CN220888916U - Elevator pit structure assembled by precast slabs quickly - Google Patents

Elevator pit structure assembled by precast slabs quickly Download PDF

Info

Publication number
CN220888916U
CN220888916U CN202322726906.9U CN202322726906U CN220888916U CN 220888916 U CN220888916 U CN 220888916U CN 202322726906 U CN202322726906 U CN 202322726906U CN 220888916 U CN220888916 U CN 220888916U
Authority
CN
China
Prior art keywords
precast concrete
prefabricated
panel
mould
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322726906.9U
Other languages
Chinese (zh)
Inventor
赵鹏付
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
C&d Real Estate Corp ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322726906.9U priority Critical patent/CN220888916U/en
Application granted granted Critical
Publication of CN220888916U publication Critical patent/CN220888916U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model provides an elevator pit structure quickly assembled by precast slabs, which comprises a front panel, a rear panel, a left side panel and a right side panel, wherein the front panel, the rear panel, the left side panel and the right side panel are all independent precast concrete molds; the left side and the right side of the precast concrete mould are respectively provided with a tongue-and-groove, and two adjacent precast concrete moulds are spliced by the tongue-and-groove; a first reinforcing structure formed by splicing a first transverse rib and a first longitudinal rib is arranged in the precast concrete mould; a second reinforcing structure is further arranged in the precast concrete die, and is formed by welding a second transverse rib and a second longitudinal rib; the upper side of the precast concrete mould is connected with a plurality of hanging rings. The utility model is formed by assembling a plurality of prefabricated concrete molds, can prefabricated concrete molds with proper sizes according to actual demands, is not limited by the size of the integral water collecting well, has higher use flexibility, is convenient to install, has obvious work robbing advantage in rainy seasons, and has higher popularization value.

Description

Elevator pit structure assembled by precast slabs quickly
Technical Field
The utility model relates to the technical field of water collecting wells, in particular to an elevator pit structure assembled by prefabricated plates quickly.
Background
The elevator pit structure is a water collecting well arranged in the elevator pit, is a well for collecting and storing underground water, has a relatively large diameter, and is mainly used for collecting sewage and rainwater. Traditional sump pit mainly adopts the brick fetal membrane to make, along with socioeconomic development, begins to appear prefabricated sump pit on the market, chinese patent CN114561976a discloses a prefabricated sump pit, including the cement terrace with edges, the cube groove has been seted up to the inner wall of cement terrace with edges, the inner wall fixedly connected with reinforcement cage of cement terrace with edges, the inner wall of cement terrace with edges is provided with the pouring sheet, the outer wall fixedly connected with working shaft of cement terrace with edges, the working shaft includes the well body, prefabricated groove has been seted up to the inner wall of the well body. Prefabricated well is reinforced concrete structure, and the outside is the square, reinforced concrete structure upper end is equipped with square ponding mouth of a river, and inside fretwork has the wall of a well all around, the wall of a well slope certain angle, and cement terrace can carry through the reinforcement cage, and cement terrace is the terrace structure, and the bottom area is less than the top area, helps putting into prefabrication inslot like this, pours cement between prefabrication groove and pouring plate, waits that cement solidifies and can accomplish the pouring, has realized the prefabrication of integrated sump pit.
However, the integrated water collecting well prefabrication can only aim at the situation of smaller volume, the use is limited, the flexibility is not high, and the use requirement cannot be met, so that an elevator pit structure quickly assembled by prefabricated plates is needed to solve the technical problems.
Disclosure of utility model
The utility model aims to provide an elevator pit structure assembled by precast slabs quickly so as to solve the technical problems.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the elevator pit structure quickly assembled by precast slabs comprises a front panel, a rear panel, a left side panel and a right side panel, wherein the front panel, the rear panel, the left side panel and the right side panel are all independent precast concrete molds;
The left side and the right side of the precast concrete mould are respectively provided with a tongue-and-groove, and two adjacent precast concrete moulds are spliced by the tongue-and-groove;
A first reinforcing structure formed by splicing a first transverse rib and a first longitudinal rib is arranged in the precast concrete mould;
A second reinforcing structure is further arranged in the precast concrete die, and is formed by welding a second transverse rib and a second longitudinal rib;
The upper side of the precast concrete mould is connected with a plurality of hanging rings.
Further, the first reinforcing structure is provided with two layers.
Further, the second reinforcing structure is arranged between the two layers of first reinforcing structures, the two ends of the second transverse ribs and the second longitudinal ribs of the second reinforcing structure are respectively provided with a first bending section extending in the thickness direction of the precast concrete mould, and the first bending sections are equal in length and are arranged in the same direction.
Further, the first reinforcing structure and the second reinforcing structure are respectively provided with inclined ribs.
Further, the hanging ring is of a 'U' -shaped structure, the root of the hanging ring is embedded into the main body of the precast concrete mould, and two second bending sections of the 'U' -shaped structure extend in the length direction of the precast concrete mould.
Further, the longitudinal section of the precast concrete die is of a rectangular structure or an L-shaped structure.
After the technical scheme is adopted, compared with the prior art, the method has the following beneficial effects:
The concrete mould is formed by assembling the precast concrete moulds, the concrete mould with proper size can be precast according to actual demands, the concrete mould is not limited by the size of the integral water collecting well, the use flexibility is high, the installation is convenient, the working advantage is obvious in rainy season, and the concrete mould has great popularization value.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained according to these drawings without inventive faculty for a person skilled in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a partial structure of a precast concrete form 1 of the present utility model;
FIG. 3 is a schematic longitudinal section of a precast concrete form 1 of the present utility model;
Fig. 4 is a schematic perspective view of a second reinforcing structure 3 according to the present utility model;
fig. 5 is a schematic longitudinal section of a precast concrete form 1 when the present utility model is provided with diagonal ribs 4.
Reference numerals illustrate: 1. prefabricating a concrete mould; 11. a tongue-and-groove; 12. a hanging ring; 121. a second bending section; 2. a first reinforcing structure; 21. a first transverse rib; 22. a first longitudinal rib; 3. a second reinforcing structure; 31. a second transverse rib; 32. a second longitudinal rib; 321. a first bending section; 4. and (5) oblique ribs.
Detailed Description
The present utility model will be described in further detail with reference to the following examples in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
In view of the problems of the prior art, the present utility model provides an elevator pit structure assembled by prefabricated panels, and the present utility model is described in detail below with reference to the accompanying drawings.
Referring to fig. 1 to 4, the technical scheme adopted in this embodiment is as follows: the utility model provides an elevator pit structure of assembling fast by prefabricated plate, mainly includes front panel, rear panel, left side board and back right side board four parts, front panel, rear panel, left side board and right side board all be independent prefabricated concrete mould 1, prefabricated concrete mould 1's longitudinal section can be rectangle structure or "L" type structure, and its concrete structure setting can be adjusted as required, before prefabricated concrete mould 1 pours the concrete, has placed the square steel of the same model respectively in prefabricated form's left and right sides, makes prefabricated concrete mould 1's left and right sides form tongue-and-groove 11, two prefabricated concrete moulds 1 adjacent each other are assembled through tongue-and-groove 11 pair card, and the sump pit is assembled through four independent prefabricated concrete moulds 1 pair cards, and every prefabricated concrete mould 1's upside is connected with a plurality of rings 12 respectively.
It should be specifically noted that, the first reinforcement structure 2 formed by splicing the first transverse ribs 21 and the first longitudinal ribs 22 is disposed in the precast concrete mould 1, where the first transverse ribs 21 and the first longitudinal ribs 22 are respectively provided with a plurality of first transverse ribs 21 and a plurality of first longitudinal ribs 22, and the plurality of first transverse ribs 21 and the plurality of first longitudinal ribs 22 are lapped or welded.
It should be specifically noted that, the second reinforcing structure 3 is further disposed inside the precast concrete die 1, and the second reinforcing structure 3 is formed by welding a second transverse rib 31 and a second longitudinal rib 32.
As a preferred form of the utility model, the first reinforcing structure 2 may be provided in two layers and the second reinforcing structure 3 may be provided between the two first reinforcing structures 2.
The two ends of the second transverse rib 31 and the second longitudinal rib 32 of the second reinforcing structure 3 are respectively provided with a first bending section 321 extending in the thickness direction of the precast concrete mould 1, and the lengths of the first bending sections 321 are equal and extend in the same direction. The main part of second additional strengthening 3 is "H" type structure, perhaps sets up two more than two second between two second horizontal muscle 31 and indulges muscle 32, in tiling prefabricated concrete mould 1 in-process, first bending section 321 is down for second additional strengthening 3 can play good support to upper first additional strengthening 2, avoids upper first additional strengthening 2 to collapse at the in-process of pouring concrete, ensures prefabricated concrete mould 1 holistic structural strength.
As a preferred mode of the present utility model, referring to fig. 5, the first reinforcing structure 2 and the second reinforcing structure 3 may further have diagonal ribs 4, and the diagonal ribs 4 may be provided to enhance the strength of the precast concrete form 1.
As a preferred mode of the present utility model, referring to fig. 3, the hanging ring 12 is in a shape of a "table", the root of which is embedded in the main body of the precast concrete mould 1 and is integrally connected with the concrete, the "table" shape is provided with two second bending sections 121, the two second bending sections 121 extend in the length direction of the precast concrete mould 1, and the second bending sections 121 are designed to improve the grip of the concrete on the root of the hanging ring 12 and strengthen the connection strength of the hanging ring 12 after the concrete is poured.
Working principle: prefabricating templates, reinforcing bars and structures according to actual requirements of the size of the water collecting well, arranging square steel on the wide edges of two sides of the prefabricating templates, finally pouring concrete, finally forming a prefabricating concrete die 1, respectively arranging the prefabricating concrete dies 1 around the water collecting well according to the requirements, and after the concrete dies are completely disassembled after being dried, hoisting the prefabricating concrete dies 1 after the four dies are disassembled one by one into place through a crane to realize assembly, so as to form the water collecting well, wherein the concrete construction flow of the water collecting well is as follows: prefabricating, hoisting in place, tongue-and-groove butt joint, side wall backfilling, R angle, pre-paving an anti-sticking coiled material, reinforcing steel bars, hoisting a mould and pouring concrete.
Compared with the traditional brick moulding bed, the water collecting well is formed by adopting the mode of prefabricating the concrete mould, and the water collecting well has the advantages that certain cost can be saved under the condition of considering different water collecting well sizes, and more cost can be saved under the condition that the prefabricated mould can be reused under the condition that the consistency of the big sample of the water collecting well size is higher. The hoisting and assembling period of the single water collecting well is quick, the masonry time under the traditional brick moulding bed scheme can be reduced, the side wall can be backfilled without considering the mortar age, and particularly, the advantage of working robbery in rainy season is obvious.
Compared with a prefabricated integrated water collecting well, the water collecting well has higher use flexibility, is not limited by the size of the water collecting well, and has wider use range.
In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more; the terms "upper," "lower," "left," "right," and the like are used for convenience in describing and simplifying the present utility model based on the orientation or positional relationship shown in the drawings, and do not denote or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The foregoing is merely illustrative of the present utility model and not restrictive, and other modifications and equivalents thereof may occur to those skilled in the art without departing from the spirit and scope of the present utility model.

Claims (6)

1. The elevator pit structure is characterized by comprising a front panel, a rear panel, a left side panel and a right side panel, wherein the front panel, the rear panel, the left side panel and the right side panel are all independent precast concrete molds;
The left side and the right side of the precast concrete mould are respectively provided with a tongue-and-groove, and two adjacent precast concrete moulds are spliced by the tongue-and-groove;
A first reinforcing structure formed by splicing a first transverse rib and a first longitudinal rib is arranged in the precast concrete mould;
A second reinforcing structure is further arranged in the precast concrete die, and is formed by welding a second transverse rib and a second longitudinal rib;
The upper side of the precast concrete mould is connected with a plurality of hanging rings.
2. An elevator pit structure rapidly assembled from prefabricated panels as claimed in claim 1, wherein the first reinforcing structure is provided with two layers.
3. The elevator pit structure assembled by precast slabs quickly according to claim 2, wherein the second reinforcing structure is arranged between two layers of the first reinforcing structures, two ends of the second transverse ribs and the second longitudinal ribs of the second reinforcing structure are respectively provided with a first bending section extending in the thickness direction of the precast concrete mould, and the first bending sections are equal in length and are arranged in the same direction.
4. A pit structure for an elevator assembled rapidly from prefabricated panels according to any one of claims 1 or 3, wherein the first and second reinforcing structures are provided with diagonal ribs, respectively.
5. The elevator pit structure assembled by prefabricated panels quickly according to claim 1, wherein the hanging ring is of a shape like a Chinese character 'ji', the root of the hanging ring is embedded into the main body of the prefabricated concrete mould, and two second bending sections of the shape like a Chinese character 'ji' extend in the length direction of the prefabricated concrete mould.
6. The elevator pit structure assembled by prefabricated panels quickly according to claim 1, wherein the longitudinal section of the prefabricated concrete form is a rectangular structure or an "L" structure.
CN202322726906.9U 2023-10-11 2023-10-11 Elevator pit structure assembled by precast slabs quickly Active CN220888916U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322726906.9U CN220888916U (en) 2023-10-11 2023-10-11 Elevator pit structure assembled by precast slabs quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322726906.9U CN220888916U (en) 2023-10-11 2023-10-11 Elevator pit structure assembled by precast slabs quickly

Publications (1)

Publication Number Publication Date
CN220888916U true CN220888916U (en) 2024-05-03

Family

ID=90839591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322726906.9U Active CN220888916U (en) 2023-10-11 2023-10-11 Elevator pit structure assembled by precast slabs quickly

Country Status (1)

Country Link
CN (1) CN220888916U (en)

Similar Documents

Publication Publication Date Title
CN103883034B (en) A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton
CN204059601U (en) A kind of steel bar connecting structure of prefabricated concrete element
CN105926804A (en) Reinforcement method of 3D printed reinforced masonry shear wall
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN208486404U (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN108316522A (en) The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof
CN108678220A (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN206220297U (en) Precast shear wall
CN220888916U (en) Elevator pit structure assembled by precast slabs quickly
CN111075101A (en) BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN210562953U (en) Prefabricated plate and coincide floor
CN210217164U (en) Concrete 3D prints component casing and structure
CN211113137U (en) Assembled reinforced concrete pier
CN211228616U (en) Basement outer wall post-cast strip hard closed assembly type PC component
CN210316150U (en) A dense rib with filling concrete deep beam board for scale pig farm built-up layer
CN209737913U (en) Coincide floor mould convenient to drawing of patterns
CN209308158U (en) A kind of precast shear wall using cast-in-place connection type
CN111424968A (en) Slip-form construction method for buttress column silo
CN113323262A (en) 3D printed prefabricated wall module, wall and construction method of wall
CN111502038A (en) Assembly type PC building structure and construction method thereof
CN204898718U (en) Assemble integral reinforced concrete utility tunnel and production mould thereof
CN221218874U (en) Integrated template structure of high and large bearing platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240522

Address after: 361008 38th floor, Jianfa international building, 1699 Huandao East Road, Siming District, Xiamen City, Fujian Province

Patentee after: C&D REAL ESTATE Corp.,Ltd.

Country or region after: China

Address before: 719000 No. 37, dongmahe village, Mahe Town, Yuyang District, Yulin City, Shaanxi Province

Patentee before: Zhao Pengfu

Country or region before: China