for circuit braker

Publications (1)

Publication Number Publication Date
CN2290136Y true CN2290136Y (en) 1998-09-02

Family

ID=33927432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97207754 Expired - Fee Related CN2290136Y (en) 1997-03-17 1997-03-17 On-off coil protector for circuit braker

Country Status (1)

Country Link
CN (1) CN2290136Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332961A (en) * 2014-11-04 2015-02-04 国家电网公司 Burning proof protection device for switch opening and closing coil
CN106099866A (en) * 2016-06-20 2016-11-09 国家电网公司 There is the circuit breaker operation mechanism protection device of short message sending function
CN108761318A (en) * 2018-03-21 2018-11-06 北京四方继保自动化股份有限公司 A kind of intelligent double jump circle mimic-disconnecting switch
CN109119964A (en) * 2018-10-29 2019-01-01 国网辽宁省电力有限公司沈阳供电公司 Prevent the intelligent controller of switch trip coil burnout
CN113629873A (en) * 2021-08-16 2021-11-09 北京瑞凯软件科技开发有限公司 Contact net isolator monitoring unit based on IGBT realizes

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332961A (en) * 2014-11-04 2015-02-04 国家电网公司 Burning proof protection device for switch opening and closing coil
CN106099866A (en) * 2016-06-20 2016-11-09 国家电网公司 There is the circuit breaker operation mechanism protection device of short message sending function
CN106099866B (en) * 2016-06-20 2019-04-05 国家电网公司 Circuit breaker operation mechanism protective device with short message sending function
CN108761318A (en) * 2018-03-21 2018-11-06 北京四方继保自动化股份有限公司 A kind of intelligent double jump circle mimic-disconnecting switch
CN108761318B (en) * 2018-03-21 2021-04-30 北京四方继保自动化股份有限公司 Intelligent double-jumping-ring analog circuit breaker
CN109119964A (en) * 2018-10-29 2019-01-01 国网辽宁省电力有限公司沈阳供电公司 Prevent the intelligent controller of switch trip coil burnout
CN109119964B (en) * 2018-10-29 2023-12-05 国网辽宁省电力有限公司沈阳供电公司 Intelligent controller for preventing switch tripping coil from burning
CN113629873A (en) * 2021-08-16 2021-11-09 北京瑞凯软件科技开发有限公司 Contact net isolator monitoring unit based on IGBT realizes
CN113629873B (en) * 2021-08-16 2024-03-26 北京瑞凯软件科技开发有限公司 Contact net isolator monitoring unit based on IGBT is realized

Similar Documents

Publication Publication Date Title
CN201656420U (en) Three-phase auto reclosing electricity leakage protection switch
CN102005720B (en) Neutral line breakage detection protection method and device
CN102110971A (en) Intelligent protection controller for low-voltage distribution room
CN2290136Y (en) On-off coil protector for circuit braker
CN202616135U (en) Opening control loop of spring mechanism of 10kV vacuum circuit breaker
CN201576928U (en) Intelligent protection controller of low-pressure table region
CN112377475A (en) Automatic control system for pipeline groove
CN101060245A (en) Breaker coil protector
CN213981403U (en) Automatic control system for pipeline groove
CN104241014B (en) Vacuum circuit-breaker separating brake, closing coil protection controller and method
CN112290548A (en) Automatic switching-on and switching-off device of distribution transformer for agricultural distribution network alternating current ice melting
CN205900465U (en) Miniature circuit breaker
CN2290135Y (en) On-load voltage regulation mechanism protector for transformer
CN213782972U (en) High-voltage power distribution cabinet opening and closing monitoring circuit and system
CN217882955U (en) Dual-power automatic switching system of blast furnace equipment
CN219145010U (en) Circuit for preventing undervoltage protection misoperation of low-voltage frame type circuit breaker
CN203813426U (en) Tripping protector for circuit breaker
CN204179005U (en) Middle pressure vacuum circuit-breaker divides, closing coil protection controller
CN112327152B (en) FC switch on-off time testing and zero sequence protection setting system and method thereof
CN214410995U (en) Rail transit safety interlocking device
CN216134100U (en) Control system for circuit breaker to display real-time state on site
CN209471914U (en) A kind of novel tripping device
CN219322144U (en) Power supply circuit
CN210326996U (en) Improved switch-on/off controller of circuit breaker
CN211579684U (en) Automatic change-over switch for power supply

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee