CN2254926Y - Composed scaffold - Google Patents

Composed scaffold Download PDF

Info

Publication number
CN2254926Y
CN2254926Y CN 96217299 CN96217299U CN2254926Y CN 2254926 Y CN2254926 Y CN 2254926Y CN 96217299 CN96217299 CN 96217299 CN 96217299 U CN96217299 U CN 96217299U CN 2254926 Y CN2254926 Y CN 2254926Y
Authority
CN
China
Prior art keywords
steel
fork
steel pipe
base
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96217299
Other languages
Chinese (zh)
Inventor
周德龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 96217299 priority Critical patent/CN2254926Y/en
Application granted granted Critical
Publication of CN2254926Y publication Critical patent/CN2254926Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a combined scaffold for building engineering, which is an integral frame combined by a square matrix and a bottom frame, wherein, the square matrix is formed by splicing triangular steel frames. Each of the triangular steel frames is formed by fixedly connecting two horizontal steel elements with difficult lengths with two vertical steel pipes with difficult lengths. The steel pipes are respectively fixedly connected with bolt heads, and a base seat is formed by combining a steel element provided with a sleeve barrel with a spiral lifting device provided with a movable wheel. The utility model has the advantages of safe reliability, high stability, convenient assembly and disassembly, labor saving and time saving. The combined scaffold can be used for building engineering, and especially can be used for the inner decoration of advertisement propagandas, bridges, tunnels and halls, so that the advantages of flexibility and convenience can be shown.

Description

Assembly scaffold
The utility model belongs to the assembly scaffold that a kind of construction work is used.
At present, the construction work built generally adopts the scaffold of steel tube fastener formula.The scaffold of this steel tube fastener formula, built or folding frame are time-consuming.Especially when doing interior decorations such as advertising, bridge, tunnel, station, assembly hall, theater and need built, the frame hand frame of steel tube fastener formula more shows heaviness, the inferior position that operation is extremely inconvenient.Chinese patent discloses a kind of " construction work assembly scaffold " (application number 92242844.1).This utility model is provided with bearing between cross bar and scaffold floor, the both sides of scaffold floor have the locating hole that can insert U type card respectively, the side of vertical rod has bracing piece, there is the U-shaped clamp bottom of bracing piece, and the top of vertical rod inboard and bottom have loose pin and the fixed locating stud that can fix oblique bridging respectively.Although this utility model has easy advantage such as be suitable for, in constructions work,, just expose stable problem along with the increase of height.
The purpose of this utility model is to overcome above-mentioned weak point, and a kind of knockdown scaffold is provided.This assembly scaffold is the square square formation of many group triangle steelframes splicing and the general frame that base is united formation.
The utility model may reach by following measure:
Assembly scaffold is the square square formation of many group triangle steelframes splicing and the general frame that base is united formation.The triangle steelframe mainly is by horizontal two steel parts that are uneven in length and vertical two affixed forming of the steel pipe that is uneven in length.Steel pipe is affixed latch respectively, in long steel pipe fork down, fork is up in the short steel pipes.Fork exposes the size equity of steel pipe.
The base of assembly scaffold is to be combined by sleeved base steel part in two ends and spiral lift device.Wherein affixed latch, fork be up in the end sleeve.Fork equates with the internal diameter of steel pipe, sleeve.
Good effect and advantage that the utility model produces are:
1, assembly scaffold is the square square formation of many group triangle steelframes splicing and the general frame that base is united formation.During built, set base earlier, dock the triangle steel part then.On the insert edge of limit, quick, saving of work and time are increased work efficiency.Also extremely convenient during demolition.
2, be spliced into the square frame construction when the triangle steelframe, diagonal angle overlap joint horizontal brace pull bar, prevent the framework torsional deformation, strengthen mutual pulling force, safe and reliable, good stability.
3, knockdown scaffold not only is applied to building trade, but also can be applicable to the interior decoration of advertising, bridge tunnel, office building, auditoriums, hotels, these places more can demonstrate assembly scaffold flexibly, take the characteristics easily of rolling over.
Fig. 1, assembly scaffold framework schematic diagram
Fig. 2, assembly scaffold triangle steelframe schematic diagram
Fig. 3, assembly scaffold base steel part schematic diagram
Fig. 4, assembly scaffold base schematic diagram
Fig. 5, assembly scaffold horizontal brace pull bar schematic diagram
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Embodiment: assembly scaffold is the general frame that the square square formation that is spliced into by triangle steelframe (1) and base (3) are united formation.
Triangle steelframe (1) is by horizontal two steel parts that are uneven in length and vertical two affixed forming of the steel pipe that is uneven in length.Steel pipe is affixed fork (2) (2 ') respectively.Long steel pipe fork (2) down, short steel pipes fork (2 ') is up.
The base of assembly scaffold (3) is respectively to have the base steel part (6) of sleeve (5) (5 ') and spiral lift device to combine by two ends.Affixed fork (2 ") in the sleeve of base steel part (6) one ends wherein.(2 ") up for fork.
(2 ") and steel pipe, sleeve (5 ') internal diameter are identical for fork (2) (2 ').
During built, set base (3) earlier, the screw rod that is about to spiral lift device is socketed in the sleeve (5) (5 ') of steel part.Then, splicing triangle steelframe (1), the fork of long steel pipe (2) enter fork in sleeve (5), the sleeve (5 ") (2 ") and enter short steel pipes, another secondary triangle steelframe (1) is inverted is docked and then, form the rectangle steelframe, be spliced to form the square square formation according to this.Utilize spiral lift device, rotate its handle and adjust the framework level, make four jiaos of square square formations in a plane.Draw intensity mutually, square diagonal angle overlap joint horizontal brace pull bar (4) for what strengthen triangle steelframe (1).
The set of many group square square formation frameworks and the associating of base (3) just constitute assembly scaffold.Convenient for activity, the base (3) of assembly scaffold can be equipped with movable wheel in low idle job.

Claims (4)

1, a kind of assembly scaffold, be to combine by steel pipe, steel part.It is characterized in that: the mode of these steel pipes combination is the general frame that the square square formation that is spliced into triangle steelframe (1) and base (3) are united formation.
2, according to the described assembly scaffold of claim 1, it is characterized in that: triangle steelframe (1) is by horizontal two steel parts that are uneven in length and vertical two affixed forming of the steel pipe that is uneven in length; Steel pipe is affixed fork (2) (2 ') respectively, long steel pipe fork (2) down, short steel pipes fork (2 ') up, fork exposes the size equity of steel pipe.
3, according to the described assembly scaffold of claim 1, it is characterized in that: base (3) is to have the base steel part (6) of sleeve (5) (5 ') and spiral lift device (7) to combine by two ends, wherein in the sleeve (5) of base steel part (6) one ends affixed fork (2 "), (2 ") up for fork.(2 ") and steel pipe, sleeve (5 ') internal diameter are identical for fork (2) (2 ').
4, according to the described assembly scaffold of claim 1, it is characterized in that: four jiaos of square square formations that triangle steelframe (1) is spliced to form in a plane, diagonal angle overlap joint horizontal brace pull bar (4).
CN 96217299 1996-07-26 1996-07-26 Composed scaffold Expired - Fee Related CN2254926Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96217299 CN2254926Y (en) 1996-07-26 1996-07-26 Composed scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96217299 CN2254926Y (en) 1996-07-26 1996-07-26 Composed scaffold

Publications (1)

Publication Number Publication Date
CN2254926Y true CN2254926Y (en) 1997-05-28

Family

ID=33898500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96217299 Expired - Fee Related CN2254926Y (en) 1996-07-26 1996-07-26 Composed scaffold

Country Status (1)

Country Link
CN (1) CN2254926Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018655A (en) * 2014-06-17 2014-09-03 青岛大学 Component-based single supporting frame
CN104878916A (en) * 2015-06-25 2015-09-02 湖南省第六工程有限公司 Detachable simple four-wheel moving operating platform with building material lifting function

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018655A (en) * 2014-06-17 2014-09-03 青岛大学 Component-based single supporting frame
CN104018655B (en) * 2014-06-17 2016-08-24 青岛大学 A kind of assembly type monomer bracing frame
CN104878916A (en) * 2015-06-25 2015-09-02 湖南省第六工程有限公司 Detachable simple four-wheel moving operating platform with building material lifting function

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN110043019A (en) A kind of operating platform
CN112664040A (en) Disaster relief tent convenient to build fast
CN2254926Y (en) Composed scaffold
CN206737538U (en) A kind of half-phase passes through half bolted 750kV steel pipe lattice types framework
CN215055127U (en) Overhanging type scaffold I-steel and steel pipe connecting device
CN213476900U (en) Combined splayed support
CN212743445U (en) Movable telescopic folding shed frame
CN209855215U (en) Safe type combination formula scaffold frame
CN210002877U (en) Back ridge external corner active diagonal pulling device in aluminum alloy template system
CN206260406U (en) A kind of canopy film auxiliary installation device
CN206873987U (en) A kind of prefabricated house
CN211110760U (en) Underframe system convenient for wind power hoisting tower crane to transfer
CN215107147U (en) Portable working platform structure
CN212629360U (en) Photovoltaic green house
CN214423937U (en) Scaffold folding mechanism
CN210013140U (en) Fixed scaffold for bridge maintenance
CN213448130U (en) Cable body support frame
CN221070780U (en) Reinforcing structure for tower body height exceeding of tower crane
CN219528636U (en) Assembled guardrail for construction
CN213233795U (en) Universal connection's high-rise modularization nodal connection structure
CN210067624U (en) Environment-friendly impact-resistant construction protection fence
CN219794569U (en) Scaffold based on industry and civil construction
CN218234286U (en) Liftable split heads are built by laying bricks or stones to indoor elevator well partition wall
CN216360877U (en) Scaffold frame that building engineering was set up with being convenient for fast

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee