CN220644715U - Install masonry structure of hanging blue brick dry wall - Google Patents

Install masonry structure of hanging blue brick dry wall Download PDF

Info

Publication number
CN220644715U
CN220644715U CN202321809129.8U CN202321809129U CN220644715U CN 220644715 U CN220644715 U CN 220644715U CN 202321809129 U CN202321809129 U CN 202321809129U CN 220644715 U CN220644715 U CN 220644715U
Authority
CN
China
Prior art keywords
concrete structure
dry wall
green
ceiling concrete
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321809129.8U
Other languages
Chinese (zh)
Inventor
陆建彬
沈耀
张阳凯
王林峰
王浩玲
赵佳鑫
俞文泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Runtai Construction And Installation Engineering Co ltd
Original Assignee
Nantong Runtai Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Runtai Construction And Installation Engineering Co ltd filed Critical Nantong Runtai Construction And Installation Engineering Co ltd
Priority to CN202321809129.8U priority Critical patent/CN220644715U/en
Application granted granted Critical
Publication of CN220644715U publication Critical patent/CN220644715U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to the technical field of building construction and discloses a construction structure for installing a suspended green brick dry wall, which comprises a beam surface and a foundation, wherein a ceiling concrete structure is fixedly connected to the bottom of the beam surface, a plurality of green bricks are arranged at the bottom of the ceiling concrete structure, a suspension mechanism is arranged between the green bricks and the ceiling concrete structure, the foundation is positioned below the ceiling concrete structure, the suspension mechanism comprises a steel plate, the steel plate is fixedly connected to the bottom of the ceiling concrete structure, embedded iron pieces are fixedly connected to two sides of the top of the steel plate, and the embedded iron pieces are arranged inside the ceiling concrete structure. Through the cooperation of ceiling concrete structure, suspension mechanism and green brick, can make things convenient for the workman to construct more when hanging the installation of green brick dry wall and build by laying bricks or stones and improve the efficiency of construction, can avoid splitting between dry wall and the major structure simultaneously and lead to dropping, improve the security of dry wall structure.

Description

Install masonry structure of hanging blue brick dry wall
Technical Field
The utility model relates to the technical field of building construction, in particular to a construction structure for installing a hanging green brick dry wall.
Background
The existing dry-hanging green brick dry wall masonry can be installed by means of steel frameworks in a pulling mode, in order to ensure the decoration consistency of the dry wall of the outer wall green brick, the dry wall is required to be built by the green bricks aiming at the top of a door and window opening of the outer wall, and the consistency between a window body or a door body and a wall body is ensured.
The construction mode has the advantages that the construction mode can have the reasons of infirm adhesion, temperature difference shrinkage or dynamic load and the like in the construction or later operation process, the top green brick dry wall and the main body structure can be split and fall off from the upper part, and pedestrians or objects on the lower part are injured by smashing, so that the construction mode has great potential safety hazards, and the construction mode is difficult, low in efficiency and long in construction period.
Disclosure of Invention
In order to overcome the defects, the utility model provides a mounting masonry structure for hanging a green brick dry wall, which aims to solve the problem that after the mounting masonry structure for hanging a green brick dry wall is used for a long time, the green brick dry wall and a main body structure possibly generate splitting to fall off from the upper part and injure pedestrians or objects at the lower part.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a hang green brick dry wall installation masonry structure, includes roof beam surface and ground, roof beam surface bottom fixedly connected with ceiling concrete structure, ceiling concrete structure bottom is provided with a plurality of green bricks, be provided with suspension mechanism between green brick and the ceiling concrete structure, the ground is located the ceiling concrete structure below;
the hanging mechanism comprises a steel plate, the steel plate is fixedly connected to the bottom of the ceiling concrete structure, embedded iron pieces are fixedly connected to two sides of the top of the steel plate, the embedded iron pieces are arranged inside the ceiling concrete structure, a plurality of T-shaped iron piece clamping strips are fixedly connected to the bottom of the steel plate, and grooves are formed in two sides of the green brick.
As a further description of the above technical solution:
the grooves are distributed in a staggered mode in sequence along the horizontal direction, and two adjacent T-shaped iron sheet clamping strips are arranged in a length-to-length mode.
As a further description of the above technical solution:
the model of the ceiling concrete structure is 300 # concrete.
As a further description of the above technical solution:
a reserved seam is formed between two adjacent green bricks, and the two adjacent green bricks are connected through pouring brick seam mortar.
As a further description of the above technical solution:
the bottom of the T-shaped iron sheet clamping strip is positioned in the groove, and the outer side of the T-shaped iron sheet clamping strip is arranged in the reserved seam.
As a further description of the above technical solution:
and a brick joint pointing agent is arranged at the bottom between two adjacent green bricks.
As a further description of the above technical solution:
the thickness and the height of the groove are 10mm.
The utility model has the following beneficial effects:
according to the utility model, through the cooperation of the ceiling concrete structure, the hanging mechanism and the green bricks, the construction of workers can be more convenient when the green brick-hanging dry wall is installed and built, the operation difficulty of the workers in construction is reduced, the construction efficiency is improved, meanwhile, the dry wall after being built and the beam surface can be hung and installed together, the drop caused by cracking between the dry wall and the main body structure is prevented, and the safety of the dry wall structure is improved.
Drawings
FIG. 1 is a perspective view of a hanging green brick dry wall mounting masonry structure in accordance with the present utility model;
FIG. 2 is a schematic diagram of a T-shaped iron sheet clamping strip structure of a hanging green brick dry wall mounting masonry structure;
fig. 3 is an enlarged view at a in fig. 2.
Legend description:
1. a ceiling concrete structure; 2. a suspension mechanism; 201. a steel plate; 202. pre-burying an iron piece; 203. t-shaped iron sheet clamping strips; 204. a groove; 3. green bricks; 4. reserving a seam; 5. brick joint mortar; 6. brick joint pointing agent; 7. a beam surface; 8. and (3) foundation.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, one embodiment provided by the present utility model is: the utility model provides a hang green brick dry wall installation masonry structure, including roof beam 7 and ground 8, roof beam 7 is the back timber of door opening or window opening, hang the dry wall that builds in by means of hanging mechanism 2 in the bottom surface of crossbeam, avoid the dry wall to drop, ground 8 is the ground plane of door opening, or the portion of the sill top surface of window opening, door frame or window frame are installed between ground 8 top and green brick 3 bottom, roof beam 7 bottom fixedly connected with roof concrete structure 1, roof beam 7 and roof concrete structure 1 are fixed together with the characteristic after the concrete solidification, roof concrete structure 1 bottom is provided with a plurality of green bricks 3, green bricks 3 are the main part that constitutes the dry wall, be provided with hanging mechanism 2 between green bricks 3 and the roof concrete structure 1, hanging mechanism 2 can hang the dry wall that builds in, avoid the wall that builds in building to drop because of the fracture and injure pedestrian or article, ground 8 is located below roof concrete structure 1;
the hanging mechanism 2 comprises a steel plate 201, the steel plate 201 is fixedly connected to the bottom of the ceiling concrete structure 1, the two sides of the top of the steel plate 201 are fixedly connected with embedded iron pieces 202, the embedded iron pieces 202 are media connected between the steel plate 201 and the ceiling concrete structure 1, meanwhile, the steel plate 201 and the embedded iron pieces 202 are the bearing main bodies of the hanging mechanism 2 hanging a dry wall, the characteristics of steel materials and iron materials are utilized, the bearing capacity of the hanging mechanism 2 is improved, the dry wall is stably hung, the embedded iron pieces 202 are arranged inside the ceiling concrete structure 1, the embedded iron pieces 202 can be fixed with the ceiling concrete structure 1 through embedding, or after the ceiling concrete structure 1 is constructed, the embedded iron pieces 202 are fixed inside the ceiling concrete structure 1 through expansion bolts, a plurality of T-shaped iron piece clamping strips 203 are fixedly connected to the bottom of the steel plate 201, grooves 204 are formed in two sides of the T-shaped iron piece clamping strips 203 through brick joint mortar 5 under the hanging mechanism 2, the grooves 204 are formed in two sides of the green brick 3, the green brick 3 are matched with the T-shaped iron piece clamping strips 203, the green brick 3 can be hung on the bottom of the brick 3 by means of the grooves, and the green brick 3 can be sequentially attached to the brick 3, and the green brick 3 can be prevented from being sequentially attached to the brick 3, and the brick 3 can be simultaneously attached to the brick 3 can be prevented from being attached to the brick 3 by the brick 3, and the brick 3 is not required to be sequentially attached to the brick 3 by the brick 3, and the brick is required to be sequentially attached to the brick 3.
The grooves 204 are distributed in a staggered manner along the horizontal direction, two adjacent T-shaped iron sheet clamping strips 203 are arranged in a long and short manner, and the staggered grooves 204 can ensure that each green brick 3 can bear more pressure as much as possible when being stressed.
The model of the ceiling concrete structure 1 is 300 # concrete, and the 300 # concrete is the optimal choice in terms of cost while ensuring that the strength of the poured ceiling concrete structure 1 is enough to support the dry wall.
A reserved seam 4 is arranged between two adjacent green bricks 3, the two adjacent green bricks 3 are connected through pouring brick seam mortar 5, the brick seam mortar 5 for building the green bricks 3 is filled in the reserved seam 4, the gap between each green brick 3 can be filled after the brick seam mortar 5 is solidified, and each green brick 3 is bonded and fixed together.
T shape iron sheet card strip 203 bottom is located inside recess 204, and the T shape iron sheet card strip 203 outside sets up inside reserving the seam 4, through utilizing the block between recess 204 and the T shape iron sheet card strip 203 of seting up on the celadon 3 for every T shape iron sheet card strip 203 can both play the effect of hanging the support to two adjacent celadon 3, after avoiding fracture between celadon 3 and the brick seam mortar 5, can lead to dropping between the celadon 3, improves the stability of dry wall.
The bottom is provided with brick seam pointing agent 6 between two adjacent green bricks 3, through with brick seam mortar 5 with green bricks 3 build in the back of hanging mechanism 2, the workman utilizes brick seam pointing agent 6 to fill the gap between the green bricks 3, guarantees that the inside and outside two sides of the dry wall that builds by laying a brick are all very level, and is more pleasing to the eye.
The thickness and the height of the groove 204 are 10mm, and the size of 10mm ensures that the T-shaped iron sheet clamping strip 203 can be hung, and meanwhile, the structural strength of the brick 3 is not reduced due to the fact that two grooves 204 are formed.
Working principle: two embedded iron pieces 202 are fixed on a steel plate 201 in a welding mode, a die for pouring the ceiling concrete structure 1 is fixed at the bottom of a beam surface 7, the welded steel plate 201 and the embedded iron pieces 202 are placed at the bottom of the die, the 300 # concrete mixed well is poured into the die, and the poured concrete is cured to form the ceiling concrete structure 1, so that the embedded iron pieces 202 can be fixed inside the ceiling concrete structure 1, and the die is detached. After the householder finishes pouring the ceiling concrete structure 1 in advance, the steel plate 201 and the embedded iron piece 202 are welded and fixed together, then a worker sets two through holes on the bottom of the ceiling concrete structure 1 through drilling equipment, and the embedded iron piece 202 is fixed in the set through holes by using expansion bolts. According to the size of the installed door frame or window frame, selecting a proper size of the green brick 3, or cutting the green brick 3 into a proper size by an electric cutting machine, adjusting the distance between two adjacent T-shaped iron sheet clamping strips 203 according to the size of the selected green brick 3, welding the T-shaped iron sheet clamping strips 203 to the bottom of the steel plate 201, cutting grooves 204 at two sides of the green brick 3 in unequal intervals by the electric cutting machine, inserting the green brick 3 with the grooves 204 outside the T-shaped iron sheet clamping strips 203, attaching brick joint mortar 5 outside the green brick 3, sequentially laying the green bricks 3 with the grooves 204 at the bottom of the steel plate 201 by using a supporting tool, supporting the bottom of the green brick 3, adjusting the position between each green brick 3, finally filling gaps between the green bricks 3 by using a brick joint pointing agent 6, ensuring that the laid green bricks 3 are in a flat state, removing a supporting tool at the bottom of the green brick 3 after the brick joint mortar 5 between the green bricks 3 is solidified, and finishing the work of laying a dry wall or installing the dry wall at the bottom of the window frame.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. The utility model provides a hang green brick dry wall installation masonry structure, includes roof beam face (7) and ground (8), its characterized in that: the bottom of the beam surface (7) is fixedly connected with a ceiling concrete structure (1), a plurality of green bricks (3) are arranged at the bottom of the ceiling concrete structure (1), a suspension mechanism (2) is arranged between the green bricks (3) and the ceiling concrete structure (1), and the foundation (8) is positioned below the ceiling concrete structure (1);
the hanging mechanism (2) comprises a steel plate (201), the steel plate (201) is fixedly connected to the bottom of the ceiling concrete structure (1), embedded iron pieces (202) are fixedly connected to two sides of the top of the steel plate (201), the embedded iron pieces (202) are arranged inside the ceiling concrete structure (1), a plurality of T-shaped iron piece clamping strips (203) are fixedly connected to the bottom of the steel plate (201), and grooves (204) are formed in two sides of the green bricks (3).
2. A suspended green brick dry wall mounting masonry structure according to claim 1, wherein: the grooves (204) are distributed in a staggered mode in sequence along the horizontal direction, and two adjacent T-shaped iron sheet clamping strips (203) are arranged in a length-to-length mode.
3. A suspended green brick dry wall mounting masonry structure according to claim 1, wherein: the model of the ceiling concrete structure (1) is 300 # concrete.
4. A suspended green brick dry wall mounting masonry structure according to claim 1, wherein: a reserved seam (4) is formed between every two adjacent green bricks (3), every two adjacent green bricks (3) are connected through pouring brick seam mortar (5), and the outer sides of the T-shaped iron sheet clamping strips (203) are arranged inside the reserved seam (4).
5. A suspended green brick dry wall mounting masonry structure according to claim 1, wherein: the bottom of the T-shaped iron sheet clamping strip (203) is positioned in the groove (204).
6. A suspended green brick dry wall mounting masonry structure according to claim 1, wherein: a brick joint pointing agent (6) is arranged at the bottom between two adjacent green bricks (3).
7. A suspended green brick dry wall mounting masonry structure according to claim 1, wherein: the thickness and height of the grooves (204) are 10mm.
CN202321809129.8U 2023-07-11 2023-07-11 Install masonry structure of hanging blue brick dry wall Active CN220644715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321809129.8U CN220644715U (en) 2023-07-11 2023-07-11 Install masonry structure of hanging blue brick dry wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321809129.8U CN220644715U (en) 2023-07-11 2023-07-11 Install masonry structure of hanging blue brick dry wall

Publications (1)

Publication Number Publication Date
CN220644715U true CN220644715U (en) 2024-03-22

Family

ID=90294566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321809129.8U Active CN220644715U (en) 2023-07-11 2023-07-11 Install masonry structure of hanging blue brick dry wall

Country Status (1)

Country Link
CN (1) CN220644715U (en)

Similar Documents

Publication Publication Date Title
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN105781099A (en) Movable combined type one-sided large template structure and construction method thereof
CN104947846B (en) A kind of prefabricated integral frame light filling lining and preparation method thereof
CN109235702B (en) Assembled double-steel-plate combined shear wall structure with ribs and construction method thereof
CN110409860A (en) A kind of reconstruction structure and its remodeling method in old house
CN111287370A (en) Externally-hung glass curtain wall system and construction method thereof
CN107747367A (en) A kind of autoclaved lightweight sand aerated concrete(AAC)Sheet material construction method
CN111236416A (en) Prefabricated reinforced concrete structure house and installation method thereof
CN213927071U (en) Simple and easy angle steel lintel strutting arrangement
CN214530776U (en) Can have enough to meet need independent strutting arrangement
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN220644715U (en) Install masonry structure of hanging blue brick dry wall
CN207048309U (en) A kind of top plate Quick Release support system
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
CN208843546U (en) A kind of structure adjusting stairway shaft length
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN116623831A (en) Mounting and masonry structure for hanging green brick dry wall and method thereof
CN107386638B (en) The construction method of cast-in-place Decorative hanging board structure under a kind of beam
CN212670813U (en) Hanging type integrated environment-friendly outer wall structure is inlayed to assembly type for building
CN216516343U (en) Structure integration exempts from to tear open prefabricated hollow wall of mould
CN215484618U (en) A pour template structure for assembled shear force wall and post
CN102251671B (en) Exterior heat insulation on-site construction process of exterior wall based on foaming cement material
CN205188977U (en) A trade and prop construction structures that is used for large -scale foundation ditch to demolish first way fast supporting
CN213573164U (en) Ancient building clear water wall body migration bottom reinforcing apparatus
CN110593440B (en) Construction method of prefabricated wall structure