CN2204334Y - Front-probe support for machine-digging working-surface - Google Patents

Front-probe support for machine-digging working-surface Download PDF

Info

Publication number
CN2204334Y
CN2204334Y CN 94214513 CN94214513U CN2204334Y CN 2204334 Y CN2204334 Y CN 2204334Y CN 94214513 CN94214513 CN 94214513 CN 94214513 U CN94214513 U CN 94214513U CN 2204334 Y CN2204334 Y CN 2204334Y
Authority
CN
China
Prior art keywords
column
cylinder
hinged
crossbeam
cutting arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94214513
Other languages
Chinese (zh)
Inventor
祁江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 94214513 priority Critical patent/CN2204334Y/en
Application granted granted Critical
Publication of CN2204334Y publication Critical patent/CN2204334Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a front-probe support for machine-digging working surfaces, which is a temporary supporting device for digging working surfaces of mines and downholes. The utility model is composed of an upright post, a big beam and small beams. Through the hydraulic control, the upright post is hinged with a cutting arm of a machine set through a rotary base and a lifting oil cylinder. The big beam is arranged at the upper end of the upright post and hinged with supporting oil cylinders uniformly arranged on the upright post. The small beams are symmetrically arranged at both sides of the big beam, one end of each small beam is connected with telescopic oil cylinders correspondingly arranged at both sides of the big beam, and the other end is welded on a connecting block. The utility model is suitable for machine-digging anchor rod tunnels of which the width of the cross section is from 3.5 to 5 meters and the height is from 2.8 to 4 meters. The top length of once support working surface is more than 5.96 meters. The utility model has the advantages of large supporting area, high safety, enlarged circulation progress and obvious economic benefit and social benefit.

Description

Front-probe support for machine-digging working-surface
The utility model belongs to a kind of temporary support device of down-hole, mine driving face.
The temporary lining of down-hole, mine driving face use at present is a kind of forestope of passing along top board.But raising along with digging speed, require driving to strengthen the progress of each circulation as far as possible, avoid the too much time of waste in technology is connected, and this passing formula forestope is hung on roofbolt, flexible distance is short, once can only supporting 2 meters sky top, can not control zero skin fall and large tracts of land is leaked the top, safety that can not the safeguard work face runs into top board and can't not install at ordinary times, after having cut 3 meters, just must beat crab-bolt as early as possible at most, wasted many times in technology is connected, cycle-index is many, has seriously hindered the raising of machine pick speed, economic benefit is not high, and be manual operations entirely, minimum two people could install, and have increased working strength of workers, just as a kind of ornaments, in actual production, do not have in all senses at the scene.
The purpose of this utility model just is to provide a kind of safety factor that improves operating environment, strengthens the progress of each circulation, easy to operate front-probe support.
The utility model is made up of column, large and small beam and three-position four-way valve.Column links to each other with cutting arm by following two fulcrums: the one, and it is hinged that the rotation on column lower end Connection Block and the cutting arm changes base, and the 2nd, the piston rod of column side and hoist cylinder is hinged, and the cylinder body of hoist cylinder is installed in the base of cutting arm; Cushion block is fixed on the column top; The piston rod end and the crossbeam of support cylinder are hinged, then symmetrical uniform being installed on the tube-shape pillar of the cylinder body of support cylinder; Crossbeam is umbrella shape and is contained in the column upper end; Bilateral symmetry in the nearly stud end of i iron crossbeam is equipped with telescopic oil cylinder; Girder also symmetry is contained in the crossbeam both sides, and the one end is connected with the piston rod of telescopic oil cylinder, and the other end is symmetrically welded on the contiguous block; Fixedly steamboat connects by bearing pin, and symmetry is installed in the crossbeam outer end; Mobile steamboat is contained on the steamboat fastening devices that moves with girder; The telescopic oil cylinder of girder all is to be connected with the oil cylinder of two symmetries respectively by a three-position four-way valve with the support cylinder of crossbeam, and the hoist cylinder of column links to each other with three-position four-way valve separately.
The utility model has the advantages that:
1, each feed quantity is big, once can cut 5.5 meters, if 12 meters of class's target advances adopt passing formula forestope, each cutter must not be above 3 meters, so just must there be 4 circulations just can finish, if once can feed 6 meters, the progress of planning 12 meters only needs two circulations just can finish, avoided the time of waste in many technologies linkings, reduce the driving cycle-index, improved operating efficiency, remarkable in economical benefits greatly.
2, the supporting area is big, and is main because the girder on the crossbeam can stretch, and is applicable to that section is wide 3.5~5 meters, high 2.8~4 meters, machine pick anchor pole tunnel, it once can safeguard 5~6 meters sky top, can support 0.5 meter thick absciss layer top board, resembling a umbrella firmly holds top top board, avoided large tracts of land to leak falling of top and big zero skin, beam contacts with top board tightly, does not need the jack rafter of stopping, the workman can beat crab-bolt, the safety that has improved operating environment greatly safely under beam.
3, flexible to operation, alleviated working strength of workers, all adopt hydraulic control, operator only needs 1 people to operate being installed in unit driver's seat next door, finish supporting after, also this device can be drawn in together, mobile at random.
Fig. 1 is a structural representation
Fig. 2 is distribution situation figure
Be described in further detail below in conjunction with accompanying drawing:
Column 10 links to each other with cutting arm 16 by following two fulcrums, the one, column 10 lower end Connection Blocks 11 are hinged with the rotary table 12 on the cutting arm 16, the 2nd, the piston rod of column side and hoist cylinder 13 is hinged, the cylinder body of hoist cylinder 13 is installed in the base 14 of cutting arm 16, cushion block 7 is fixed on the top of column 10, the piston rod end of support cylinder 8 and crossbeam 5 are hinged, then symmetrical uniform being installed on the tube-shape pillar 10 of the cylinder body of support cylinder 8, crossbeam 5 is the upper end that umbrella shape is contained in column 10, bilateral symmetry at i iron crossbeam 5 nearly column 10 ends is equipped with telescopic oil cylinder 6, the also symmetrical both sides that are contained in crossbeam 5 of girder 2, the one end is connected with the piston rod of telescopic oil cylinder 6, the other end is symmetrically welded on the contiguous block 1, fixedly steamboat 3 is installed in crossbeam 5 outer ends by bearing pin connection symmetry, mobile steamboat 4 is contained on the steamboat fastening devices 9 that moves with girder 2, the telescopic oil cylinder 6 of girder 2 and the support cylinder 8 of crossbeam 5 all are oil cylinders of being controlled two symmetries by 1 three-position four-way valve respectively, and the hoist cylinder 13 of column 10 is by an independent three-position four-way valve control.Support process is under the situation that is in cut state or supporting when unit and finishes, and this device is contracted on the cutting arm 16, because of cutting head is 5~6 meters apart from unit driver's seat distance, so disposable cut 5~6 meters after, supporting in the following order:
(1), unit cutting arm 16 is reduced, make the height that can satisfy column 10, press the operation valve of hoist cylinder 13, rise column 10, allow itself and top board maintenance plumbness.
(2), lift cutting arm 16 column 10 top cushion blocks 7 closely contacted with back, prevent roof delamination.
(3), open the operation valve of telescopic oil cylinder 6, girder 2 is stretched out, press the operation valve of support cylinder 8 simultaneously, rise crossbeam 5, large and small beam is contacted with top board simultaneously.
(4), under beam, carry out supporting, if beam and anchor pole location overlap can be readjusted the position of beam.
(5), after supporting finishes, the crossbeam 5 that edges down is regained girder 2.
(6), fall crossbeam 5, be recovered to around the column 10.
(7), reduce cutting arm 16, upright cushion block 7 of living on 10 is broken away from top board puts down column then, allow its top shelf on the back-up block 15 of cutting arm 16, supporting finishes.

Claims (1)

1, a kind of front-probe support of tunneling working face is made of beam and it is characterized in that beam and column are hinged, and column and cutting arm are hinged,
Column links to each other with cutting arm by following two fulcrums, the one, it is hinged that column lower end Connection Block and cutting arm Shang De rotation change base, the 2nd, the piston rod of column side and hoist cylinder is hinged, the cylinder body of hoist cylinder is contained in the base of cutting arm, cushion block is fixed on the column top, the piston rod end and the crossbeam of support cylinder are hinged, then symmetrical uniform being installed on the tube-shape pillar of the cylinder body of support cylinder, crossbeam is umbrella shape and is contained in the column upper end, bilateral symmetry in the nearly stud end of i iron crossbeam is equipped with telescopic oil cylinder, girder also symmetry is contained in the crossbeam both sides, the one end is connected with the piston rod of telescopic oil cylinder, the other end is symmetrically welded on the contiguous block, fixedly steamboat connects by bearing pin, and symmetry is installed in the crossbeam outer end, and mobile steamboat is contained on the steamboat fastening devices that moves with girder, hoist cylinder, support cylinder, telescopic oil cylinder all are connected with three-position four-way valve.
CN 94214513 1994-06-17 1994-06-17 Front-probe support for machine-digging working-surface Expired - Fee Related CN2204334Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94214513 CN2204334Y (en) 1994-06-17 1994-06-17 Front-probe support for machine-digging working-surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94214513 CN2204334Y (en) 1994-06-17 1994-06-17 Front-probe support for machine-digging working-surface

Publications (1)

Publication Number Publication Date
CN2204334Y true CN2204334Y (en) 1995-08-02

Family

ID=33830757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94214513 Expired - Fee Related CN2204334Y (en) 1994-06-17 1994-06-17 Front-probe support for machine-digging working-surface

Country Status (1)

Country Link
CN (1) CN2204334Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210493B (en) * 2006-12-27 2010-05-12 三一重型装备有限公司 Large gradient roadheader
CN102116164A (en) * 2011-01-23 2011-07-06 湖南科技大学 Temporary supporting device for roadway drifting
CN103758543A (en) * 2014-01-21 2014-04-30 中国矿业大学 Temporary advanced support device
CN106014461A (en) * 2016-07-21 2016-10-12 金川集团股份有限公司 Protection device for roadway construction
CN106640114A (en) * 2017-02-23 2017-05-10 淮南矿业(集团)有限责任公司 Safe temporary supporting device of mining TBM
CN110307025A (en) * 2019-03-29 2019-10-08 新汶矿业集团有限责任公司 Single beam type advanced stand device and its implementation when for underworkings driving
CN111561334A (en) * 2020-05-21 2020-08-21 徐发 Temporary protection supporting equipment for ore mining working face and supporting method thereof
CN113482678A (en) * 2021-06-29 2021-10-08 山西潞安矿业集团慈林山煤业有限公司李村煤矿 Flexible roof-contacting temporary supporting device and using method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210493B (en) * 2006-12-27 2010-05-12 三一重型装备有限公司 Large gradient roadheader
CN102116164A (en) * 2011-01-23 2011-07-06 湖南科技大学 Temporary supporting device for roadway drifting
CN102116164B (en) * 2011-01-23 2012-12-05 湖南科技大学 Temporary supporting device for roadway drifting
CN103758543A (en) * 2014-01-21 2014-04-30 中国矿业大学 Temporary advanced support device
CN103758543B (en) * 2014-01-21 2015-09-23 中国矿业大学 Foreset device
CN106014461A (en) * 2016-07-21 2016-10-12 金川集团股份有限公司 Protection device for roadway construction
CN106640114A (en) * 2017-02-23 2017-05-10 淮南矿业(集团)有限责任公司 Safe temporary supporting device of mining TBM
CN110307025A (en) * 2019-03-29 2019-10-08 新汶矿业集团有限责任公司 Single beam type advanced stand device and its implementation when for underworkings driving
CN110307025B (en) * 2019-03-29 2024-05-17 新汶矿业集团有限责任公司 Single-beam type advanced support device for underground roadway tunneling and implementation method thereof
CN111561334A (en) * 2020-05-21 2020-08-21 徐发 Temporary protection supporting equipment for ore mining working face and supporting method thereof
CN111561334B (en) * 2020-05-21 2021-12-14 湖南新田岭钨业有限公司 Temporary protection supporting equipment for ore mining working face and supporting method thereof
CN113482678A (en) * 2021-06-29 2021-10-08 山西潞安矿业集团慈林山煤业有限公司李村煤矿 Flexible roof-contacting temporary supporting device and using method thereof
CN113482678B (en) * 2021-06-29 2024-02-13 山西潞安矿业集团慈林山煤业有限公司李村煤矿 Flexible roof-connecting temporary support device and use method thereof

Similar Documents

Publication Publication Date Title
CN2839365Y (en) Working device for bridge detection vehicle
CN101457652B (en) Overlarge mining height hydraulic support
CN101219755B (en) Crane with heavy frame beam
CN201747390U (en) Suspension type multifunctional tunnel operation machine
CN100516465C (en) Integrated tunnelling and anchoring machine
CN104747078B (en) A kind of tunnel construction trolley
CN204716251U (en) Circular orbit formula multifunctional rock drilling trolley
CN110080811B (en) Adjustable type advanced support bracket for rapid comprehensive mechanized excavation and use method
CN2204334Y (en) Front-probe support for machine-digging working-surface
CN105927255B (en) A kind of rock filling gob side entry retaining gangue stopping device
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN104481566A (en) Fully-mechanized excavation face automatic anchoring and sliding rail type walking temporary support
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN201172599Y (en) Heavy-duty beam erecting crane
CN110158973A (en) A kind of frame tube apparatus and synchronization job formula frame pipe construction method
CN2188654Y (en) Combined alternating bracing hydraulic support
CN108643941A (en) Gantry type arch installs trolley
CN219061695U (en) Arch frame robotic arm grabbing and lifting device
CN209800004U (en) Stope face crossheading circulation self-moving anti-impact advance support system
CN208455622U (en) A kind of quick pile driving equipment of architectural engineering
CN210797292U (en) Six-direction positioning and quick adjusting device for realizing prefabricated section beam
CN108178110A (en) A kind of deep-sea mining water surface supports pipeline to lay recovery system
CN209260561U (en) A kind of integration Bridge Erector
CN2212037Y (en) Mulitfunction high speed wellhead by hydraulic lift
CN206448831U (en) Without support gib equipment repeatedly

Legal Events

Date Code Title Description
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee