CN220599193U - PVC (polyvinyl chloride) shaping hanging hole construction mechanism - Google Patents

PVC (polyvinyl chloride) shaping hanging hole construction mechanism Download PDF

Info

Publication number
CN220599193U
CN220599193U CN202322115900.8U CN202322115900U CN220599193U CN 220599193 U CN220599193 U CN 220599193U CN 202322115900 U CN202322115900 U CN 202322115900U CN 220599193 U CN220599193 U CN 220599193U
Authority
CN
China
Prior art keywords
pvc
baffle
hole construction
hanging hole
construction mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322115900.8U
Other languages
Chinese (zh)
Inventor
任冰心
姜林秀
王剑
孙伟亮
梁龙
孙运臣
曲超
周悦龙
李涛
李树敬
宋海霞
明茂刚
马宏伟
张万国
赵宗奎
亓守臣
辛乐清
王晓勇
胡晋春
孔令林
段浩
苏凤涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN202322115900.8U priority Critical patent/CN220599193U/en
Application granted granted Critical
Publication of CN220599193U publication Critical patent/CN220599193U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a PVC (polyvinyl chloride) shaping hanging hole construction mechanism which comprises baffle plates which are symmetrically arranged and are tightly matched with a pipeline and used for blocking a pipeline opening, wherein a sleeve is arranged at the lower end of the baffle plate, and a base plate is arranged on the inner wall of the sleeve. When the downpipe pipeline opening is plugged, the symmetrical baffle plates are sleeved on the downpipe and spliced into a whole, the upper surfaces of the baffle plates are in contact with the bottom of the opening, then concrete pouring is carried out, and then the baffle plates are taken down. The mounting and dismounting are convenient, the device can be repeatedly used, and the material waste is reduced.

Description

PVC (polyvinyl chloride) shaping hanging hole construction mechanism
Technical Field
The utility model relates to the technical field of building construction, in particular to a PVC (polyvinyl chloride) shaping hanging hole construction mechanism.
Background
In the house construction process, after the water supply and drainage downpipe is installed, closing-up treatment is carried out on the gap of the completed downpipe hole opening, according to the traditional method, an old template is adopted for sealing the pipeline hole opening and is processed according to the size of the hole opening, a square or steel pipe is adopted for supporting the bottom, the template mold is inconvenient to install and detach, labor is wasted, and the service time and the renting cost of materials are increased.
Disclosure of Invention
The utility model aims to solve the problems and provide the PVC shaping hanging hole construction mechanism which is convenient to install and detach, can be reused and reduces material waste.
The technical scheme adopted for solving the technical problems is as follows:
the utility model provides a PVC regularization hangs hole construction mechanism, is used for plugging up the baffle of pipeline entrance to a cave including the symmetry setting and with pipeline close fit, the baffle lower extreme is equipped with the sleeve, be equipped with the backing plate on the sleeve inner wall.
Further, grooves for the pipeline to pass through are formed in the inner side of the baffle, and the grooves on the two sides are spliced into round through holes.
Further, the lower end of the outer cylindrical surface of the base plate is provided with a protrusion matched with the bottom of the sleeve.
Further, the symmetrical baffles are spliced into a circular ring shape.
Further, the baffle plates are symmetrically provided with mounting blocks, and the corresponding mounting blocks on the two baffle plates are connected through bolts.
Further, pin shafts are symmetrically arranged on the baffle plate on one side, shaft sleeves are symmetrically arranged on the baffle plate on the other side, the pin shafts penetrate through the corresponding shaft sleeves, and the pin shafts are connected with the shaft sleeves through positioning pins.
The beneficial effects of the utility model are as follows:
1. the utility model comprises baffle plates which are symmetrically arranged and are tightly matched with a pipeline and used for blocking the opening of the pipeline, wherein the lower end of the baffle plate is provided with a sleeve, and the inner wall of the sleeve is provided with a backing plate. When the downpipe pipeline opening is plugged, the symmetrical baffle plates are sleeved on the downpipe and spliced into a whole, the upper surfaces of the baffle plates are in contact with the bottom of the opening, then concrete pouring is carried out, and then the baffle plates are taken down. The mounting and dismounting are convenient, the device can be repeatedly used, and the material waste is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are required to be used in the description of the embodiments or the prior art will be briefly described below, and it will be obvious to those skilled in the art that other drawings can be obtained from these drawings without inventive effort.
FIG. 1 is a schematic diagram of a first embodiment of the present utility model;
FIG. 2 is a schematic diagram of a second embodiment of the present utility model;
fig. 3 is a schematic structural diagram of a second embodiment of the present utility model.
In the figure: baffle 1, sleeve 2, backing plate 3, protruding 4, installation piece 5, bolt 6, round pin axle 7, axle sleeve 8, locating pin 9.
Detailed Description
In order to make the technical solution of the present utility model better understood by those skilled in the art, the technical solution of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present utility model without making any inventive effort, shall fall within the scope of the present utility model.
Embodiment one:
as shown in fig. 1 and 2, a PVC (polyvinyl chloride) shaping hanging hole construction mechanism comprises baffle plates 1 which are symmetrically arranged and are tightly matched with a pipeline and used for blocking a pipeline opening, wherein sleeve plates 2 are arranged at the lower ends of the baffle plates 1, and backing plates 3 are arranged on the inner walls of the sleeve plates 2. When the downpipe pipeline opening is plugged, the symmetrical baffle plates 1 are sleeved on the downpipe and spliced into a whole, the upper surfaces of the baffle plates 1 are in contact with the bottom of the opening, concrete pouring is carried out, C20 fine stones are adopted for construction, one opening is poured for 2 times, half of the opening is poured for the first time, and vibration is compact. And after the strength of the first layer of concrete reaches, performing second layer casting, wherein the second layer casting is 0.5-1 cm lower than the first layer casting, and the surface is smeared with solid calendaring. And then the baffle plate 1 is taken down, compared with the traditional method, the PVC shaping hanging hole construction mould can effectively accelerate the construction progress under the same condition, reduce various management cost and ensure the construction quality. The mounting and dismounting are convenient, the device can be repeatedly used, and the material waste is reduced.
The backing plate 3 with different thickness can be replaced according to different pipeline diameters, and the application range is wide.
As shown in fig. 1, the inner side of the baffle plate 1 is provided with grooves for the pipeline to pass through, and the grooves on two sides are spliced into circular through holes.
As shown in fig. 2, the lower end of the outer cylindrical surface of the backing plate 3 is provided with a bulge 4 matched with the bottom of the sleeve 2, so that the bearing capacity of the baffle is improved, and the backing plate 3 is prevented from being separated from the sleeve 2 after concrete is poured.
As shown in fig. 2, the symmetrical baffle plates 1 are spliced into a circular ring shape.
The symmetry all symmetry be equipped with installation piece 5 on baffle 1, the installation piece 5 that corresponds on two baffles 1 passes through bolted connection 6, all is equipped with the fluting on the installation piece 5, and bolted connection 6 is located the fluting, and bolted connection 6 one end and one side baffle 1's installation piece 5 rotate to be connected, and bolted connection 6 other end passes through the nut with the installation piece 5 of the other side baffle 1.
Embodiment two:
as shown in fig. 3, pin shafts 7 are symmetrically arranged on the baffle plate 1 on one side, shaft sleeves 8 are symmetrically arranged on the baffle plate 1 on the other side, the pin shafts 7 penetrate through the corresponding shaft sleeves 8, and the pin shafts 7 are connected with the shaft sleeves 8 through positioning pins 9. When the baffles are spliced into a circular baffle, the pin shafts 7 penetrate through the corresponding shaft sleeves 8 and are connected through the positioning pins 9, so that the fixation of the two baffles is realized.
In describing the present utility model, it should be noted that the azimuth or positional relationship indicated by the terms "left", "right", "upper", "lower", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element referred to must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; the two components can be connected mechanically or electrically, can be connected directly or indirectly through an intermediate medium, and can be communicated inside the two components. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.

Claims (6)

1. The utility model provides a PVC regularization hangs hole construction mechanism, its characterized in that, including symmetry setting and with pipeline close fit be used for plugging up baffle (1) of pipeline entrance to a cave, baffle (1) lower extreme is equipped with sleeve (2), be equipped with backing plate (3) on sleeve (2) inner wall.
2. The PVC modular hanging hole construction mechanism as claimed in claim 1, wherein grooves for the pipeline to pass through are formed in the inner side of the baffle plate (1), and the grooves on the two sides are spliced into circular through holes.
3. The PVC modular hanging hole construction mechanism as claimed in claim 1, wherein the lower end of the outer cylindrical surface of the backing plate (3) is provided with a protrusion (4) matched with the bottom of the sleeve (2).
4. A PVC shaped hanging hole construction mechanism as claimed in claim 1, wherein the symmetrical baffles (1) are spliced into a circular shape.
5. The PVC modular hanging hole construction mechanism as claimed in claim 4, wherein the symmetrical baffle plates (1) are symmetrically provided with mounting blocks (5), and the corresponding mounting blocks (5) on the two baffle plates (1) are connected through bolts (6).
6. The PVC shaping hanging hole construction mechanism as claimed in claim 4, wherein pin shafts (7) are symmetrically arranged on the baffle plate (1) on one side, shaft sleeves (8) are symmetrically arranged on the baffle plate (1) on the other side, the pin shafts (7) penetrate through the corresponding shaft sleeves (8), and the pin shafts (7) are connected with the shaft sleeves (8) through positioning pins (9).
CN202322115900.8U 2023-08-08 2023-08-08 PVC (polyvinyl chloride) shaping hanging hole construction mechanism Active CN220599193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322115900.8U CN220599193U (en) 2023-08-08 2023-08-08 PVC (polyvinyl chloride) shaping hanging hole construction mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322115900.8U CN220599193U (en) 2023-08-08 2023-08-08 PVC (polyvinyl chloride) shaping hanging hole construction mechanism

Publications (1)

Publication Number Publication Date
CN220599193U true CN220599193U (en) 2024-03-15

Family

ID=90177957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322115900.8U Active CN220599193U (en) 2023-08-08 2023-08-08 PVC (polyvinyl chloride) shaping hanging hole construction mechanism

Country Status (1)

Country Link
CN (1) CN220599193U (en)

Similar Documents

Publication Publication Date Title
CN220599193U (en) PVC (polyvinyl chloride) shaping hanging hole construction mechanism
CN211054059U (en) Prefabricated cement pipe die
CN114134939A (en) Resin-based high-polymer composite well lid and production process thereof
CN213952432U (en) Portable prefabricated inspection well template that can install fast and tear open
CN209775017U (en) High-efficient prefabricated inlet for stom water mould
CN110539397B (en) Tubular pile residual slurry recovery device
CN209990152U (en) Opening-closing type pouring opening structure
CN209873155U (en) Hard chromium electroplating device for roller
CN221030545U (en) Drainage inspection shaft chute template
CN221095204U (en) Assembled drainage inspection shaft pouring template device
CN220814166U (en) Cast-in-place concrete inspection shaft entrance to a cave pouring device
CN220927855U (en) Steel form plugging system
CN220486683U (en) Template structure for cast-in-situ of concrete rain and sewage drainage well
CN204525723U (en) A kind of particular manufacturing craft of processing cable ditch prefabricated component
CN220202936U (en) A discharge port prevents stifled device for municipal wastewater treatment
CN221391507U (en) Template for water conservancy construction
CN215288109U (en) Chelate type coagulation reaction device
CN220517113U (en) Multi-connection mould for precast concrete round piles
CN220365114U (en) Special frame pipe for installing round mould in well chamber of drainage inspection well
CN215618928U (en) Concrete placement setting device for building
CN213038431U (en) Inspection well steel mould
CN213953008U (en) Steel column concrete pours auxiliary device fast
CN212715397U (en) Novel special mould instrument that hangs of construction pipeline entrance to a cave shutoff
CN213926607U (en) Convenient multistage formula inspection shaft steel form
CN217345992U (en) Six arriss of precast concrete piece shedder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant