CN220514073U - Putty powder production equipment of preparing - Google Patents

Putty powder production equipment of preparing Download PDF

Info

Publication number
CN220514073U
CN220514073U CN202321940733.4U CN202321940733U CN220514073U CN 220514073 U CN220514073 U CN 220514073U CN 202321940733 U CN202321940733 U CN 202321940733U CN 220514073 U CN220514073 U CN 220514073U
Authority
CN
China
Prior art keywords
symmetrically
preparation
putty powder
powder production
sliding grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321940733.4U
Other languages
Chinese (zh)
Inventor
徐孝剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Yancai New Building Materials Co ltd
Original Assignee
Shaoxing Yancai New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Yancai New Building Materials Co ltd filed Critical Shaoxing Yancai New Building Materials Co ltd
Priority to CN202321940733.4U priority Critical patent/CN220514073U/en
Application granted granted Critical
Publication of CN220514073U publication Critical patent/CN220514073U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mixers Of The Rotary Stirring Type (AREA)

Abstract

The utility model relates to the technical field of putty powder production, and particularly discloses putty powder production and preparation equipment, which comprises a preparation machine, wherein the surface of the preparation machine is hinged with an organic door, a time relay is symmetrically and fixedly arranged on the side wall of the preparation machine, a motor and a discharge hole are respectively and fixedly arranged on the side wall of the preparation machine, first sliding grooves are symmetrically arranged in the preparation machine, first sliding blocks are symmetrically and slidingly arranged in the two first sliding grooves, a baffle plate is fixedly arranged at the lower end part of each first sliding block, first springs are symmetrically and fixedly arranged in the two first sliding grooves, and the motor drives a rotating column to rotate positively and negatively within a specified time by utilizing the time relay, so that the baffle plate can intermittently convey materials of a feed inlet, the baffle plate can avoid waste caused by the fact that the baffle plate floats about the materials and does not enter the inside of a preparation stirring box when the materials are intermittently conveyed by utilizing the baffle plate, and the baffle plate can be disassembled and cleaned conveniently due to the fact that the baffle plate is in threaded installation.

Description

Putty powder production equipment of preparing
Technical Field
The utility model relates to the technical field of putty powder production, in particular to putty powder production and preparation equipment.
Background
The production and preparation of the putty powder generally comprises the steps of raw material preparation, mixing, water adding and blending and the like to finish the production of the putty powder, and in the production of the putty powder, "preparation" refers to the accurate selection and mixing of various raw materials according to a formula so as to obtain the required product performance and characteristics. The method comprises the steps of determining the types, the proportions and the processing methods of raw materials, and mixing, adjusting and processing according to a certain technological process to finally obtain the putty powder product meeting the requirements.
However, when the existing putty powder is produced and prepared, the materials are poured into the feeding hole at one time to enter the preparation stirring box for stirring uniformly, so that the putty powder is difficult to mix uniformly in a short time when a large amount of materials are poured at one time, and meanwhile, a great burden is added to the fan blades in the preparation stirring box, so that the fan blades cannot rotate.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides putty powder production and preparation equipment, which solves the technical problems that the putty powder is difficult to uniformly mix in a short time due to the fact that a large amount of materials are poured into the existing device at one time, and the blades cannot rotate due to the fact that a large amount of materials enter a preparation stirring box to increase huge burden on the inner stirring blades.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme:
the putty powder production and preparation equipment comprises a preparation machine, wherein the surface of the preparation machine is hinged with an organic door, time relays are symmetrically and fixedly arranged on the side wall of the preparation machine, a motor and a discharge hole are fixedly arranged on the side wall of the preparation machine respectively, a water pump is fixedly arranged on the side wall of the preparation machine, which is far away from the discharge hole, the upper end part of the preparation machine is fixedly provided with a feed inlet, and a placing groove is formed in the preparation machine in a penetrating manner;
a blocking mechanism is arranged in the placing groove in a threaded manner;
the blocking mechanism comprises a baffle plate, the baffle plate is positioned below the feed inlet, a preparation stirring box is fixedly arranged in the preparation machine, and first sliding grooves are symmetrically formed in the preparation machine;
the first sliding blocks are symmetrically and slidably arranged in the two first sliding grooves.
Preferably: a baffle plate is fixedly arranged at the lower end part of each first sliding block, and first springs are symmetrically and fixedly arranged in the two first sliding grooves;
each first spring is fixedly installed with the first sliding block.
Preferably: u-shaped blocks are symmetrically and fixedly arranged at the lower end part of the partition board, and a rotating column is rotatably arranged in the preparation machine;
wherein, the output shaft fixed mounting of swivel post and motor.
Preferably: clamping rods are symmetrically and fixedly arranged on the circumferential surface of the rotary column;
wherein, two U-shaped piece inner wall symmetry have offered the second spout.
Preferably: third sliding grooves are symmetrically formed in the inner walls of the two U-shaped blocks, and each third sliding groove is located between the second sliding grooves;
and each second sliding groove is internally and symmetrically and fixedly provided with a second spring.
Preferably: a clamping plate is slidably arranged between each third chute and each second chute;
wherein, two the cardboard is all with second spring fixed mounting.
(III) beneficial effects
1. The clamping rod on the rotary column is rotated by starting the motor, the first sliding block and the partition plate move towards the first spring direction, the partition plate is driven to move to cancel shielding of materials inside the feed inlet, meanwhile, due to the time relay, the motor can rotate forwards and backwards in a specified time, intermittent conveying of materials inside the feed inlet can be completed, the problem that when materials are stacked excessively at one time to cause stirring, the materials are required to be uniformly stirred for a long time during stirring is avoided, and meanwhile, the problem that the materials are not operated due to the fact that the burden brought to the fan blades inside the stirring box is conveyed at one time due to the fact that more materials are stacked excessively at one time is avoided.
2. The baffle is installed through the screw thread, so that the baffle can avoid the impact of the baffle on the material when intermittently conveying the material, the material does not enter the stirring box to cause waste, the baffle can be detached through the screw thread installed between the baffle and the preparation machine, and the baffle is convenient to clean the residual material on the baffle and is more convenient.
Drawings
The foregoing description is only an overview of the present utility model, and is intended to provide a better understanding of the present utility model, as it is embodied in the following description, with reference to the preferred embodiments of the present utility model and the accompanying drawings.
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a perspective exploded view of the present utility model;
FIG. 3 is a diagram of a water pump connection explosion structure of the present utility model;
FIG. 4 is a diagram of a bulkhead connection explosion configuration of the present utility model;
fig. 5 is a diagram of the explosion structure of the U-shaped block connection of the present utility model.
Legend description: 11. a preparation machine; 12. a gate; 13. a time relay; 14. a motor; 15. a discharge port; 16. a water pump; 17. a feed inlet; 18. a placement groove; 19. a baffle; 21. preparing a stirring box; 22. a first chute; 23. a first slider; 24. a partition plate; 25. a first spring; 26. a U-shaped block; 27. a rotating column; 28. a clamping rod; 29. a second chute; 31. a third chute; 32. a second spring; 33. and (5) clamping plates.
Detailed Description
This embodiment of the utility model is through providing a putty powder production equipment of preparing, the one-off pouring a large amount of materials of current device and lead to putty powder to be difficult to in the short time misce bene and a large amount of materials get into and prepare stirring box in for internal stirring flabellum increase huge burden and lead to the unable pivoted technical problem of flabellum, make the kelly on the revolving post rotate through opening the motor, make first slider and baffle remove to first spring direction, thereby drive the baffle and remove and cancel the shielding to feed inlet internal material, simultaneously because of time relay's reason, can make the motor carry out the positive and negative rotation in the stipulated time, can accomplish simultaneously and carry out intermittent type to the material of feed inlet inside and carry out intermittent type and carry, avoid when preparing because the material is piled up too much once and need long time to carry out even stirring to the material when leading to the stirring, simultaneously also can avoid because more material is carried once to prepare the burden that stirring box internal flabellum brings, and lead to unable operation and can avoid the striking of material when carrying the material to cause material not getting into to prepare stirring box inside through screw thread installation baffle, and can dismantle the baffle through the screw thread can be carried on comparatively convenient baffle.
Examples
The technical scheme in this application embodiment is for having effectively solved current device disposable pouring a large amount of materials and lead to putty powder to be difficult to the misce bene in the short time and a large amount of materials get into and prepare stirring box in for inside stirring flabellum increase huge burden and lead to the unable pivoted technical problem of flabellum, and the overall thinking is as follows:
aiming at the problems existing in the prior art, the utility model provides putty powder production and preparation equipment, which comprises a preparation machine 11, wherein the surface of the preparation machine 11 is hinged with an organic door 12, time relays 13 are symmetrically and fixedly arranged on the side wall of the preparation machine 11, a motor 14 and a discharge hole 15 are respectively and fixedly arranged on the side wall of the preparation machine 11, a water pump 16 is fixedly arranged on the side wall of the preparation machine 11, which is far away from the discharge hole 15, the upper end part of the preparation machine 11 is fixedly provided with a feed inlet 17, and a placing groove 18 is formed in the preparation machine 11 in a penetrating manner;
a blocking mechanism is arranged in the placing groove 18 in a threaded manner;
the blocking mechanism comprises a baffle 19, the baffle 19 is positioned below the feed inlet 17, a preparation stirring box 21 is fixedly arranged in the preparation machine 11, first sliding grooves 22 are symmetrically formed in the preparation machine 11, first sliding blocks 23 are symmetrically and slidingly arranged in the two first sliding grooves 22, a motor 14 drives a rotary column 27 to rotate positively and negatively within a specified time by utilizing a time relay 13, so that a baffle 24 can intermittently convey materials of the feed inlet 17, the baffle 19 can avoid waste caused by the fact that the baffle 24 bumps the materials to cause the materials to float randomly and do not enter the preparation stirring box 21 when the materials are intermittently conveyed, and the baffle 19 can be disassembled due to threaded installation, so that the cleaning is convenient.
The lower end part of each first sliding block 23 is fixedly provided with a baffle plate 24, the interiors of the two first sliding grooves 22 are symmetrically and fixedly provided with first springs 25, each first spring 25 is fixedly provided with the first sliding block 23, the baffle plates 24 slide in the first sliding grooves 22 through the fixed installation of the first sliding blocks 23 and the baffle plates 24, and clamping rods 28 on the rotating columns 27 can be automatically reset through the fixed installation of the first springs 25 and the first sliding blocks 23, so that reciprocating intermittent conveying of materials is completed.
The U-shaped blocks 26 are symmetrically and fixedly arranged at the lower end part of the partition plate 24, the rotary column 27 is rotatably arranged in the preparation machine 11, the rotary column 27 is fixedly arranged with the output shaft of the motor 14, and the rotary column 27 is driven to rotate through the fixed arrangement of the motor 14 and the rotary column 27, so that intermittent movement of the partition plate 24 is realized for conveying materials.
Clamping rods 28 are symmetrically and fixedly arranged on the circumferential surface of the rotating column 27, second sliding grooves 29 are symmetrically formed in the inner walls of the two U-shaped blocks 26, and the clamping rods 28 are arranged on the circumferential surface of the rotating column 27, so that the clamping rods 28 are driven to complete transmission between the U-shaped blocks 26 and clamping plates 33, and intermittent material conveying of the partition plates 24 is completed.
The third spout 31 has all been seted up to the equal symmetry of two U-shaped piece 26 inner walls, every third spout 31 all is located between the second spout 29, every second spout 29 inside equal symmetrical fixed mounting has second spring 32, equal slidable mounting has cardboard 33 between every third spout 31 and the second spout 29, two cardboard 33 all are with second spring 32 fixed mounting, because the rotation of card pole 28 is the shape of a circle, when making card pole 28 anticlockwise to cardboard 33 below, make cardboard 33 compress under the effect of second spring 32, utilize time relay to drive card pole 28 and reverse can also make second spring 32 drive cardboard 33 reset simultaneously.
Working principle:
in the first step, when the machine door 12 is used, firstly, the machine door 12 can be closed firstly, then cement, lime and other materials can be poured into the feed inlet 17 respectively, at this time, the motor 14 can be started, the turning on of the motor 14 drives the rotary column 27 to rotate, at this time, the clamping rod 28 on the rotary column 27 contacts with the clamping plate 33 arranged in the U-shaped block 26, and drives the U-shaped block 26 to rotate towards one side of the first spring 25, and simultaneously drives the first spring 25 to compress, so that the first sliding block 23 slides in the first sliding groove 22, and meanwhile drives the partition plate 24 to move, at this time, the materials in the feed inlet 17 are downwards conveyed due to the movement of the partition plate 24 (because the partition plate 24 blocks the materials in the feed inlet 17 under the condition that the partition plate 24 does not move).
In the second step, the materials enter the preparation stirring box 21, meanwhile, along with the rotation of the rotating column 27, the clamping rod 28 rotates around the rotating column 27 as the center of a circle, the clamping plate 33 is enabled to be driven to compress by the force applied to the direction of the first spring 25, the second spring 32 is driven to be compressed, meanwhile, the clamping plate 33 slides in the second sliding groove 29 and the third sliding groove 31, when the rotating column 27 rotates for 3s towards the direction of the first spring 25, the motor 14 is enabled to rotate reversely due to the reason of the time relay 13, the clamping rod 28 is enabled to be driven to be separated from the U-shaped block 26 and the clamping plate 33, the first sliding block 23 and the partition plate 24 are enabled to be reset simultaneously by the first spring 25 and the second spring 32, the conveyed materials are shielded by the partition plate 24 along with the reset of the partition plate 24, and due to the reset of the partition plate 24, some materials are enabled to collide to the side of the partition plate 24, then the materials are enabled to enter the inside the preparation stirring box 21 due to the gravity, the water pump 16 is enabled to be enabled to rotate, the preparation stirring box 21 is enabled to separate from the U-shaped block 26 and the clamping plate 33 from the clamping plate 33, and the materials can be well stirred at the time, and the materials can be well discharged and completely discharged after the materials are stirred and the materials are completely stirred.
Finally, it should be noted that: it is apparent that the above examples are only illustrative of the present utility model and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. And obvious variations or modifications thereof are contemplated as falling within the scope of the present utility model.

Claims (6)

1. The utility model provides a putty powder production equipment of preparing, includes compounding machine (11), compounding machine (11) surface hinge organic door (12), symmetrical fixed mounting has time relay (13) on compounding machine (11) lateral wall, fixed mounting has motor (14) and discharge gate (15) on compounding machine (11) lateral wall respectively, fixed mounting has water pump (16) on the lateral wall of compounding machine (11) one side of keeping away from discharge gate (15), a serial communication port, compounding machine (11) upper end fixed mounting has feed inlet (17), inside standing groove (18) of running through of compounding machine (11);
a blocking mechanism is arranged in the internal thread of the placing groove (18);
the blocking mechanism comprises a baffle (19), the baffle (19) is positioned below the feed inlet (17), a preparation stirring box (21) is fixedly arranged in the preparation machine (11), and first sliding grooves (22) are symmetrically formed in the preparation machine (11);
the two first sliding grooves (22) are symmetrically and slidably provided with first sliding blocks (23) inside.
2. The putty powder production and preparation device as set forth in claim 1, characterized in that a baffle plate (24) is fixedly installed at the lower end of each first sliding block (23), and first springs (25) are symmetrically and fixedly installed inside two first sliding grooves (22);
wherein each first spring (25) is fixedly mounted with the first slider (23).
3. The putty powder production and preparation device as set forth in claim 2, characterized in that the lower end of the partition plate (24) is symmetrically and fixedly provided with a U-shaped block (26), and a rotary column (27) is rotatably arranged in the preparation machine (11);
wherein the rotary column (27) is fixedly arranged with the output shaft of the motor (14).
4. A putty powder production and formulation apparatus as set forth in claim 3, characterized in that said rotary posts (27) are symmetrically and fixedly provided with clamping bars (28) on their circumferential surfaces;
wherein, two U-shaped piece (26) inner wall symmetry have seted up second spout (29) all.
5. The putty powder production and preparation device as set forth in claim 4, characterized in that third sliding grooves (31) are symmetrically formed in the inner walls of two U-shaped blocks (26), and each third sliding groove (31) is located between the second sliding grooves (29);
wherein, each second chute (29) is internally and symmetrically and fixedly provided with a second spring (32).
6. The putty powder production and formulation apparatus as set forth in claim 5, characterized in that a clamping plate (33) is slidably mounted between each of said third runner (31) and said second runner (29);
wherein, two cardboard (33) are all with second spring (32) fixed mounting.
CN202321940733.4U 2023-07-22 2023-07-22 Putty powder production equipment of preparing Active CN220514073U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321940733.4U CN220514073U (en) 2023-07-22 2023-07-22 Putty powder production equipment of preparing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321940733.4U CN220514073U (en) 2023-07-22 2023-07-22 Putty powder production equipment of preparing

Publications (1)

Publication Number Publication Date
CN220514073U true CN220514073U (en) 2024-02-23

Family

ID=89935692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321940733.4U Active CN220514073U (en) 2023-07-22 2023-07-22 Putty powder production equipment of preparing

Country Status (1)

Country Link
CN (1) CN220514073U (en)

Similar Documents

Publication Publication Date Title
CN105458165A (en) Sand mixer
CN211838123U (en) Water reducing agent production facility
CN220514073U (en) Putty powder production equipment of preparing
CN212915304U (en) Neodymium iron boron powder blendor
CN220026729U (en) Stirring device for processing liquid laundry detergent
CN211302893U (en) Bactericide agitator tank
CN213610994U (en) Bentonite agitating unit
CN210905882U (en) Agitating unit for chemical industry
CN208959826U (en) A kind of energy-saving, environment-friendly and high-efficiency novel mixing machine feeding device
CN210332517U (en) Production and processing equipment for film forming additive
CN218189316U (en) Feed mixing equipment for concentrated feed processing
CN219359820U (en) Batching device for concrete processing
CN221021685U (en) Stirring device for mortar manufacturing
CN218170900U (en) Efficient mixing device for mixing concrete
CN217340950U (en) Proportioning machine for making phosphate abrasive brick
CN219404804U (en) Quantitative feeding mechanism for concrete additive production
CN219333861U (en) Physical dry mixing device for gypsum retarder production
CN219849009U (en) Mobilizable material mixes machine
CN215359125U (en) Concrete mixing device
CN220681189U (en) Building construction concrete mixing device
CN220666977U (en) Pouring device for building house construction
CN218875950U (en) Mixing and feeding device of high-speed mixing machine
CN219186544U (en) Chicken feed production batching bucket
CN219744699U (en) Novel blendor
CN219964660U (en) Treatment is with adding medicine pond