CN221277823U - Movable quick drainage device for tunnel excavation working face - Google Patents
Movable quick drainage device for tunnel excavation working face Download PDFInfo
- Publication number
- CN221277823U CN221277823U CN202323520579.8U CN202323520579U CN221277823U CN 221277823 U CN221277823 U CN 221277823U CN 202323520579 U CN202323520579 U CN 202323520579U CN 221277823 U CN221277823 U CN 221277823U
- Authority
- CN
- China
- Prior art keywords
- pipe
- water outlet
- outlet pipe
- water
- tunnel excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 104
- 239000003638 chemical reducing agent Substances 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 11
- 238000000034 method Methods 0.000 description 7
- 230000005611 electricity Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The movable rapid drainage device for the tunnel excavation working face comprises a water outlet pipe, wherein one side of the middle section of the water outlet pipe is communicated with an exhaust pipe, and the exhaust pipe is connected with exhaust equipment through an air pipe; one end of the water outlet pipe is connected with the water inlet pipe through a reducing joint, and the other end of the water outlet pipe is led to the water draining position through a calandria. The movable rapid drainage device for the tunnel excavation working face can realize rapid drainage of scattered accumulated water in the tunnel excavation working face area.
Description
Technical Field
The utility model relates to a drainage device, in particular to a movable rapid drainage device for a tunnel excavation working face.
Background
Along with the high-speed development of hydroelectric engineering, construction speed is faster and faster, but in tunnel excavation construction, because groundwater influences, a large amount of ponding often can appear in the construction section in tunnel excavation working face, consequently also higher and higher to the drainage requirement of excavation working face, traditional drainage mode mainly lays pumping pump drainage in excavation working face ponding department, but has following problem in the actual construction process:
1. The construction working surface has the advantages that the field is fluctuant, the ponding areas are scattered, the depth is different, the area is large, the water pump is required to be moved frequently, the power supply is disconnected, and the drainage efficiency is low;
2. The ponding is turbid, contains sand stone granule more, and the direct pump drainage of water pump takes place the water pump and blocks up easily, and is limited by water pump water inflow structure, and ponding easily flows back, and the drainage is not thorough, and ponding can't all be got rid of in the sump.
3. When the existing tunnel is drained, the water pump needs to be placed in the accumulated water for a long time, and because the water pump is limited by a construction space, a construction surface water pipe and an electric wire are intricate, and the water pump power supply cable is extremely easy to generate risks of damage, electric leakage, electric shock and the like;
4. The construction surface operation processes are more, cross operation is easy to occur, and interference is caused to key processes, so that the construction efficiency and the progress of the whole tunnel are affected.
Disclosure of Invention
The utility model aims to solve the technical problems of providing a movable rapid drainage device for a tunnel excavation working face, which is free from the need of arranging wires and electrical equipment on the excavation face for drainage, can effectively solve the construction problems of low drainage efficiency, backflow and incomplete drainage, safety in electricity consumption and interference in procedures in the process and the like, is small and exquisite and flexible, has strong mobility and high safety, and is suitable for rapid drainage of scattered ponding in the tunnel excavation working face area.
In order to solve the technical problems, the utility model adopts the following technical scheme:
The movable rapid drainage device for the tunnel excavation working face comprises a water outlet pipe, wherein one side of the middle section of the water outlet pipe is communicated with an exhaust pipe, and the exhaust pipe is connected with exhaust equipment through an air pipe; one end of the water outlet pipe is connected with the water inlet pipe through a reducing joint, and the other end of the water outlet pipe is led to the water draining position through a calandria.
The water outlet pipe, the exhaust pipe, the reducing joint and the water inlet pipe are all steel pipes.
And the bottom end of the water outlet pipe is welded with a bracket.
The diameter of one end of the reducer union, which is close to the water outlet pipe, is large, and the diameter of one end of the reducer union, which is close to the water inlet pipe, is small, and two ends of the reducer union are in threaded connection with the water outlet pipe and the water inlet pipe and are sealed.
The other end of the water inlet pipe is provided with a filter screen, and the end of the water inlet pipe is connected with the water inlet hose in a sealing way.
And a valve is arranged on the water inlet pipe.
And the exhaust pipe and the water outlet pipe keep a certain included angle.
The utility model discloses a movable rapid drainage device for a tunnel excavation working face, which has the following technical effects:
1) The siphon device comprising the water outlet pipe, the water inlet pipe, the exhaust pipe and the like directly performs exhaust by utilizing the exhaust system, and drainage is completed by exhaust, so that accumulated water on the working surface is safely and rapidly discharged without electricity.
2) The main body part (the water outlet pipe, the water inlet pipe and the exhaust pipe) of the device is small and exquisite, is convenient and fast to transfer, can not interfere other key processes, and ensures normal construction efficiency.
3) By arranging the filter screen, the blockage can be avoided; by arranging the ball valve, the ball valve can be closed in time in the later stage, and backflow can be prevented.
Drawings
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
Fig. 1 is a front view of the present utility model.
Fig. 2 is a right side view of the present utility model.
Fig. 3 is a left side view of the present utility model.
Fig. 4 is a schematic diagram of the operation of the present utility model.
In the figure: the device comprises a water outlet pipe 1, a reducer union 2, a water inlet pipe 3, an exhaust pipe 4, a calandria 5, a water inlet hose 6, an air pipe 7, a bracket 8, a valve 9 and a filter screen 10.
Detailed Description
As shown in figure 1, the movable rapid drainage device for the tunnel excavation working face mainly comprises a water outlet pipe 1, a reducer union 2, a water inlet pipe 3 and an exhaust pipe 4.
The water outlet end of the water outlet pipe 1 is sleeved with the calandria 5 and is in fastening connection in a hoop binding mode, and the other end of the calandria 5 is led to a designated water drainage position. The water inlet end of the water outlet pipe 1 is in threaded connection with the large-mouth end of the reducer union 2. The small opening end of the reducer union 2 is in threaded connection with the water outlet end of the water inlet pipe 3. A valve 9 is welded at the middle part of the water inlet pipe 3, and the valve 9 is a ball valve. The water inlet end of the water inlet pipe 3 is welded with a filter screen 10, and the filter screen 10 is used for filtering water to a certain degree when being used for draining water. The water inlet end of the water inlet pipe 3 is connected with a water draining hose 6 (rubber pipe) in a hoop binding mode, and the water draining hose 6 stretches into the water accumulation pit. In addition, the upper end of the water outlet pipe 1 is welded and communicated with an exhaust pipe 4, and the axis of the exhaust pipe 4 is intersected with the axis of the water outlet pipe 1 and the included angle of the two is 20 degrees. The other end of the exhaust pipe 4 is connected with an exhaust system through an air pipe 7.
The water outlet pipe 1, the exhaust pipe 4, the reducer union 2 and the water inlet pipe 3 are all steel pipes.
The bottom end of the water outlet pipe 1 is welded with a bracket 8. The support 8 may act as a support when the device is in use.
The diameter of one end of the reducer union 2 close to the water outlet pipe 1 is large, the diameter of one end of the reducer union 2 close to the water inlet pipe 3 is small, and two ends of the reducer union 2 are in threaded connection with the water outlet pipe 1 and the water inlet pipe 3. The diameter of the water outlet pipe is larger than that of the water inlet pipe, so that the cavity of the water outlet pipe 1 is larger than that of the water inlet pipe 3, and a negative pressure cavity is formed after air suction.
Working principle and process:
1) When draining on site, a proper position is selected from the accumulated water, the calandria 5 is connected with the assembled water outlet pipe 1, the water inlet hose 6 is connected with the water inlet pipe 3, and the air draft system is connected with the air draft tube 4 through the air pipe 7.
2) After the connection is completed, the support is fixed and supported by the support 8. Then the valve 9 is opened, the pipe mouth end of the water inlet hose 6 is placed into the accumulated water, and the outlet end of the calandria 5 is placed at a designated drainage place, such as a water collecting tank. The air suction is continued from the air duct 7. Negative pressure can be generated at the connecting cavity section of the water outlet pipe 1 and the water inlet pipe 3 in the air suction state, accumulated water is sucked into the device, sucked water is led out from the calandria 5, and the continuous and rapid water discharge function is realized in the continuous air suction state of the air suction pipe 4.
Claims (7)
1. The utility model provides a movable quick drainage device of tunnel excavation working face which characterized in that: comprises a water outlet pipe (1), wherein one side of the middle section of the water outlet pipe (1) is communicated with an exhaust pipe (4), and the exhaust pipe (4) is connected with exhaust equipment through an air pipe (7); one end of the water outlet pipe (1) is connected with the water inlet pipe (3) through the reducing joint (2), and the other end of the water outlet pipe (1) is led to the water draining position through the calandria (5).
2. The movable rapid drainage device for tunnel excavation working surfaces according to claim 1, wherein: the water outlet pipe (1), the exhaust pipe (4), the reducer union (2) and the water inlet pipe (3) are all steel pipes.
3. The movable rapid drainage device for tunnel excavation working surfaces according to claim 2, wherein: and a bracket (8) is welded at the bottom end of the water outlet pipe (1).
4. The movable rapid drainage device for tunnel excavation working surfaces according to claim 2, wherein: the diameter of one end of the variable-diameter joint (2) close to the water outlet pipe (1) is large, the diameter of one end of the variable-diameter joint close to the water inlet pipe (3) is small, and two ends of the variable-diameter joint (2) are in threaded connection with the water outlet pipe (1) and the water inlet pipe (3) and are sealed.
5. The movable rapid drainage device for tunnel excavation working surfaces according to claim 2, wherein: the other end of the water inlet pipe (3) is provided with a filter screen (10), and the end of the water inlet pipe (3) is connected with the water inlet hose (6) in a sealing way.
6. The movable rapid drainage device for tunnel excavation working surfaces according to claim 2, wherein: the water inlet pipe (3) is provided with a valve (9).
7. The movable rapid drainage device for tunnel excavation working surfaces according to claim 2, wherein: the exhaust pipe (4) and the water outlet pipe (1) keep a certain included angle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323520579.8U CN221277823U (en) | 2023-12-22 | 2023-12-22 | Movable quick drainage device for tunnel excavation working face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323520579.8U CN221277823U (en) | 2023-12-22 | 2023-12-22 | Movable quick drainage device for tunnel excavation working face |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221277823U true CN221277823U (en) | 2024-07-05 |
Family
ID=91702888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202323520579.8U Active CN221277823U (en) | 2023-12-22 | 2023-12-22 | Movable quick drainage device for tunnel excavation working face |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221277823U (en) |
-
2023
- 2023-12-22 CN CN202323520579.8U patent/CN221277823U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208618478U (en) | A kind of quick Accrete clearing device of hydraulic engineering with agitating function | |
CN207419575U (en) | A kind of silt displacement device of river reparation | |
CN206233286U (en) | Water conservancy construction Accrete clearing device | |
CN221277823U (en) | Movable quick drainage device for tunnel excavation working face | |
CN201003179Y (en) | Reservoir deposit mud discharging device | |
CN107503391A (en) | A kind of dredging device for water conservancy projects | |
CN112145228A (en) | Drainage method and drainage device in tunnel preliminary bracing construction | |
CN203427993U (en) | Siphon type water absorption device | |
CN207453076U (en) | Desilting equipment inside a kind of water pipeline | |
CN207862937U (en) | A kind of foundation surface of concrete dams and lift surface ponding remove device | |
CN216108848U (en) | A energy-conserving integration sewage pump station for crossing a river | |
CN2869143Y (en) | Combined desilting pond-digging machine set | |
CN207878635U (en) | A kind of tunnel base course drainage pipe dredger | |
CN207894070U (en) | A kind of energy-saving earth source heat pump | |
CN207795590U (en) | A kind of slush pump charging turbine | |
CN111255054A (en) | Automatic dredging device for sewer | |
CN207567934U (en) | A kind of urban pipe network mud suction process device | |
CN2818606Y (en) | Large pipeline dredging equipment | |
CN210800369U (en) | Main branch pipeline in pipeline | |
CN204961307U (en) | Hydraulic pressure sediment stuff pump | |
CN219118344U (en) | Sewage and rainwater lifting pump station | |
CN208363198U (en) | A kind of drain cleaner | |
CN219025269U (en) | Desilting device for preventing pipeline from being blocked | |
CN214653289U (en) | Top support device for forming branch pipe of super pipeline | |
CN219527661U (en) | Deep foundation pit mucky soil supporting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |