CN221031331U - Construction engineering is with climbing frame - Google Patents

Construction engineering is with climbing frame Download PDF

Info

Publication number
CN221031331U
CN221031331U CN202322765030.9U CN202322765030U CN221031331U CN 221031331 U CN221031331 U CN 221031331U CN 202322765030 U CN202322765030 U CN 202322765030U CN 221031331 U CN221031331 U CN 221031331U
Authority
CN
China
Prior art keywords
fixedly connected
fixed
climbing frame
block
construction engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322765030.9U
Other languages
Chinese (zh)
Inventor
刘文军
郭子豪
郑玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zehui Construction Engineering Co ltd
Original Assignee
Anhui Zehui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zehui Construction Engineering Co ltd filed Critical Anhui Zehui Construction Engineering Co ltd
Priority to CN202322765030.9U priority Critical patent/CN221031331U/en
Application granted granted Critical
Publication of CN221031331U publication Critical patent/CN221031331U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to the technical field of construction engineering, and discloses a climbing frame for construction engineering, which comprises a climbing frame mechanism and further comprises: the side face of the climbing frame mechanism is movably connected with the forehead face of the splicing mechanism, the side face of the climbing frame mechanism is fixedly connected with the side face of the fixing mechanism, the climbing frame mechanism comprises a stand column, the top end of the stand column is fixedly connected with a connecting block, and the splicing mechanism comprises a mounting sleeve; according to the utility model, the proper number of climbing frame mechanisms and splicing mechanisms are selected according to the use requirement, in the installation process, the connecting blocks at the two ends of the upright post are inserted into the installation sleeve and fixed, the spliced installation of the upright post is completed, the spliced upright post is kept at a proper height, the workbench is inserted into the supporting block and fixed through the fixing mechanism, the climbing frame is used, constructors stand on the workbench for construction, the occupied space is reduced, the convenience in transportation is facilitated, and meanwhile, the disassembly and the installation are convenient.

Description

Construction engineering is with climbing frame
Technical Field
The utility model relates to the technical field of construction engineering, in particular to a climbing frame for construction engineering.
Background
The climbing frame is also called a lifting frame, is a novel scaffold system which is developed, is composed of a plurality of part structures such as a supporting frame, a tripod and a supporting panel, has the characteristics of no height limitation, labor saving, material saving, safety and the like, can be divided into a hydraulic type, an electric type, a manpower hand-pulled type and the like according to the power source, is mainly applied to high-rise shear wall type building plates, can ascend or descend along a building, and has development advantages in high-rise buildings.
The prior art is not enough: the current frame that climbs is assembled fixedly to each part of frame that climbs through the bolt in the installation more, along with using the screw thread to appear corrosion easily on the bolt, inconvenient dismantlement, and can't be according to the user demand to the whole height of climbing the frame adjust, waste time and energy when the installation is dismantled, greatly reduced work efficiency.
Disclosure of utility model
In order to overcome the above-mentioned drawbacks of the prior art, the present utility model provides a climbing frame for construction engineering, so as to solve the above-mentioned problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction engineering is with climbing frame, includes climbing frame mechanism, still includes: the utility model provides a splice mechanism and fixed establishment, climb the side of frame mechanism and splice mechanism's frontal face swing joint, climb the side of frame mechanism and fixed establishment's side fixed connection, climb the frame mechanism and include the stand, the top fixedly connected with connecting block of stand, splice mechanism includes the installation cover, the side inner wall of installation cover and the side swing joint of connecting block, fixed establishment includes the supporting shoe, the side of supporting shoe and the side fixed connection of stand, the side fixedly connected with bottom plate of stand, the side inner wall swing joint of supporting shoe has the workstation, anti-skidding wire casing has been seted up on the top of workstation.
Further, the second mounting hole has been seted up to the side inner wall of installation cover, the side fixedly connected with reset spring of second mounting hole, reset spring's side fixedly connected with fixed pin, the inclined plane has been seted up to the side of fixed pin, the fixed hole has been seted up to the position that the side of connecting block corresponds the fixed pin.
Further, a first mounting hole is formed in the side face of the second mounting hole, an electromagnet is fixedly connected to the side face of the first mounting hole, a connecting pipe is fixedly connected to the side face of the fixing pin, and a magnet is fixedly connected to the side face of the connecting pipe.
Further, the side fixedly connected with mounting pin of stand, the side swing joint of mounting pin has rotatory piece, rotatory piece is L type structure, the side inner wall of rotatory piece and the side swing joint of workstation.
Further, the side fixedly connected with lower fixed block of bottom plate, the side of rotatory piece corresponds the fixed block's of lower fixed block position fixedly connected with and goes up the fixed block, the mounting groove has been seted up to the side of fixed block down, the side of mounting groove has the rotary rod through round pin swing joint, the top fixedly connected with compression spring of rotary rod, compression spring's bottom fixedly connected with fixture block, the side inner wall of fixture block and the side swing joint of rotary rod, the draw-in groove has been seted up to the top of going up the fixed block and corresponding the position of fixture block.
Further, the fixture block is spherical structure, the bottom of fixture block and the bottom of draw-in groove are all fixedly connected with slipmat.
Further, the fixing pins are symmetrically distributed along the central line of the mounting sleeve.
The utility model has the technical effects and advantages that:
1. According to the utility model, the proper number of climbing frame mechanisms and splicing mechanisms are selected according to the use requirement, in the installation process, the connecting blocks at the two ends of the upright post are inserted into the installation sleeve and fixed, the spliced installation of the upright post is completed, the spliced upright post is kept at a proper height, the workbench is inserted into the supporting block and fixed through the fixing mechanism, the climbing frame is used, constructors stand on the workbench for construction, the occupied space is reduced, the convenience in transportation is facilitated, and meanwhile, the disassembly and the installation are convenient.
2. According to the utility model, when the bottom end of the connecting block is inserted into the inner wall of the mounting sleeve, the bottom end of the connecting block is contacted with the inclined surface of the side surface of the fixed pin, the fixed pin is pushed to be retracted into the second mounting hole, when the connecting block is completely inserted into the mounting sleeve, the fixed pin is pushed to be inserted into the fixed hole of the side surface of the connecting block by the reset spring, the mounting sleeve and the stand column are fixed, the electromagnet is electrified to generate magnetic force, and the electromagnet and the magnet are attracted mutually, so that the connecting pipe drives the fixed pin to move towards the inner side of the second mounting hole and move out of the fixed hole, and the fixed hole moves out of the mounting sleeve, so that the disassembly of equipment is completed, the structure is simple and convenient to operate, and the work efficiency is improved.
3. According to the utility model, the clamping block is moved to the position right above the clamping groove by rotating the rotating rod along the pin at the bottom end of the rotating rod, the clamping block is pushed by the pressure spring to be clamped into the clamping groove to fix the lower fixing block and the upper fixing block, the fixing of the rotating block and the bottom plate is completed, and when the rotating block and the bottom plate are required to be disassembled, the clamping block is pulled upwards to enable the pressure spring to shrink the clamping block to move out of the clamping groove, and the upper fixing block and the lower fixing block are separated, so that the workbench is convenient to disassemble and install.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a column structure according to the present utility model;
FIG. 3 is a schematic view of a splicing mechanism according to the present utility model;
FIG. 4 is a schematic cross-sectional view of FIG. 1A according to the present utility model;
Fig. 5 is a schematic structural diagram of a rotary block according to the present utility model.
The reference numerals are: 1. a climbing frame mechanism; 101. a column; 102. a work table; 103. a fixing hole; 104. a connecting block; 2. a splicing mechanism; 201. a mounting sleeve; 202. an inclined plane; 203. a fixing pin; 204. a connecting pipe; 205. an electromagnet; 206. a first mounting hole; 207. a second mounting hole; 208. a magnet; 209. a return spring; 3. a fixing mechanism; 301. a rotating block; 302. a support block; 303. a mounting pin; 304. a bottom plate; 305. a pressure spring; 306. a rotating rod; 307. a clamping block; 308. a clamping groove; 309. a mounting groove; 310. a lower fixing block; 311. and (5) an upper fixing block.
Detailed Description
The following description will be made in detail, with reference to the drawings, of the present utility model, wherein the configurations of the structures described in the following embodiments are merely examples, and the construction climbing frame according to the present utility model is not limited to the configurations described in the following embodiments, but all other embodiments obtained by a person skilled in the art without any inventive effort are within the scope of the present utility model.
Referring to fig. 1 to 5, the present utility model provides a climbing frame for construction engineering, comprising a climbing frame mechanism 1, further comprising: the splicing mechanism 2 and the fixed mechanism 3, the side of climbing frame mechanism 1 and the frontal face swing joint of splicing mechanism 2, the side of climbing frame mechanism 1 and the side fixed connection of fixed mechanism 3, climbing frame mechanism 1 includes stand 101, the top fixedly connected with connecting block 104 of stand 101, splicing mechanism 2 includes installation cover 201, the side inner wall of installation cover 201 and the side swing joint of connecting block 104, fixed mechanism 3 includes supporting shoe 302, the side of supporting shoe 302 and the side fixed connection of stand 101, the side fixedly connected with bottom plate 304 of stand 101, the side inner wall swing joint of supporting shoe 302 has workstation 102, the antiskid wire casing has been seted up on the top of workstation 102, select suitable quantity climbing frame mechanism 1 and splicing mechanism 2 according to the user demand, in the installation, insert the connecting block 104 at stand 101 both ends inside of installation cover 201 and fix, accomplish the concatenation installation to stand 101, and make the stand 101 after the concatenation keep suitable height, insert the supporting shoe 302, and fix the workstation 102 through fixed mechanism 3, the frame use process, the constructor stands on the workstation 102.
Wherein, the second mounting hole 207 has been seted up to the side inner wall of installation cover 201, the side fixedly connected with reset spring 209 of second mounting hole 207, reset spring 209's side fixedly connected with fixed pin 203, inclined plane 202 has been seted up to the side of fixed pin 203, fixed hole 103 has been seted up to the position that the side of connecting block 104 corresponds fixed pin 203, when two stand 101 and installation cover 201, the bottom of connecting block 104 inserts the inner wall of installation cover 201, the bottom of connecting block 104 contacts with inclined plane 202 of fixed pin 203 side, promote fixed pin 203 income second mounting hole 207, when connecting block 104 inserts in the installation cover 201 completely, reset spring 209 promotes fixed pin 203 makes fixed pin 203 insert in the fixed hole 103 of connecting block 104 side, fixed installation cover 201 and stand 101.
Wherein, first mounting hole 206 has been seted up to the side of second mounting hole 207, the side fixedly connected with electro-magnet 205 of first mounting hole 206, the side fixedly connected with connecting pipe 204 of fixed pin 203, the side fixedly connected with magnetite 208 of connecting pipe 204, when need dismantle, electro-magnet 205 circular telegram produces magnetic force, thereby make electro-magnet 205 and magnetite 208 attraction each other, thereby make connecting pipe 204 drive fixed pin 203 to the inboard removal of second mounting hole 207 and shift out fixed hole 103, shift out the fixed hole 103 and install the cover 201, accomplish the dismantlement to equipment.
Wherein, the side fixedly connected with mounting pin 303 of stand 101, the side swing joint of mounting pin 303 has rotatory piece 301, rotatory piece 301 is L type structure, the side inner wall of rotatory piece 301 and the side swing joint of workstation 102, during installation workstation 102, hugs closely one side of workstation 102 in the inside of supporting shoe 302, the opposite side of workstation 102 is placed on bottom plate 304, rotate rotatory piece 301 along mounting pin 303 and make rotatory piece 301 card on workstation 102 to fixed rotatory piece 301 and bottom plate 304, thereby accomplish the installation to workstation 102.
Wherein, the side fixedly connected with lower fixed block 310 of side of bottom plate 304, the side of rotatory piece 301 corresponds the fixed block 310's the fixed block 311 in the fixed connection of position down, the mounting groove 309 has been seted up to the side of fixed block 310 down, the side of mounting groove 309 has rotary rod 306 through round pin swing joint, the top fixedly connected with compression spring 305 of rotary rod 306, the bottom fixedly connected with fixture block 307 of compression spring 305, the side inner wall of fixture block 307 and the side swing joint of rotary rod 306, the draw-in groove 308 has been seted up to the position of the top of fixed block 311 corresponding fixture block 307 on, when rotatory piece 301 and bottom plate 304 are fixed, the round pin rotation rotary rod 306 along the bottom of rotary rod 306 makes the fixture block 307 remove to the draw-in groove 308 directly over, compression spring 305 promotes the fixture block 307 to make fixture block 307 card into the fixed block 310 down and go up fixed block 311 in the draw-in groove 308, accomplish the fixed of rotatory piece 301 and bottom plate 304, when need dismantle rotatory piece 301 and bottom plate 304, upwards pulling fixture block 307 makes compression spring 307 shrink fixture block 307 shift out draw-out the draw-in groove 308, upper fixed block 311 and lower fixed block 310.
Wherein, fixture block 307 is spherical structure, and the bottom of fixture block 307 and the bottom of draw-in groove 308 all fixedly connected with slipmat, and the fixture block 307 of spherical structure cooperates with draw-in groove 308 each other, makes things convenient for fixture block 307 to shift out and shift out into draw-in groove 308, convenient operation.
Wherein the upper and lower fixing pins 203 are symmetrically distributed along the center line of the mounting sleeve 201.
The working principle of the utility model is as follows: when the bottom end of the connecting block 104 is inserted into the inner wall of the mounting sleeve 201 in the mounting process, the bottom end of the connecting block 104 is contacted with the inclined surface 202 on the side surface of the fixed pin 203 to push the fixed pin 203 to be received in the second mounting hole 207, when the connecting block 104 is completely inserted into the mounting sleeve 201, the reset spring 209 pushes the fixed pin 203 to enable the fixed pin 203 to be inserted into the fixed hole 103 on the side surface of the connecting block 104, the mounting sleeve 201 and the upright post 101 are fixed, one side of the workbench 102 is tightly attached to the inside of the supporting block 302, the other side of the workbench 102 is placed on the bottom plate 304, the rotating block 301 is rotated along the mounting pin 303 to enable the rotating block 301 to be clamped on the workbench 102, the pin along the bottom end of the rotating rod 306 rotates the rotating rod 306 to enable the clamping block 307 to move to the position right above the clamping groove 308, the pressure spring 305 pushes the clamping block 307 to downwards enable the clamping block 307 to be clamped into the clamping groove 308 to fix the lower fixing block 310 and the upper fixing block 311, fixing of the rotating block 301 and the bottom plate 304 is completed, mounting of the climbing frame is completed, when disassembly is needed, the clamping block 307 is pulled upwards to enable the pressure spring 305 to shrink the clamping block 307 to move out of the clamping groove 308, the upper fixing block 311 and the lower fixing block 310 are separated, the rotating block 301 is rotated to remove the workbench 102, the electromagnet 205 is electrified to generate magnetic force, the electromagnet 205 and the magnet 208 are attracted mutually, the connecting pipe 204 drives the fixing pin 203 to move towards the inner side of the second mounting hole 207 and move out of the fixing hole 103, and the fixing hole 103 is moved out of the mounting sleeve 201, and disassembly of equipment is completed.
The foregoing description of the preferred embodiments of the utility model is not intended to limit the utility model to the precise form disclosed, and any such modifications, equivalents, and alternatives falling within the spirit and principles of the utility model are intended to be included within the scope of the utility model.

Claims (7)

1. The utility model provides a construction engineering is with climbing frame, includes climbing frame mechanism (1), its characterized in that still includes: splice mechanism (2) and fixed establishment (3), climb the side of frame mechanism (1) and the frontal face swing joint of splice mechanism (2), climb the side of frame mechanism (1) and the side fixed connection of fixed establishment (3), climb frame mechanism (1) including stand (101), the top fixedly connected with connecting block (104) of stand (101), splice mechanism (2) are including installation cover (201), the side swing joint of side inner wall and connecting block (104) of installation cover (201), fixed establishment (3) include supporting shoe (302), the side of supporting shoe (302) and the side fixed connection of stand (101), the side fixedly connected with bottom plate (304) of stand (101), the side inner wall swing joint of supporting shoe (302) has workstation (102), anti-skidding wire casing has been seted up on the top of workstation (102).
2. The climbing frame for construction engineering according to claim 1, wherein: the side inner wall of installation cover (201) has seted up second mounting hole (207), the side fixedly connected with reset spring (209) of second mounting hole (207), the side fixedly connected with fixed pin (203) of reset spring (209), inclined plane (202) have been seted up to the side of fixed pin (203), fixed hole (103) have been seted up in the position that the side of connecting block (104) corresponds fixed pin (203).
3. The climbing frame for construction engineering according to claim 2, wherein: the side of second mounting hole (207) has seted up first mounting hole (206), the side fixedly connected with electro-magnet (205) of first mounting hole (206), the side fixedly connected with connecting pipe (204) of fixed pin (203), the side fixedly connected with magnetite (208) of connecting pipe (204).
4. The climbing frame for construction engineering according to claim 1, wherein: the side fixedly connected with mounting pin (303) of stand (101), the side swing joint of mounting pin (303) has rotatory piece (301), rotatory piece (301) are L type structure, the side inner wall of rotatory piece (301) and the side swing joint of workstation (102).
5. The climbing frame for construction engineering according to claim 4, wherein: the side fixedly connected with lower fixed block (310) of bottom plate (304), the side of rotatory piece (301) corresponds fixed block (310) down's position fixedly connected with fixed block (311), mounting groove (309) have been seted up to the side of fixed block (310) down, the side of mounting groove (309) has rotary rod (306) through round pin swing joint, the top fixedly connected with pressure spring (305) of rotary rod (306), the bottom fixedly connected with fixture block (307) of pressure spring (305), the side inner wall of fixture block (307) and the side swing joint of rotary rod (306), draw-in groove (308) have been seted up at the top of going up fixed block (311) corresponding the position of fixture block (307).
6. The climbing frame for construction engineering according to claim 5, wherein: the clamping block (307) is of a spherical structure, and the bottom ends of the clamping block (307) and the clamping groove (308) are fixedly connected with anti-slip pads.
7. The climbing frame for construction engineering according to claim 2, wherein: the fixing pins (203) are symmetrically distributed along the central line of the mounting sleeve (201).
CN202322765030.9U 2023-10-16 2023-10-16 Construction engineering is with climbing frame Active CN221031331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322765030.9U CN221031331U (en) 2023-10-16 2023-10-16 Construction engineering is with climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322765030.9U CN221031331U (en) 2023-10-16 2023-10-16 Construction engineering is with climbing frame

Publications (1)

Publication Number Publication Date
CN221031331U true CN221031331U (en) 2024-05-28

Family

ID=91136164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322765030.9U Active CN221031331U (en) 2023-10-16 2023-10-16 Construction engineering is with climbing frame

Country Status (1)

Country Link
CN (1) CN221031331U (en)

Similar Documents

Publication Publication Date Title
CN110644774B (en) Aluminum alloy template fixing bolt building structure
CN210049454U (en) Suspension type building curtain
CN112049407B (en) Concrete building template for civil engineering
CN221031331U (en) Construction engineering is with climbing frame
CN216974154U (en) Plate buckle frame support
CN211900011U (en) Building construction foundation ditch atress guardrail convenient to installation is dismantled
CN111075176A (en) Split type adjustable scaffold
CN210129301U (en) Real standard platform device of network server framework
CN219751737U (en) Platform connection structure for tower crane installation
CN216487019U (en) Intelligence station is with instructing signpost convenient to installation and dismantlement
CN220522198U (en) Building guardrail for road construction engineering
CN221462019U (en) Guardrail convenient to adjust
CN218843388U (en) Make things convenient for board of making an uproar that falls of dismouting
CN220267154U (en) Scaffold with adjustable length
CN220184248U (en) Steel construction rack convenient to installation
CN114753713B (en) Construction rail guard is built in room
CN221322008U (en) Wood-like railing capable of being installed rapidly
CN216007877U (en) Climbing frame protective net for building climbing engineering
CN218323599U (en) Heat preservation decorative wall mounting structure
CN219266385U (en) Electric energy meter with stable operation
CN217054263U (en) Draw scaffold frame of encorbelmenting to one side
CN219773584U (en) Scaffold mounting node
CN219411817U (en) Multi-specification universal adjustable rectangular column plastic template
CN220290473U (en) Portable plumbous room of industry ray protection
CN218904250U (en) Portable hydraulic shaft taking device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant