CN221150773U - Electric power engineering pipeline installation equipment - Google Patents

Electric power engineering pipeline installation equipment Download PDF

Info

Publication number
CN221150773U
CN221150773U CN202322784753.3U CN202322784753U CN221150773U CN 221150773 U CN221150773 U CN 221150773U CN 202322784753 U CN202322784753 U CN 202322784753U CN 221150773 U CN221150773 U CN 221150773U
Authority
CN
China
Prior art keywords
fixedly connected
platform
clamping assembly
power engineering
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322784753.3U
Other languages
Chinese (zh)
Inventor
冯潮刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322784753.3U priority Critical patent/CN221150773U/en
Application granted granted Critical
Publication of CN221150773U publication Critical patent/CN221150773U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses an electric power engineering pipeline installation device, which belongs to the technical field of electric power engineering, and comprises a supporting table, a placing table and a clamping assembly, wherein the placing table is arranged at the upper end of the supporting table, the clamping assembly is fixedly connected to the upper end of the placing table, the clamping assembly comprises a supporting frame, the supporting frame is fixedly connected to the upper surface of the placing table, and a first limiting clamp is fixedly connected to the upper surface of the placing table.

Description

Electric power engineering pipeline installation equipment
Technical Field
The utility model relates to the technical field of electric power engineering, in particular to electric power engineering pipeline installation equipment.
Background
With the continuous development of urban construction, construction of electric power facilities and laying of electric power lines are an indispensable and important project, and now, laying of lines on the ground is reduced, most of the lines are laid underground, and pipelines are required to be used for extending and laying of cables when underground lines are laid.
The problems of the prior art are: the pipeline laying process in the power engineering needs to be supported and limited by using the support, but most of the existing pipeline supports do not have the capability of moving and adjusting the height, pipelines are required to be erected at corresponding positions in the laying process, then the pipelines are supported and limited, and the construction process is complex, so that the power engineering pipeline installation equipment is specially provided for solving the problems.
Disclosure of utility model
Technical problem to be solved
Aiming at the defects of the prior art, the utility model aims to provide the electric power engineering pipeline installation equipment which has the characteristics of being convenient for adjusting the height of the device and simultaneously being convenient for limiting a pipeline.
Technical proposal
In order to achieve the above purpose, the utility model provides an electric power engineering pipeline installation device, which comprises a supporting table, a placing table and a clamping assembly, wherein the placing table is arranged at the upper end of the supporting table, the clamping assembly is fixedly connected to the upper end of the placing table, the clamping assembly comprises a supporting frame, the supporting frame is fixedly connected to the upper surface of the placing table, a first limiting clamp is fixedly connected to the upper surface of the placing table, a first bearing is arranged on the surface of the supporting frame in a penetrating manner, a first rotating shaft is arranged in the first bearing in a penetrating manner, a knob is fixedly connected to the upper end of the first rotating shaft, a first threaded column is fixedly connected to the lower end of the first rotating shaft, a first threaded pipe is connected to the other end of the first threaded column in a threaded manner, a second limiting clamp is fixedly connected to the lower end of the first threaded pipe, the positions of the first limiting clamps correspond to the positions of the second limiting clamps, and the clamping assembly is symmetrically arranged at the upper end of the placing table in two groups.
When using the electric power engineering pipeline installation equipment of this technical scheme, through setting up the centre gripping subassembly, when people need carry out the centre gripping to the pipeline, people at first with pipeline overlap joint in first spacing clamp upper end, then through rotating the knob to drive first screw thread post, under the cooperation of first screw thread post and first screwed pipe, made things convenient for people to adjust the position of second spacing clamp, after the centre gripping is accomplished to the second spacing clamp pipeline, people only need stop rotate the knob can, made things convenient for people to carry out the centre gripping to the pipeline.
Further, the upper surface fixedly connected with telescopic link of second limiting clamp, the upper end fixed connection of telescopic link is at the support frame inner wall, the telescopic link is two sets of altogether to the symmetry sets up in second limiting clamp upper end.
Further, the supporting bench upper surface fixedly connected with elevating platform, elevating platform inside fixedly connected with motor, the output shaft upper end fixedly connected with second screw thread post of motor, the upper end threaded connection of second screw thread post has the second screwed pipe, the upper end fixed connection of second screwed pipe is placing the bench lower surface.
Further, place platform lower surface fixedly connected with gag lever post, elevating platform side fixedly connected with spacing ring, the gag lever post wears to establish in the spacing ring, the lower extreme fixedly connected with stopper of gag lever post, gag lever post and spacing ring respectively have two sets of to the symmetry sets up in elevating platform both sides.
Further, the lower surface of the supporting table is fixedly connected with a wheel set, the side face of the wheel set is provided with brake pads, and the number of the wheel sets is four, and the wheel sets are arranged at the lower end of the supporting table in a rectangular mode.
Further, an energy storage bin is arranged in the supporting table, a storage battery is fixedly connected in the energy storage bin, and a control switch is fixedly connected to the front face of the lifting table.
Advantageous effects
In summary, the utility model has the following beneficial effects:
1. According to the electric power engineering pipeline installation equipment, when people need to clamp a pipeline, the people firstly lap joint the pipeline at the upper end of the first limiting clamp and then rotate the knob, so that the first threaded column is driven, the position of the second limiting clamp is conveniently adjusted by people under the cooperation of the first threaded column and the first threaded pipe, and after the second limiting clamp clamps the pipeline, the people only need to stop rotating the knob, so that the pipeline is conveniently clamped by people;
2. According to the electric power engineering pipeline installation equipment, by arranging the second threaded column and the second threaded pipe, when people need to adjust the height of the device, the people only need to control the motor to operate through the control switch, so that the second threaded column is driven to rotate, and under the cooperation of the second threaded column and the second threaded pipe, the height of a placing table with a clamping assembly carried by the device is conveniently adjusted by people, and the practicability of the device is improved;
3. This power engineering pipeline installation equipment, through setting up the wheel group, people at first promote the device, under the cooperation of wheel group, made things convenient for people to remove the device to the position that is fit for the device and use, when people need fix the device, people only need with the brake block adjustment that sets up in the wheel group side to the braking state can to guaranteed the device at the in-process that carries out normal operation, can keep stable operating condition.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings required for the description of the embodiments or the prior art will be briefly described, and it is apparent that the drawings in the following description are only one embodiment of the present utility model, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic elevational view in cross-section of the present utility model;
FIG. 2 is a schematic diagram of the front view of the present utility model;
FIG. 3 is a schematic cross-sectional view of a clamping assembly according to the present utility model.
The marks in the drawings are:
1. A support table; 2. a placement table; 3. a clamping assembly; 301. a support frame; 302. a first limit clip; 303. a first bearing; 304. a first rotating shaft; 305. a knob; 306. a first threaded post; 307. a first threaded pipe; 308. the second limiting clamp; 309. a telescopic rod; 4. a control switch; 5. a lifting table; 6. a motor; 7. a second threaded post; 8. a second threaded tube; 9. a limit rod; 10. a limiting ring; 11. a limiting block; 12. a wheel set; 13. a brake pad; 14. an energy storage bin; 15. and a storage battery.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the present utility model easy to understand, the technical solutions in the embodiments of the present utility model are clearly and completely described below to further illustrate the present utility model, and it is obvious that the described embodiments are only some embodiments of the present utility model, not all versions.
Examples:
The utility model is described in further detail below with reference to fig. 1-3.
Referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides an electric power engineering pipeline installation equipment, including supporting bench 1, place platform 2 and clamping assembly 3, place the platform 2 and set up in supporting bench 1 upper end, clamping assembly 3 fixed connection is placing platform 2 upper end, clamping assembly 3 includes support frame 301, support frame 301 fixed connection is placing platform 2 upper surface, place platform 2 upper surface fixedly connected with first spacing clamp 302, first bearing 303 is worn to be equipped with on the support frame 301 surface, wear to have first pivot 304 in the first bearing 303, the upper end fixedly connected with knob 305 of first pivot 304, the lower extreme fixedly connected with first screw thread post 306 of first pivot 304, the other end threaded connection of first screw thread post 306 has first screwed pipe 307, the lower extreme fixedly connected with second spacing clamp 308 of first screwed pipe 307, the position of first spacing clamp 302 corresponds with the position of second spacing clamp 308, clamping assembly 3 has two sets ofly to the symmetry sets up in placing platform 2 upper end.
Through adopting above-mentioned technical scheme, this electric power engineering pipeline installation equipment, through setting up clamping assembly 3, when people need carry out the centre gripping to the pipeline, people at first overlap joint at first spacing clamp 302 upper end with the pipeline, then through rotating knob 305 to drive first screw thread post 306, under the cooperation of first screw thread post 306 and first screwed pipe 307, made things convenient for people to adjust the position of second spacing clamp 308, after the centre gripping is accomplished to the pipeline to second spacing clamp 308, people only need stop rotate knob 305 can, made things convenient for people to carry out the centre gripping to the pipeline.
Specifically, the upper surface of the second limiting clamp 308 is fixedly connected with a telescopic rod 309, the upper end of the telescopic rod 309 is fixedly connected to the inner wall of the supporting frame 301, the telescopic rods 309 are two groups, and the telescopic rods are symmetrically arranged at the upper end of the second limiting clamp 308.
Specifically, the elevating platform 5 is fixedly connected with on the supporting bench 1, the inside fixedly connected with motor 6 of elevating platform 5, the output shaft upper end fixedly connected with second screw thread post 7 of motor 6, the upper end threaded connection of second screw thread post 7 has second screwed pipe 8, the upper end fixed connection of second screwed pipe 8 is placing the platform 2 lower surface.
Through adopting above-mentioned technical scheme, this power engineering pipeline installation equipment, through setting up second screw thread post 7 and second screwed pipe 8, when people need highly adjust the device, people only need through control switch 4 control motor 6 function to drive second screw thread post 7 and rotate, under the cooperation of second screw thread post 7 and second screwed pipe 8, made things convenient for people to carry the device to carry the height of placing the platform 2 of clamping assembly 3 to adjust, improved the practicality of the device.
Specifically, place platform 2 lower surface fixedly connected with gag lever post 9, elevating platform 5 side fixedly connected with spacing ring 10, gag lever post 9 wears to establish in spacing ring 10, and the lower extreme fixedly connected with stopper 11 of gag lever post 9, gag lever post 9 and spacing ring 10 respectively have two sets of to the symmetry sets up in elevating platform 5 both sides.
Specifically, the lower surface of the supporting table 1 is fixedly connected with a wheel set 12, the side surface of the wheel set 12 is provided with brake pads 13, and the wheel sets 12 are four in total and are arranged at the lower end of the supporting table 1 in a rectangular shape.
Through adopting above-mentioned technical scheme, this power engineering pipeline installation equipment, through setting up wheel group 12, people promote the device at first, under the cooperation of wheel group 12, made things convenient for people to remove the device to the position that is fit for the device and use, when people need fix the device, people only need with the brake block 13 adjustment that sets up in wheel group 12 side to the braking state can to guaranteed the device at the in-process that carries out normal operation, can keep stable operating condition.
Specifically, the energy storage bin 14 is arranged in the supporting table 1, the storage battery 15 is fixedly connected in the energy storage bin 14, and the control switch 4 is fixedly connected to the front surface of the lifting table 5.
The working principle of the utility model is as follows: when the device is used, people push the device at first, under the cooperation of the wheel set 12, people move the device to the position suitable for the device to use, when people need to fix the device, people only need to adjust the brake pad 13 arranged on the side face of the wheel set 12 to a braking state, thereby ensuring that the device can keep a stable working state in the normal operation process, when people need to adjust the height of the device, people only need to control the motor 6 to operate through the control switch 4, thereby driving the second threaded column 7 to rotate, under the cooperation of the second threaded column 7 and the second threaded pipe 8, people can conveniently adjust the height of the device carrying the holding table 2 of the holding assembly 3, the practicability of the device is improved, when people need to hold a pipeline, people firstly lap joint the upper end of the first limiting clamp 302, then through rotating the knob 305, thereby driving the first threaded column 306, under the cooperation of the first threaded column 306 and the first threaded pipe 307, the position of the second limiting clamp 308 is convenient for people to adjust the position of the second limiting clamp 308, and when the second threaded column 306 only need to stop holding the pipeline, namely, people can finish holding the pipeline by stopping the rotation of the knob 305.
The present embodiment is only for explanation of the present utility model and is not to be construed as limiting the present utility model, and modifications to the present embodiment, which may not creatively contribute to the present utility model as required by those skilled in the art after reading the present specification, are all protected by patent laws within the scope of claims of the present utility model.

Claims (6)

1. The utility model provides an electric power engineering pipeline installation equipment, includes brace table (1), places platform (2) and clamping assembly (3), its characterized in that: placing platform (2) set up in supporting bench (1) upper end, clamping assembly (3) fixed connection is placing platform (2) upper end, clamping assembly (3) include support frame (301), support frame (301) fixed connection is placing platform (2) upper surface, place platform (2) upper surface fixedly connected with first spacing clamp (302), first bearing (303) are worn to be equipped with on support frame (301) surface, wear to be equipped with first pivot (304) in first bearing (303), the upper end fixedly connected with knob (305) of first pivot (304), the lower extreme fixedly connected with first screwed column (306) of first pivot (304), the other end screwed connection of first screwed column (306) has first screwed pipe (307), the lower extreme fixedly connected with second spacing clamp (308) of first screwed pipe (307), the position of first spacing clamp (302) corresponds with the position of second spacing clamp (308), clamping assembly (3) have altogether to be set up on two sets of symmetry of platform (2).
2. An electrical engineering pipe installation apparatus according to claim 1, wherein: the upper surface of the second limiting clamp (308) is fixedly connected with a telescopic rod (309), the upper end of the telescopic rod (309) is fixedly connected to the inner wall of the supporting frame (301), the telescopic rods (309) are two groups in total, and the telescopic rods are symmetrically arranged at the upper end of the second limiting clamp (308).
3. An electrical engineering pipe installation apparatus according to claim 1, wherein: the supporting bench is characterized in that the upper surface of the supporting bench (1) is fixedly connected with a lifting table (5), a motor (6) is fixedly connected inside the lifting table (5), a second threaded column (7) is fixedly connected to the upper end of an output shaft of the motor (6), a second threaded pipe (8) is connected to the upper end of the second threaded column (7) in a threaded mode, and the upper end of the second threaded pipe (8) is fixedly connected to the lower surface of the placing table (2).
4. A power engineering pipe installation apparatus according to claim 3, wherein: place table (2) lower surface fixedly connected with gag lever post (9), elevating platform (5) side fixedly connected with spacing ring (10), gag lever post (9) wear to establish in spacing ring (10), the lower extreme fixedly connected with stopper (11) of gag lever post (9), gag lever post (9) and spacing ring (10) respectively have two sets of to the symmetry sets up in elevating platform (5) both sides.
5. An electrical engineering pipe installation apparatus according to claim 1, wherein: the wheel set (12) is fixedly connected to the lower surface of the supporting table (1), the side face of the wheel set (12) is provided with brake pads (13), and the number of the wheel sets (12) is four, and the wheel sets are arranged at the lower end of the supporting table (1) in a rectangular mode.
6. A power engineering pipe installation apparatus according to claim 3, wherein: the energy storage bin (14) is arranged in the supporting table (1), a storage battery (15) is fixedly connected in the energy storage bin (14), and a control switch (4) is fixedly connected to the front face of the lifting table (5).
CN202322784753.3U 2023-10-17 2023-10-17 Electric power engineering pipeline installation equipment Active CN221150773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322784753.3U CN221150773U (en) 2023-10-17 2023-10-17 Electric power engineering pipeline installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322784753.3U CN221150773U (en) 2023-10-17 2023-10-17 Electric power engineering pipeline installation equipment

Publications (1)

Publication Number Publication Date
CN221150773U true CN221150773U (en) 2024-06-14

Family

ID=91389545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322784753.3U Active CN221150773U (en) 2023-10-17 2023-10-17 Electric power engineering pipeline installation equipment

Country Status (1)

Country Link
CN (1) CN221150773U (en)

Similar Documents

Publication Publication Date Title
CN213018094U (en) Municipal administration is pipeline locating support for water supply and drainage engineering
CN213575934U (en) Pipeline supporting assembly
CN212218114U (en) Pipeline rust cleaning device for hydraulic engineering
CN212311398U (en) Pipeline cutting device for hydraulic engineering convenient to use
CN221150773U (en) Electric power engineering pipeline installation equipment
CN210587405U (en) Bellows fixed length automatic cutout machine
CN211621677U (en) Underground pipe gallery formwork construction structure
CN209145308U (en) A kind of light aggregate building block clamping device
CN204886820U (en) Fixed inclination photovoltaic support device that circular arc is adjustable
CN206748275U (en) A kind of tubing detection fixed equipment of the realm of building construction
CN110224664B (en) Photovoltaic support capable of being doubly fixed and positioned
CN211475089U (en) Pipeline strutting arrangement for municipal construction
CN221188630U (en) Pipeline transportation device for road engineering
CN213034756U (en) High-stability fixing device for plastic pipeline machining
CN220435631U (en) Pipeline supporting structure
CN214618188U (en) Strutting arrangement is used in water supply and drainage pipe construction
CN215318220U (en) Water pipeline overhauls management device
CN220686685U (en) Concrete pouring's operation rack
CN218780849U (en) Culvert pipe moving device for municipal pipeline laying
CN215518479U (en) Municipal works road warning device
CN214870083U (en) Temporary pipeline supporting device during butt joint of gas pipelines
CN214251148U (en) Flowmeter fixed bolster
CN221186412U (en) Municipal works pipeline clamping frame
CN220421292U (en) Construction device for building electrical engineering pipeline
CN218324205U (en) Electric pole correcting device for power engineering