CN220768308U - Municipal works construction drainage device - Google Patents
Municipal works construction drainage device Download PDFInfo
- Publication number
- CN220768308U CN220768308U CN202322502037.1U CN202322502037U CN220768308U CN 220768308 U CN220768308 U CN 220768308U CN 202322502037 U CN202322502037 U CN 202322502037U CN 220768308 U CN220768308 U CN 220768308U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- drainage device
- plate
- assembly
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 37
- 238000004140 cleaning Methods 0.000 claims abstract description 21
- 239000013049 sediment Substances 0.000 claims abstract description 17
- 238000005086 pumping Methods 0.000 claims abstract description 14
- 230000002265 prevention Effects 0.000 claims abstract description 9
- 230000000694 effects Effects 0.000 claims description 14
- 239000007788 liquid Substances 0.000 claims description 13
- 238000012544 monitoring process Methods 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000004575 stone Substances 0.000 abstract description 4
- 230000005484 gravity Effects 0.000 description 5
- 239000010865 sewage Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000012535 impurity Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model relates to the technical field of municipal construction and discloses a municipal engineering construction drainage device, which comprises a drainage device main body, wherein a sediment prevention assembly is arranged on the left side of the drainage device main body, a protection net is fixedly connected on the left side of the inner side of an annular frame, a connecting block is fixedly connected on the left side of the annular frame, a fixing plate is fixedly connected on the left side of the connecting block, a rotating rod is movably sleeved in the middle of the side face of the fixing plate, a cleaning rod is fixedly connected on the right side of the rotating rod, a cleaning brush is fixedly connected on the right side of the cleaning rod, a driven gear is fixedly sleeved on the left side of the outer side of the rotating rod, a cleaning motor is fixedly connected on the front side of the left side of the fixing plate, a driving gear is fixedly connected on the output shaft of the cleaning motor, sediment carried in water can be intercepted by the protection net by the sediment prevention assembly, sediment stones are prevented from entering the inside of the impeller assembly, the cleaning motor is started, sediment on the surface of the protection net can be cleaned, and blockage is prevented from affecting the normal water pumping efficiency of the drainage device main body.
Description
Technical Field
The utility model relates to the technical field of municipal construction, in particular to a drainage device for municipal engineering construction.
Background
When municipal works construction, meetting rainwater weather easily, can't carry out the drainage in incomplete sewer pipe, can only collect sewage in the sump pit, need discharge sewage in the sump pit, prevent that sewage from gathering and influence later stage municipal engineering construction, consequently need municipal engineering construction to use drainage device to be arranged in carrying out the drainage to municipal engineering construction.
The existing drainage device for municipal engineering construction does not have a good filtering structure, is inconvenient to filter impurities such as sediment in sewage in a water collecting well, and is easy to block a suction head of a water pump when draining, so that the drainage effect is relatively general, operators are required to manually clean the impurities such as sediment, the working intensity of the operators is improved, and the working efficiency is reduced;
when draining, the liquid level is higher than the water inlet of the drainage device, the height of the liquid level is observed manually by the existing method, when the liquid level is lower than the position of the water inlet, the device needs to be stopped manually to work, but if the liquid level is not observed in time to be too low, the motor is easy to burn, and economic loss is generated.
Disclosure of Invention
In order to overcome the defects in the prior art, the utility model provides a municipal engineering construction drainage device which aims to solve the problems in the background art.
The utility model provides the following technical scheme: the utility model provides a municipal works construction drainage device, includes the drainage device main part, prevent silt subassembly is installed in the left side of drainage device main part, prevent that the front of silt subassembly is installed liquid level monitoring assembly, the water conservancy diversion subassembly is installed in the left side at drainage device main part top;
the silt subassembly is prevented includes the annular frame, the inboard left side fixedly connected with protection network of annular frame, the left side fixedly connected with connecting block of annular frame, the left side fixedly connected with fixed plate of connecting block, the middle activity of fixed plate side has cup jointed the rotary rod, the right side fixedly connected with clearance pole of rotary rod, the right side fixedly connected with clearance brush of clearance pole, driven gear has been cup jointed in the left side fixedly in the rotary rod outside, the positive fixedly connected with clearance motor of fixed plate left side, the output shaft fixedly connected with driving gear of clearance motor, driving gear and driven gear intermeshing.
Further, the drainage device main body comprises a bottom plate, the bottom fixedly connected with bottom block of bottom plate, the top fixedly connected with supporting shoe of bottom plate, the top fixedly connected with motor that draws water of supporting shoe, the left side fixedly connected with impeller subassembly of motor that draws water, the left side fixedly connected with inlet tube of impeller subassembly, the back fixedly connected with drain pipe at impeller subassembly top.
Further, the water conservancy diversion subassembly includes the backup pad, the bottom of backup pad and the top fixed connection of bottom plate, the top fixedly connected with fixed pipe of backup pad, the inboard activity of fixed pipe has cup jointed the pivot, the both sides activity in the pivot outside has cup jointed first go-between, the left side fixedly connected with guide plate in the first go-between outside, the pivot outside has cup jointed the second go-between near the position activity at both ends, the right side fixedly connected with guide plate in the second go-between outside.
Further, the liquid level monitoring assembly comprises a fixed block, the fixed block is fixedly connected with the annular frame, a cylindrical pipe is fixedly connected to the top of the fixed block, a threaded column is sleeved with middle threads at the top of the fixed block, a handle block is fixedly connected to the bottom of the threaded column, a pressure sensor is fixedly connected to the top of the threaded column, and a buoyancy ball is arranged on the inner side of the cylindrical pipe.
Further, a spring is fixedly connected to the bottom of the guide plate, and the other end of the spring is fixedly connected with the bottom plate.
Further, the front and the back of the supporting plate are fixedly connected with reinforcing plates, and the other ends of the reinforcing plates are fixedly connected with the top of the bottom plate.
Further, a filter screen is fixedly connected to the top of the inner side of the cylindrical tube.
Further, the pressure sensor is electrically connected with the cleaning motor and the water pumping motor.
The utility model has the technical effects and advantages that:
1. according to the utility model, by arranging the sediment prevention assembly, sediment carried in water can be intercepted by the protection net, sediment stones are prevented from entering the impeller assembly, the cleaning motor is started to drive the driving gear to rotate, the driven gear is driven to rotate through gear engagement, so that the rotary rod drives the cleaning rod to rotate, the cleaning hairbrush can clean sediment on the surface of the protection net, the phenomenon that blockage affects the normal pumping efficiency of the drainage device main body is avoided, and cleaned sediment falls on the surface of the guide plate under the action of gravity and moves to the bottom along the surface of the guide plate.
2. According to the utility model, the liquid level monitoring assembly is arranged, when the water level is reduced to the height of the pressure sensor, the buoyancy ball is pressed against the pressure sensor under the action of gravity, so that the cleaning motor and the water pumping motor are controlled to stop working.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present utility model.
Fig. 2 is a schematic diagram of a main structure of a drainage device according to the present utility model.
FIG. 3 is a schematic view of the silt preventing assembly of the present utility model.
Fig. 4 is a schematic structural diagram of a flow guiding assembly according to the present utility model.
Fig. 5 is a schematic view of a spindle structure according to the present utility model.
FIG. 6 is a schematic view of the liquid level monitoring assembly according to the present utility model.
Fig. 7 is a schematic view of the structure of the pressure sensor of the present utility model.
The reference numerals are: 1. a drainage device body; 101. a bottom plate; 102. a support block; 103. a water pumping motor; 104. an impeller assembly; 105. a water inlet pipe; 106. a drain pipe; 107. a bottom block; 2. a silt prevention assembly; 201. an annular frame; 202. a protective net; 203. a connecting block; 204. a fixing plate; 205. a rotating rod; 206. cleaning a rod; 207. cleaning a hairbrush; 208. a driven gear; 209. cleaning a motor; 210. a drive gear; 3. a flow guiding assembly; 301. a support plate; 302. a reinforcing plate; 303. a deflector; 304. a spring; 305. a fixed tube; 306. a rotating shaft; 307. a first connection ring; 308. a second connecting ring; 4. a liquid level monitoring assembly; 401. a fixed block; 402. a cylindrical tube; 403. a filter screen; 404. a threaded column; 405. a handle block; 406. a pressure sensor; 407. and (5) buoyancy balls.
Detailed Description
The embodiments of the present utility model will be clearly and completely described below with reference to the drawings in the present utility model, and the configurations of the structures described in the following embodiments are merely examples, and the municipal engineering construction drainage device according to the present utility model is not limited to the structures described in the following embodiments, and all other embodiments obtained by a person having ordinary skill in the art without making any creative effort are within the scope of the present utility model.
Referring to fig. 1-7, the utility model provides a municipal engineering construction drainage device, which comprises a drainage device main body 1, wherein a sediment prevention assembly 2 is arranged on the left side of the drainage device main body 1, a liquid level monitoring assembly 4 is arranged on the front surface of the sediment prevention assembly 2, and a diversion assembly 3 is arranged on the left side of the top of the drainage device main body 1;
the silt prevention assembly 2 comprises an annular frame 201, a protection net 202 is fixedly connected to the left side of the inner side of the annular frame 201, a connecting block 203 is fixedly connected to the left side of the annular frame 201, a fixing plate 204 is fixedly connected to the left side of the connecting block 203, a rotating rod 205 is movably sleeved in the middle of the side face of the fixing plate 204, a cleaning rod 206 is fixedly connected to the right side of the rotating rod 205, a cleaning brush 207 is fixedly connected to the right side of the cleaning rod 206, a driven gear 208 is fixedly sleeved on the left side of the outer side of the rotating rod 205, a cleaning motor 209 is fixedly connected to the right side of the left side of the fixing plate 204, a driving gear 210 is fixedly connected to an output shaft of the cleaning motor 209, and the driving gear 210 is meshed with the driven gear 208.
In this embodiment, place drainage device main part 1 in the low-lying position that needs to carry out the drainage, start the impeller rotation of the inside that water pumping motor 103 drove impeller subassembly 104, water is taken in from inlet tube 105, discharge from drain pipe 106, rivers are in the time of preventing silt subassembly 2 through the protection network 202 interception, avoid silt stone to get into the inside of impeller subassembly 104, start the clearance motor 209 and drive driving gear 210 rotation, drive driven gear 208 rotation through the gear engagement, thereby make rotary rod 205 drive clearance pole 206 rotation, then make clearance brush 207 can clear up the silt on protection network 202 surface, avoid taking place to block up the normal pumping efficiency that influences drainage device main part 1, the silt that the clearance was got off falls on the surface of guide plate 303 under the effect of gravity, and remove to the bottom along the surface of guide plate 303, drainage device main part 1 can take place vibrations in the time of work, thereby the bottom emergence of preventing that silt subassembly 2 left side is piled up under the buoyancy effect of buoyancy ball 407, when the water level reduction motor 406 receives the effect of pressure sensor 406, the effect of pressure sensor 209 when the control of the pressure sensor that the pressure sensor of water pumping 407 is stopped to the high pressure of pressure sensor 407.
In a preferred embodiment, the drainage device body 1 includes a bottom plate 101, a bottom block 107 is fixedly connected to the bottom of the bottom plate 101, a supporting block 102 is fixedly connected to the top of the bottom plate 101, a water pumping motor 103 is fixedly connected to the top of the supporting block 102, an impeller assembly 104 is fixedly connected to the left side of the water pumping motor 103, a water inlet pipe 105 is fixedly connected to the left side of the impeller assembly 104, and a water drain pipe 106 is fixedly connected to the back surface of the top of the impeller assembly 104.
In a preferred embodiment, the diversion assembly 3 includes a supporting plate 301, the bottom of the supporting plate 301 is fixedly connected with the top of the bottom plate 101, the top of the supporting plate 301 is fixedly connected with a fixing tube 305, the inner side of the fixing tube 305 is movably sleeved with a rotating shaft 306, two sides of the outer side of the rotating shaft 306 are movably sleeved with a first connecting ring 307, the left side of the outer side of the first connecting ring 307 is fixedly connected with a diversion plate 303, the outer side of the rotating shaft 306 is movably sleeved with a second connecting ring 308 near the two ends, and the right side of the outer side of the second connecting ring 308 is fixedly connected with a diversion plate 303.
In a preferred embodiment, the liquid level monitoring assembly 4 comprises a fixed block 401, the fixed block 401 is fixedly connected with the annular frame 201, a cylindrical tube 402 is fixedly connected to the top of the fixed block 401, a threaded column 404 is sleeved on the middle thread of the top of the fixed block 401, a handle block 405 is fixedly connected to the bottom of the threaded column 404, a pressure sensor 406 is fixedly connected to the top of the threaded column 404, and a buoyancy ball 407 is arranged on the inner side of the cylindrical tube 402.
In a preferred embodiment, a spring 304 is fixedly connected to the bottom of the baffle 303, and the other end of the spring 304 is fixedly connected to the bottom plate 101.
In a preferred embodiment, the front and back sides of the support plate 301 are fixedly connected with a reinforcing plate 302, and the other end of the reinforcing plate 302 is fixedly connected with the top of the bottom plate 101.
In a preferred embodiment, a filter screen 403 is fixedly attached to the top of the inner side of the cylindrical tube 402.
In a preferred embodiment, pressure sensor 406 is electrically connected to both cleaning motor 209 and pump motor 103.
The working principle of the utility model is as follows: placing drainage device main part 1 in the low-lying position that needs to carry out the drainage, start the impeller rotation of the inside that water pump 103 drove impeller subassembly 104, water is taken in from inlet tube 105, from drain pipe 106 discharge, rivers are when preventing silt subassembly 2 through, the silt that carries in the water can be intercepted by protection network 202, avoid silt stone to get into the inside of impeller subassembly 104, start the clearance motor 209 and drive driving gear 210 rotation, drive driven gear 208 rotation through the gear engagement, thereby make rotary rod 205 drive clearance pole 206 rotation, then make clearance brush 207 can clear up the silt on protection network 202 surface, avoid taking place to block up the normal pumping efficiency that influences drainage device main part 1, the silt that the clearance falls on the surface of guide plate 303 under the effect of gravity, and remove to the bottom along the surface of guide plate 303, the sediment can take place the vibrations in the time of work, thereby make the surperficial whereabouts of silt along guide plate 303 can be better, avoid taking place to pile up in the bottom in the left of preventing silt subassembly 2, the buoyancy ball is under the buoyancy effect of water, when the water level reduces the high motor 406, the effect of the buoyancy ball 407 is controlled by gravity to the pressure sensor 407, thereby the pressure sensor is stopped to the pressure sensor is pressed to the pressure 407 when the buoyancy motor is moved, 407.
Finally: the foregoing description of the preferred embodiment of the present application is not intended to limit the utility model to the particular form disclosed, but on the contrary, the intention is to cover all modifications, equivalents, alternatives, and alternatives falling within the spirit and scope of the utility model.
Claims (8)
1. Municipal works construction drainage device, including drainage device main part (1), its characterized in that: the water draining device comprises a water draining device body (1), wherein a sediment prevention assembly (2) is arranged on the left side of the water draining device body (1), a liquid level monitoring assembly (4) is arranged on the front surface of the sediment prevention assembly (2), and a flow guiding assembly (3) is arranged on the left side of the top of the water draining device body (1);
silt subassembly (2) are prevented includes annular frame (201), the inboard left side fixedly connected with protection network (202) of annular frame (201), the left side fixedly connected with connecting block (203) of annular frame (201), the left side fixedly connected with fixed plate (204) of connecting block (203), rotary rod (205) have been cup jointed in the centre activity of fixed plate (204) side, the right side fixedly connected with clearance pole (206) of rotary rod (205), the right side fixedly connected with clearance brush (207) of clearance pole (206), driven gear (208) have been cup jointed in the left side fixedly on rotary rod (205) outside, the positive fixedly connected with clearance motor (209) of fixed plate (204) left side, the output shaft fixedly connected with driving gear (210) of clearance motor (209), driving gear (210) and driven gear (208) intermeshing.
2. The municipal engineering construction drainage device according to claim 1, wherein: the drainage device comprises a drainage device body (1) and is characterized by comprising a bottom plate (101), wherein the bottom of the bottom plate (101) is fixedly connected with a bottom block (107), the top of the bottom plate (101) is fixedly connected with a supporting block (102), the top of the supporting block (102) is fixedly connected with a water pumping motor (103), the left side of the water pumping motor (103) is fixedly connected with an impeller assembly (104), the left side of the impeller assembly (104) is fixedly connected with a water inlet pipe (105), and the back of the top of the impeller assembly (104) is fixedly connected with a drainage pipe (106).
3. The municipal engineering construction drainage device according to claim 1, wherein: the flow guide assembly (3) comprises a support plate (301), the bottom of the support plate (301) is fixedly connected with the top of the bottom plate (101), a fixed pipe (305) is fixedly connected with the top of the support plate (301), a rotating shaft (306) is movably sleeved on the inner side of the fixed pipe (305), first connecting rings (307) are movably sleeved on the two sides of the outer side of the rotating shaft (306), a flow guide plate (303) is fixedly connected on the left side of the outer side of the first connecting rings (307), a second connecting ring (308) is movably sleeved on the outer side of the rotating shaft (306) close to the positions of the two ends, and a flow guide plate (303) is fixedly connected on the right side of the outer side of the second connecting ring (308).
4. The municipal engineering construction drainage device according to claim 1, wherein: the liquid level monitoring assembly (4) comprises a fixed block (401), the fixed block (401) is fixedly connected with the annular frame (201), a cylindrical pipe (402) is fixedly connected to the top of the fixed block (401), a threaded column (404) is sleeved with middle threads at the top of the fixed block (401), a handle block (405) is fixedly connected to the bottom of the threaded column (404), a pressure sensor (406) is fixedly connected to the top of the threaded column (404), and a buoyancy ball (407) is arranged on the inner side of the cylindrical pipe (402).
5. A municipal works construction drainage device according to claim 3, wherein: the bottom of the guide plate (303) is fixedly connected with a spring (304), and the other end of the spring (304) is fixedly connected with the bottom plate (101).
6. A municipal works construction drainage device according to claim 3, wherein: the front and the back of backup pad (301) are all fixedly connected with reinforcing plate (302), the other end of reinforcing plate (302) is fixedly connected with the top of bottom plate (101).
7. The municipal works construction drainage device of claim 4, wherein: the top of the inner side of the cylindrical pipe (402) is fixedly connected with a filter screen (403).
8. The municipal works construction drainage device of claim 4, wherein: the pressure sensor (406) is electrically connected with the cleaning motor (209) and the water pumping motor (103).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322502037.1U CN220768308U (en) | 2023-09-14 | 2023-09-14 | Municipal works construction drainage device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322502037.1U CN220768308U (en) | 2023-09-14 | 2023-09-14 | Municipal works construction drainage device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220768308U true CN220768308U (en) | 2024-04-12 |
Family
ID=90604667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322502037.1U Active CN220768308U (en) | 2023-09-14 | 2023-09-14 | Municipal works construction drainage device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220768308U (en) |
-
2023
- 2023-09-14 CN CN202322502037.1U patent/CN220768308U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111424801B (en) | A drainage device for municipal administration sewage is collected | |
CN212899165U (en) | Anti-blocking water pump | |
CN208121732U (en) | A kind of oil slick collecting device | |
CN212670786U (en) | Road drainage ditch with good drainage effect | |
CN220768308U (en) | Municipal works construction drainage device | |
CN213477103U (en) | Integrated intelligent sewage intercepting well | |
CN219175415U (en) | Hydraulic engineering construction drainage device | |
CN214714861U (en) | Water control device special for coal geological engineering | |
CN214914103U (en) | Anti-silting lifting device for inverted siphon | |
CN115897698A (en) | Reservoir underwater walking type sludge suction and discharge device | |
CN108301391A (en) | A kind of oil slick collecting device | |
CN114712918A (en) | Sludge scraper with flow grating for sewage treatment | |
CN210286948U (en) | High-efficient sewage treatment device | |
CN219547716U (en) | Silt cleaning equipment for hydraulic engineering | |
CN112777683A (en) | Foam absorbing machine | |
CN216238861U (en) | Water supply and drainage anti-clogging device for building | |
CN214884195U (en) | Town road drainage structures | |
CN220352928U (en) | River course is administered desilting device | |
CN219195794U (en) | Waterproof drainage device for water conservancy construction | |
CN219732935U (en) | Hair collection mechanism for swimming pool purification | |
CN205391891U (en) | Filtration system before self -cleaning pump | |
CN212270981U (en) | Sump pit device for water drainage in water pipeline construction | |
CN220928160U (en) | Building site ponding drainage device | |
CN219119438U (en) | Deep well submersible pump | |
CN114562016B (en) | Integrated sewage lifting pump station |
Legal Events