CN221075528U - Novel mounting structure of PPR pipeline bracket - Google Patents

Novel mounting structure of PPR pipeline bracket Download PDF

Info

Publication number
CN221075528U
CN221075528U CN202323188246.XU CN202323188246U CN221075528U CN 221075528 U CN221075528 U CN 221075528U CN 202323188246 U CN202323188246 U CN 202323188246U CN 221075528 U CN221075528 U CN 221075528U
Authority
CN
China
Prior art keywords
pipe
top plate
plate
ppr
ppr pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323188246.XU
Other languages
Chinese (zh)
Inventor
余婷然
安彬
王重
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electronics System Engineering No3 Construction Co ltd
Original Assignee
China Electronics System Engineering No3 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electronics System Engineering No3 Construction Co ltd filed Critical China Electronics System Engineering No3 Construction Co ltd
Priority to CN202323188246.XU priority Critical patent/CN221075528U/en
Application granted granted Critical
Publication of CN221075528U publication Critical patent/CN221075528U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a novel installing structure of a PPR pipeline bracket, and particularly relates to the field of PPR pipeline brackets, which comprises an installing plate, a supporting plate, a top plate, angle irons, pipe clamps, locking caps, a pipe body and through holes, wherein the supporting plate is vertically welded on one side of the installing plate, the top end of the supporting plate is welded with the top plate, the angle irons are welded on the top plate, the pipe clamps are sleeved on the angle irons, the bottom ends of the pipe clamps are connected with the top plate, the pipe body is clamped between the pipe clamps and the angle irons, the through holes are formed in the top plate, the two ends of the pipe clamps are in splicing fit with the corresponding through holes, the locking caps are sleeved at the two ends of the pipe clamps, and the installing plate, the supporting plate and the top plate form a fixing bracket. The utility model not only improves the integrity and the aesthetic property of the on-site PPR pipeline installation, avoids the deformation of the pipeline, but also can save the labor and the material cost.

Description

Novel mounting structure of PPR pipeline bracket
Technical Field
The utility model belongs to the technical field of PPR pipeline brackets, and particularly relates to a novel installation structure of a PPR pipeline bracket.
Background
The PPR pipe is widely applied to a building water supply and drainage system, and according to the specification and actual use, the PPR pipe is found: the pipe belongs to the flexible pipe, and it is great that it receives ambient temperature to influence, lays PPR tubular product and need a large amount of gallows to satisfy its bearing and the demand of restriction, if use traditional mounting means, the circumstances of serious deformation appear more, especially little pipe diameter tubular product influences PPR pipeline's construction quality and aesthetic property.
The utility model patent of patent application publication number CN218625767U discloses a pipeline anti-seismic support structure convenient to install, which comprises a U-shaped frame, wherein two sliding grooves are vertically formed in the upper surface of the U-shaped frame, through holes are formed in the left side wall and the right side wall of the U-shaped frame, sliding rods are inserted in the through holes in a sliding manner, a first trapezoid block and an installation block are respectively fixedly installed at two ends of each sliding rod, and a telescopic spring is sleeved on each sliding rod; the U-shaped frame is characterized in that a supporting block is fixedly arranged on the inner bottom wall of the U-shaped frame, a combined anchor ear is arranged above the supporting block, mounting plates are fixedly arranged on the left side wall and the right side wall of the upper anchor ear through a plurality of rectangular connecting rods, and a second trapezoid block is fixedly arranged on the surface of each mounting plate. The U-shaped frame and the combined anchor ear can be quickly assembled and disassembled through the cooperation between the first trapezoidal block and the second trapezoidal block, so that the assembly and disassembly are convenient and quick, the complicated step of using screw and nut fixing pieces is avoided, and the working efficiency of assembling and disassembling the combined anchor ear is improved.
However, when the structure is actually used, firstly, the parts in the structure are more, the whole structure is more complicated, so that the cost is higher, and meanwhile, when the pipeline is clamped, the complicated step of using screw and nut fixing pieces is avoided, the working efficiency of the assembly and disassembly combined anchor ear is improved, but the traditional mode of fixing the pipeline is still adopted, so that the condition that the pipeline is deformed still exists, and therefore, the novel installing structure of the PPR pipeline bracket is provided.
Disclosure of utility model
The technical scheme of the utility model aims at solving the technical problem of overlarge singleness in the prior art and provides a solution which is obviously different from the prior art. The utility model provides a novel installation structure of a PPR pipeline bracket, and aims to solve the problems.
The utility model is realized in such a way that the utility model provides the following technical scheme: the utility model provides a novel mounting structure of PPR pipeline support, includes mounting panel, backup pad, roof, angle bar, pipe strap, locking cap, body and through-hole, mounting panel one side vertical welding has the backup pad, backup pad top welding has the roof, the welding has the angle bar on the roof, cup jointed the pipe strap on the angle bar, the pipe strap bottom is connected with the roof, the body has been held to the clamp between pipe strap and the angle bar, the through-hole has been seted up on the roof, and the cooperation of pegging graft of pipe strap both ends and corresponding through-hole, and the locking cap has been cup jointed at pipe strap both ends.
Preferably, the mounting plate, the support plate and the top plate form a fixing bracket.
Preferably, transverse grooves are symmetrically formed in the top end of the top plate, the two transverse grooves are symmetrically formed in two sides of the welded angle iron, and two ends of the pipe clamp are respectively inserted into the corresponding transverse grooves.
Preferably, the angle iron is in compression joint on the roof, and the symmetrical welding of angle iron bottom has the bolt, and has seted up the key hole on the roof that corresponds.
Preferably, an adjusting groove is formed in the top plate, and two ends of the pipe clamp and the two bolt rods are inserted into the adjusting groove.
Compared with the prior art, the utility model has the beneficial effects that:
The novel installation structure of the PPR pipeline bracket not only improves the integrity and the attractiveness of on-site PPR pipeline installation, avoids the deformation of the pipeline, but also can save labor and material cost.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present utility model.
FIG. 2 is a schematic diagram of the fitting structure of the pipe clamp and angle iron of the present utility model.
Fig. 3 is a schematic structural view of the fixing bracket of the present utility model.
In the figure: 1. a mounting plate; 2. a support plate; 3. a top plate; 4. angle iron; 5. a pipe clamp; 6. a locking cap; 7. a tube body; 8. and a through hole.
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
Example 1
The novel mounting structure of PPR pipeline support as shown in the accompanying drawings 1-3 comprises a mounting plate 1, a supporting plate 2, a top plate 3, angle irons 4, pipe clamps 5, locking caps 6, pipe bodies 7 and through holes 8, wherein the supporting plate 2 is welded on one side of the mounting plate 1 vertically, the top plate 3 is welded on the top end of the supporting plate 2, the angle irons 4 are welded on the top plate 3, the pipe clamps 5 are sleeved on the angle irons 4, the bottom ends of the pipe clamps 5 are connected with the top plate 3, the pipe bodies 7 are clamped between the pipe clamps 5 and the angle irons 4, the through holes 8 are formed in the top plate 3, the two ends of the pipe clamps 5 are in splicing fit with the corresponding through holes 8, the locking caps 6 are sleeved on the two ends of the pipe clamps 5, and the mounting plate 1, the supporting plate 2 and the top plate 3 form a fixing support.
The angle iron 4 welded on the fixed support is used for supporting the pipe body 7, the pipe body 7 is a phi 40PPR water supply pipe, the pipe body is pressed on the angle iron 4 in the laying process, then the pipe clamp 5 is sleeved, the pipe clamp 5 is inserted into the two through holes 8, the pipe clamp 5 is fixed through the locking cap 6, the pipe body 7 is fixed between the angle iron 4 and the pipe clamp 5, the angle iron 4 and the pipe clamp 5 are used for supporting and limiting, the angle iron 4 is fixed by the fixed support to achieve the purpose of bearing and limiting pipelines, deformation of the pipelines is avoided, the integrity and the attractiveness of on-site PPR pipeline installation are improved, the on-site laying is used as an example, the phi 40PPR water supply pipe with the length of 60 meters is laid, and the material cost of the traditional construction method is about 3000 yuan, and 12 workers are needed. The material cost of the novel construction structure is about 2500 yuan, and 5 workers are needed, so that the installation structure is utilized, the material cost can be saved, and the manual use amount can be reduced.
Example 2
The novel mounting structure of PPR pipeline support as shown in the accompanying drawings 1-3 comprises a mounting plate 1, a supporting plate 2, a top plate 3, angle irons 4, pipe clamps 5, locking caps 6 and a pipe body 7, wherein the supporting plate 2 is welded on one side of the mounting plate 1 vertically, the top plate 3 is welded on the top end of the supporting plate 2, the angle irons 4 are welded on the top plate 3, the pipe clamps 5 are sleeved on the angle irons 4, the bottom ends of the pipe clamps 5 are connected with the top plate 3, the pipe body 7 is clamped between the pipe clamps 5 and the angle irons 4, transverse grooves are symmetrically formed in the top end of the top plate 3, two transverse grooves are symmetrically formed in two sides of the welded angle irons 4, two ends of the pipe clamps 5 are respectively spliced in the corresponding transverse grooves, the locking caps 6 are sleeved on two ends of the pipe clamps 5, and the mounting plate 1, the supporting plate 2 and the top plate 3 form a fixing support.
The pipe body 7 is supported by the angle iron 4 welded on the fixed support, the pipe body 7 is a phi 40PPR water supply pipe, the pipe body is in compression joint on the angle iron 4 in the laying process, then the pipe clamp 5 is sleeved, the pipe clamp 5 is spliced on two transverse grooves, the position of the pipe clamp 5 is properly adjusted according to the diameter of a pipeline, the application range of clamping the pipeline is improved, the pipe clamp 5 is fixed by the locking cap 6, the pipe body 7 is fixed between the angle iron 4 and the pipe clamp 5, the angle iron 4 and the pipe clamp 5 are used for supporting and limiting, the angle iron 4 is fixed by the fixed support to achieve the purpose of bearing and limiting the pipeline, the pipeline is prevented from deforming, the installation integrity and the attractiveness of the on-site PPR pipeline are improved, the on-site laying is carried out for example, the phi 40PPR water supply pipe with the length of 60 meters is laid, and the material cost of the traditional construction method is about 3000 yuan, and 12 traditional construction methods are needed. The cost of the novel construction structure material is about 2500 yuan, and 5 workers are needed, but the time is slightly shortened relative to that in the embodiment 1, so that the installation structure is utilized, the material cost can be saved, and the labor use amount can be reduced.
Example 3
The novel mounting structure of PPR pipeline support as shown in the accompanying drawings 1-3 comprises a mounting plate 1, a supporting plate 2, a top plate 3, angle irons 4, pipe clamps 5, locking caps 6, pipe bodies 7 and through holes 8, wherein the supporting plate 2 is welded on one side of the mounting plate 1 vertically, the top plate 3 is welded on the top end of the supporting plate 2, the angle irons 4 are pressed on the top plate 3, bolt rods are symmetrically welded at the bottom ends of the angle irons 4, bolt holes are formed in the corresponding top plate 3, the pipe clamps 5 are sleeved on the angle irons 4, the bottom ends of the pipe clamps 5 are connected with the top plate 3, the pipe bodies 7 are clamped between the pipe clamps 5 and the angle irons 4, the through holes 8 are formed in the top plate 3, two ends of the pipe clamps 5 are in splicing fit with the corresponding through holes 8, the locking caps 6 are sleeved at two ends of the pipe clamps 5, and the mounting plate 1, the supporting plate 2 and the top plate 3 form a fixing support.
The angle iron 4 welded on the fixed support is used for supporting the pipe body 7, the pipe body 7 is a phi 40PPR water supply pipe, the pipe body 7 is pressed on the angle iron 4 in the laying process, the pipe body 7 is arranged at the height through the pipe body 7, the bottom of the pipe body 7 can be supported through the lifting bolt rod, the bottom of the angle iron 4 is sleeved on the bolt rod through the bolt cap in a screwing mode, the top plate 3 is clamped, the position of the angle iron 4 is fixed, then the pipe clamp 5 is sleeved on the pipe clamp 5, the pipe clamp 5 is inserted on the two through holes 8, the pipe clamp 5 is fixed through the locking cap 6, the pipe body 7 is fixed between the angle iron 4 and the pipe clamp 5, the angle iron 4 and the pipe clamp 5 are used for supporting and limiting, the angle iron 4 is fixed through the fixed support to achieve the purpose of bearing and limiting the pipe line, the deformation of the pipe line is avoided, the integrity and the aesthetic property of the on-site PPR pipe line installation are improved, the on-site laying of 60 m long phi 40PPR pipe is laid by taking the on the site laying example, the material cost of the traditional construction method is about 3000 yuan, and 12 water supply pipes are needed. The material cost of the novel construction structure is about 2600 yuan, and 6 workers are needed, so that the installation structure is utilized, the material cost can be saved, and the manual use amount can be reduced.
Example 4
The novel mounting structure of PPR pipeline support as shown in the accompanying drawings 1-3 comprises a mounting plate 1, a supporting plate 2, a top plate 3, angle irons 4, pipe clamps 5, locking caps 6 and a pipe body 7, wherein one side of the mounting plate 1 is perpendicularly welded with the supporting plate 2, the top end of the supporting plate 2 is welded with the top plate 3, the angle irons 4 are in press connection with the top plate 3, the bottom ends of the angle irons 4 are symmetrically welded with bolt rods, the corresponding top plate 3 is provided with bolt holes, the angle irons 4 are sleeved with the pipe clamps 5, the bottom ends of the pipe clamps 5 are connected with the top plate 3, the pipe body 7 is clamped between the pipe clamps 5 and the angle irons 4, the top plate 3 is provided with an adjusting groove, two ends of the pipe clamps 5 and two bolt rods are respectively inserted into the adjusting groove, the two ends of the pipe clamps 5 are sleeved with the locking caps 6, and the mounting plate 1, the supporting plate 2 and the top plate 3 form a fixing support.
The angle iron 4 welded on the fixed support is used for supporting the pipe body 7, the pipe body 7 is a phi 40PPR water supply pipe, the pipe body 7 is in compression joint on the angle iron 4 in the laying process, the pipe body 7 is fixed between the angle iron 4 and the pipe clamp 5 through the height of the pipe body 7, the bottom of the pipe body 7 is supported through the lifting bolt rod, the angle iron 4 is sleeved on the bolt rod through the bolt cap in a rotating mode, the top plate 3 is clamped, the position of the angle iron 4 is fixed, then the pipe clamp 5 is sleeved on the adjusting groove in a sleeving mode, the pipe clamp 5 is spliced on the adjusting groove, the position of the pipe clamp 5 is properly adjusted according to the diameter of a pipeline, the application range of pipe clamp is improved, meanwhile, the pipe clamp 5 is also properly adjusted according to the laying route of the pipe body 7, the pipe clamp 5 is fixed through the locking cap 6, the pipe body 7 is fixed between the angle iron 4 and the pipe clamp 5, the pipe clamp 5 is supported and limited by the angle iron 4, the fixed support is used for achieving the purposes of limiting the pipeline through the fixed support, deformation of the angle iron 4 is avoided, the installation integrity and the attractiveness of the on the site is improved, the site PPR pipeline is paved, the application cost is about 3000 PPR is about 40PPR, and the traditional water supply pipe laying method is about 12 m, and the cost is about 40 PPR. The material cost of the novel construction structure is about 2600 yuan, and 4 workers are needed, so that the installation structure is utilized, the material cost can be saved, and the manual use amount can be reduced.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (5)

1. Novel mounting structure of PPR pipeline support, including mounting panel, backup pad, roof, angle bar, pipe strap, locking cap, body and through-hole, its characterized in that: the utility model discloses a pipe clamp, including mounting panel, angle bar, mounting panel one side vertical welding has the backup pad, the welding of backup pad top has the roof, the welding has the angle bar on the roof, cup jointed the pipe strap on the angle bar, the pipe strap bottom is connected with the roof, it holds the body to press from both sides between pipe strap and the angle bar, the through-hole has been seted up on the roof, and the pipe strap both ends are pegged graft the cooperation with corresponding through-hole, and the locking cap has been cup jointed at the pipe strap both ends.
2. The novel installation structure of the PPR pipeline bracket according to claim 1, wherein: the mounting plate, the support plate and the top plate form a fixed bracket.
3. The novel installation structure of the PPR pipeline bracket according to claim 1, wherein: transverse grooves are symmetrically formed in the top end of the top plate, the two transverse grooves are symmetrically formed in two sides of the welded angle iron, and two ends of the pipe clamp are respectively inserted into the corresponding transverse grooves.
4. The novel installation structure of the PPR pipeline bracket according to claim 1, wherein: the angle iron is in compression joint on the top plate, the bottom end of the angle iron is symmetrically welded with a bolt rod, and a bolt hole is formed in the corresponding top plate.
5. The novel installation structure of the PPR pipeline bracket according to claim 1, wherein: an adjusting groove is formed in the top plate, and two ends of the pipe clamp and two bolt rods are inserted into the adjusting groove.
CN202323188246.XU 2023-11-25 2023-11-25 Novel mounting structure of PPR pipeline bracket Active CN221075528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323188246.XU CN221075528U (en) 2023-11-25 2023-11-25 Novel mounting structure of PPR pipeline bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323188246.XU CN221075528U (en) 2023-11-25 2023-11-25 Novel mounting structure of PPR pipeline bracket

Publications (1)

Publication Number Publication Date
CN221075528U true CN221075528U (en) 2024-06-04

Family

ID=91252342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323188246.XU Active CN221075528U (en) 2023-11-25 2023-11-25 Novel mounting structure of PPR pipeline bracket

Country Status (1)

Country Link
CN (1) CN221075528U (en)

Similar Documents

Publication Publication Date Title
CN201459932U (en) Roofing round tube purline adjustable connecting device
CN221075528U (en) Novel mounting structure of PPR pipeline bracket
CN201764119U (en) Lining plastic steel pipe fixing device
CN218719276U (en) Tool type C-shaped comprehensive support hanger tool for steel structure factory building
CN206233264U (en) For the rear-mounted adjustable support of piping lane
CN112648438A (en) Pipeline support and construction method applied to pipeline support
CN215055903U (en) Power transmission tower reinforcing device
CN212613309U (en) Pull rod fixing component for mounting and fixing light steel keel
CN212900100U (en) Double-barrelled conduit saddle is at concrete wall body erection joint structure
CN113623462A (en) Comprehensive pipe gallery gas pipeline fixing device and method
CN210950174U (en) Buried pipe fixing device convenient to adjust
CN220247183U (en) I-steel stand electromechanical device and pipeline installing support
CN116613694B (en) Underground pipe gallery support system and construction method
CN212508995U (en) High-altitude fan saddle plate mounting bracket
CN201003239Y (en) Assembled type triangle transversal surface sunlight greenhouse arched girder
CN220521768U (en) FRP roofing adjustable installation skeleton
CN217402029U (en) Mechanical cross joint suitable for pitched roof
CN214699481U (en) Pipeline support
CN219157946U (en) Assembled steel construction convenient to angle regulation when installation
CN219431005U (en) Cable-stayed bracket in large-span steel structure
CN215933810U (en) Holding pole mounting device for mounting communication antenna
CN221221709U (en) Novel adjustable movable support
CN214618175U (en) Adjustable anti-seismic support
CN221054430U (en) Support frame convenient to pipeline quick positioning
CN215763697U (en) Pipeline suspension structure for municipal engineering piping lane construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant