CN220433343U - Concrete vibrating device for concrete pavement construction - Google Patents

Concrete vibrating device for concrete pavement construction Download PDF

Info

Publication number
CN220433343U
CN220433343U CN202321796299.7U CN202321796299U CN220433343U CN 220433343 U CN220433343 U CN 220433343U CN 202321796299 U CN202321796299 U CN 202321796299U CN 220433343 U CN220433343 U CN 220433343U
Authority
CN
China
Prior art keywords
fixedly connected
concrete
rod
mounting
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321796299.7U
Other languages
Chinese (zh)
Inventor
谢云鹏
陈胜春
杨小礼
叶放明
陈迎春
廖丽莎
康蓉
昌萍
刘思源
陈远凌
张进
廖宏
陈波
谢科
李照
廖和容
康苗
秦鑫鑫
刘辉
廖伶俐
谢意伟
易吉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hongshang Testing Technology Co ltd
Original Assignee
Hunan Hongshang Testing Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Hongshang Testing Technology Co ltd filed Critical Hunan Hongshang Testing Technology Co ltd
Priority to CN202321796299.7U priority Critical patent/CN220433343U/en
Application granted granted Critical
Publication of CN220433343U publication Critical patent/CN220433343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model provides a concrete vibrating device for concrete pavement construction. The concrete vibrating device for concrete pavement construction comprises: a moving vehicle; the water tank, water tank fixed connection is at the top of locomotive, the top fixedly connected with structure that draws water of locomotive, the top of locomotive is located the position fixedly connected with collection box of opposite side, the positive fixedly connected with drain pipe of collection box, the top fixedly connected with of collection box washs the case. According to the concrete vibrating device for the concrete pavement construction, the filter box is taken down from the position between the sliding rails through the sealing plate, the internal sediment is cleaned, the vibrating rod can be cleaned for many times through the cooperation of the spray head and the cleaning ring through the device, direct flushing through clear water can be avoided, the use of water resources is reduced, waste is reduced, meanwhile, sand in the cleaning process can be filtered through the filter box, and pipeline blockage caused by direct discharge is avoided.

Description

Concrete vibrating device for concrete pavement construction
Technical Field
The utility model relates to the technical field of concrete construction, in particular to a concrete vibrating device for concrete pavement construction.
Background
The concrete pavement is a pavement with cement concrete slab as a surface layer, and the pavement structure is also called a rigid pavement, and is composed of a cement concrete slab as a surface layer, a base layer and a cushion layer.
When the concrete pavement is poured, the concrete is vibrated, bubbles in the concrete are removed, the concrete is tightly combined, the phenomena of honeycomb pitting surface and the like of the concrete are eliminated, so that the strength of the concrete is improved, the quality of a concrete member is ensured, and the concrete vibrating rod is a machine for mechanically tamping the concrete.
The existing vibrating rod is generally attached with some concrete after being used, the concrete is attached to the existing vibrating rod, if the concrete is not cleaned timely, the concrete is easy to solidify on the vibrating rod, the existing cleaning mode is to wash by means of a large amount of clean water, water resource waste is easy to be caused, and the cleaned sediment is directly discharged to easily cause pipeline blockage.
Accordingly, there is a need to provide a concrete vibrating device for concrete pavement construction that solves the above-mentioned problems.
Disclosure of Invention
The utility model provides a concrete vibrating device for concrete pavement construction, which solves the problems that a large amount of clear water is used for flushing a vibrating rod, so that water resource waste is easy to be caused, and the water containing sediment is directly discharged, so that a pipeline is easy to be blocked.
In order to solve the technical problems, the concrete vibrating device for concrete pavement construction provided by the utility model comprises: a moving vehicle;
the water tank is fixedly connected to the top of the mobile vehicle, the water pumping structure is fixedly connected to the top of the mobile vehicle, the collecting box is fixedly connected to the position, located on the other side, of the top of the mobile vehicle, the water discharging pipe is fixedly connected to the front of the collecting box, the cleaning box is fixedly connected to the top of the collecting box, the mounting pipe is fixedly connected to one side of the inner wall of the cleaning box, the sliding rod is fixedly connected to the bottom of the inner wall of the mounting pipe, the mounting box is fixedly connected to the top of the mounting pipe, the servo motor is fixedly connected to the bottom of the inner wall of the mounting box, one end of the output shaft of the servo motor is fixedly connected with the threaded rod, the thread block is connected to the outer thread block, the cleaning ring is fixedly connected to one side of the thread block, the mounting ring is fixedly connected to the mounting plate at the position, close to the bottom, of one side of the inner wall of the cleaning box, the two sides of the cleaning box, the filter plate and the filter plate are fixedly connected to the bottom of the inner wall of the filter box.
The fixed mount is fixedly connected to the middle position of the top of the mobile vehicle, the vibrating machine is fixedly connected to the top of the fixed mount through a cushioning frame, one end of an output shaft of the vibrating machine is provided with a vibrating rod through a connecting wire, a water pumping structure comprises a shell and a water pump, a water inlet is connected with a water tank through a water pipe, a water outlet is connected with a spray head through a water pipe, the water pumping structure is positioned below the fixed mount, a valve is arranged on a drain pipe, two holes are formed in a thread block, the utility model provides a screw hole and threaded rod threaded connection, still a hole and slide bar sliding connection, the inner loop of cleaning ring is provided with the cleaning brush, and the layer board is located the top of filter cartridge, and the bradyseism frame contains patient's spring and fixed plate, and vibrating machine, connecting wire and vibrating bar are current equipment, and connected mode and mode of operation are current just do not need to be repeated much, and cleaning box and collection box junction are logical, and the shower nozzle is installed downwards towards the slant at the collar inner loop.
Preferably, the top fixedly connected with bracing piece of locomotive, the top fixedly connected with installation pole of bracing piece, bracing piece are located the position of mobile roof position one side, and the locomotive contains wheel and handle.
Preferably, the top fixedly connected with winding structure of installation pole, the outside of winding structure is provided with the steel wire, the other end fixedly connected with fixation clamp of steel wire, the top of installation pole is close to the position fixedly connected with guide pulley of the other end, and winding structure contains motor and winding wheel, and the steel wire is the outside at the winding wheel, and the steel wire slides in the outside of guide pulley, and the guide pulley plays the steering action to the steel wire, and the fixation clamp is used for clieing the connecting wire.
Preferably, the front fixedly connected with closing plate of filter cartridge, the outside fixedly connected with sealing ring of closing plate, the closing plate passes through the sealing ring and just washs the front of case and be located the position contact of bottom, and the position that can take out the filter cartridge is sealed up.
Preferably, the top fixedly connected with supporting disk of bracing piece, the top fixedly connected with mounting disc of supporting disk, the inside of mounting disc is empty, is detachable through bolted connection between supporting disk and the mounting disc.
Preferably, the inside rotation of mounting disc is connected with the rolling disc, the top fixedly connected with connecting rod of rolling disc, the top fixedly connected with bearing of mounting disc, the connecting rod is fixed at the inner ring of bearing, can restrict connecting rod pivoted speed through the frictional force of bearing.
Preferably, the outside of connecting rod is close to the position fixedly connected with activity knot in the middle, one side rotation of activity knot is connected with the hydraulic stem, the top of connecting rod is connected with the installation pole through rotating the head rotation, and the other end of hydraulic stem is connected in the bottom of installation pole through the activity knot rotation.
Compared with the related art, the concrete vibrating device for the concrete pavement construction has the following beneficial effects:
the utility model provides a concrete vibrating device for concrete pavement construction, when the vibrating device is used in the concrete pavement construction process, firstly, a vibrating rod adhered with concrete is inserted into the cleaning box, the bottom end of the vibrating rod is contacted with a supporting plate, the vibrating rod is positioned in the cleaning ring and the inner ring of a mounting ring, then, only a water pumping structure is required to be started to spray water into the vibrating rod through a spray head for first flushing, after flushing, a servo motor is only required to be started to drive a threaded rod to rotate, the threaded rod can be driven to move up and down while rotating, the threaded rod can play a limiting role through a slide rod in the process of moving up and down, the threaded rod can only move up and down to increase stability, and the threaded rod can drive the cleaning ring to move up and down outside the vibrating rod in the process of moving up and down outside the threaded rod, so as to clean the outside of the vibrating rod for the second time, the servo motor stops working after the cleaning ring moves up and down for two to three times outside the vibrating rod, the water pumping structure is started again to supply water for the spray head, the vibrating rod is flushed for the third time by the water sprayed by the spray head, the water containing sediment falls into the filter box in the flushing process, the sediment is blocked by the filter plate in the filter box, the water can be discharged into the collecting box, the sewage is discharged by only opening the drain pipe when reaching the position capable of being discharged, the filter box is taken down from the slide rail by the sealing plate, the sediment in the interior is cleaned off, the vibrating rod can be cleaned for many times by the cooperation of the spray head and the cleaning ring by the device, the direct flushing by clear water can be avoided, the use of water resources is reduced, the waste is reduced, and meanwhile, the sand in the cleaning process can be filtered by the filter box, and the pipeline blockage caused by direct discharge is avoided.
Drawings
Fig. 1 is a schematic structural view of a first embodiment of a concrete vibrating device for concrete pavement construction according to the present utility model;
FIG. 2 is a schematic view of a threaded rod according to the present utility model;
FIG. 3 is a schematic view of a filter plate according to the present utility model;
fig. 4 is a schematic structural view of a second embodiment of the concrete vibrating device for concrete pavement construction provided by the utility model;
fig. 5 is a schematic structural view of a rotating disc according to the present utility model.
Reference numerals in the drawings: 1. the device comprises a moving vehicle, 2, a pumping structure, 3, a fixed frame, 4, a drain pipe, 5, a collecting box, 6, a cleaning box, 7, a vibrating rod, 8, a connecting wire, 9, a fixing clamp, 10, a guide wheel, 11, a steel wire, 12, a rolling structure, 13, a mounting rod, 14, a supporting rod, 15, a water tank, 16, a damping frame, 17, a vibrating machine, 18, a mounting box, 19, a screw block, 20, a spray head, 21, a mounting ring, 22, a cleaning ring, 23, a supporting plate, 24, a sealing ring, 25, a filtering box, 26, a sliding block, 27, a sliding rail, 28, a sliding rod, 29, a threaded rod, 30, a mounting pipe, 31, a servo motor, 32, a filter plate, 33, a sealing plate, 34, a movable buckle, 35, a hydraulic rod, 36, a rotating head, 37, a connecting rod, 38, a mounting disc, 39, a supporting disc, 40, a rotating disc, 41 and a bearing.
Detailed Description
The utility model will be further described with reference to the drawings and embodiments.
First embodiment
Referring to fig. 1, fig. 2, and fig. 3 in combination, fig. 1 is a schematic structural diagram of a first embodiment of a concrete vibrating device for concrete pavement construction according to the present utility model; FIG. 2 is a schematic view of a threaded rod according to the present utility model; fig. 3 is a schematic structural view of a filter plate according to the present utility model. The concrete vibrating device for the concrete pavement construction comprises: a mobile vehicle 1;
the water tank 15, water tank 15 fixedly connected with is at the top of locomotive 1, the top fixedly connected with pumping structure 2 of locomotive 1, the top of locomotive 1 is located the position fixedly connected with collection box 5 of opposite side, the front fixedly connected with drain pipe 4 of collection box 5, the top fixedly connected with of collection box 5 washs case 6, one side fixedly connected with installation pipe 30 of washs case 6 inner wall, the bottom fixedly connected with slide bar 28 of installation pipe 30 inner wall, the top fixedly connected with installation box 18 of installation pipe 30, the bottom fixedly connected with servo motor 31 of installation box 18 inner wall, the one end fixedly connected with layer board 29 of servo motor 31 output shaft, the outside screw thread connection of threaded rod 29 has screw thread piece 19, one side fixedly connected with cleaning ring 22 of screw thread piece 19, the position fixedly connected with collar 21 of washs case 6 inner wall near the top, the inner ring of collar 21 is provided with a plurality of shower nozzles 20, the position that one side of washs case 6 inner wall is close to the bottom fixedly connected with slide rail 23, the position that two sides of inner wall 6 inner wall is close to the bottom 25 of two filter slide bar 25, two side filter slide bar 25 are connected with two adjacent slide bar 25 fixedly connected with bottom 25 of filter plate;
the fixed frame 3, fixed frame 3 fixed connection is in the top intermediate position of mobile car 1, the top of fixed frame 3 is through bradyseism frame 16 fixedly connected with vibrating machine 17, vibrating machine 17 output shaft's one end is provided with vibrating rod 7 through connecting wire 8, pumping structure 2 contains casing and water pump, the water inlet passes through water pipe and water tank 15 to be connected, the delivery port passes through water pipe and shower nozzle 20 to be connected, pumping structure 2 is located the below of fixed frame 3, be provided with the valve on the drain pipe 4, there are two holes on the screw 19, screw hole and threaded rod 29 threaded connection, still a hole and slide bar 28 sliding connection, the inner ring of cleaning ring 22 is provided with the cleaning brush, layer board 23 is located the top of filter box 25, bradyseism frame 16 contains patient spring and fixed plate, vibrating machine 17, connecting wire 8 and vibrating rod 7 are current equipment, the connected mode and mode of operation are all present just do not make in a lot and are described, cleaning box 6 and collecting box 5 junction is logical, shower nozzle 20 installs in the inner ring of installation down to one side.
The top fixedly connected with bracing piece 14 of locomotive 1, the top fixedly connected with installation pole 13 of bracing piece 14, bracing piece 14 are located the position that locomotive 1 top is located one side, and locomotive 1 contains wheel and handle.
The top fixedly connected with rolling structure 12 of installation pole 13, the outside of rolling structure 12 is provided with steel wire 11, the other end fixedly connected with fixation clamp 9 of steel wire 11, the top of installation pole 13 is close to the position fixedly connected with guide pulley 10 of the other end, and rolling structure 12 contains motor and rolling wheel, and steel wire 11 is the outside of winding wheel, and steel wire 11 slides in the outside of guide pulley 10, and guide pulley 10 plays the steering effect to steel wire 11, and fixation clamp 9 is used for the centre gripping connecting wire 8.
The front of filter cartridge 25 fixedly connected with closing plate 33, the outside fixedly connected with sealing ring 24 of closing plate 33, closing plate 33 passes through sealing ring 24 and just washs the front of case 6 and be located the position contact in bottom, and the position that can take out of filter cartridge 25 is sealed.
The working principle of the concrete vibrating device for concrete pavement construction provided by the utility model is as follows:
the vibrating rod 7 that will glue the concrete earlier inserts the inside of wasing case 6, let the bottom and the layer board 23 contact of vibrating rod 7, and let vibrating rod 7 be located the inner loop of cleaning ring 22 and collar 21, afterwards only need start pumping structure 2 and carry out the first washing for vibrating rod 7 through shower nozzle 20, only need start servo motor 31 drive threaded rod 29 rotation after the washing is accomplished, and can drive screw thread piece 19 and reciprocate when threaded rod 29 rotates, can play the restriction effect through slide bar 28 in the in-process that screw thread piece 19 reciprocated, let screw thread piece 19 can only reciprocate and increase stability, and screw thread piece 19 can drive the cleaning ring 22 in the outside of vibrating rod 7 reciprocate, thereby carry out the second clearance to the outside of vibrating rod 7, move two to three times back servo motor 31 stop work outside the vibrating rod 7, start pumping structure 2 again and supply water for shower nozzle 20, the water through shower nozzle 20 carries out the third to vibrating rod 7 and reciprocate, and can get the seal plate 25 through the slide rail that can be opened to the inside of box 25 that can be reached to the inside of box 25 to drain the inside of box 25 through the filter box that can be opened to the inside of box 25 that can be discharged to the inside of box 25.
Compared with the related art, the concrete vibrating device for the concrete pavement construction has the following beneficial effects:
when the vibrating device is used in the construction process of the concrete pavement, firstly, the vibrating rod 7 adhered with concrete is inserted into the cleaning box 6, the bottom end of the vibrating rod 7 is contacted with the supporting plate 23, the vibrating rod 7 is positioned on the cleaning ring 22 and the inner ring of the mounting ring 21, then, the pumping structure 2 is started to spray water into the vibrating rod 7 through the spray head 20 for flushing for the first time, after flushing, the servo motor 31 is started to drive the threaded rod 29 to rotate, the threaded rod 29 can be driven to move up and down while rotating, the threaded rod 29 can play a limiting role through the sliding rod 28 in the process of moving up and down, the threaded rod 19 can only move up and down to increase stability, the cleaning ring 22 can be driven to move up and down outside the vibrating rod 7 in the process of moving up and down outside the threaded rod 29, so that the outside of the vibrating rod 7 is cleaned for the second time, after the cleaning ring 22 moves up and down for two to three times outside the vibrating rod 7, the servo motor 31 stops working, the water pumping structure 2 is started to supply water to the spray head 20, the vibrating rod 7 is flushed for the third time by the water sprayed out by the spray head 20, the water containing sediment falls into the filter box 25 in the flushing process, the sediment is blocked by the filter plate 32 in the filter box 25, the water can be discharged into the collecting box 5, the sewage is discharged only by opening the drain pipe 4 when reaching the position capable of being discharged, the filter box 25 is taken down from the position between the slide rails 27 by the sealing plate 33, the sediment in the interior is cleaned, the vibrating rod 7 can be cleaned for many times by the cooperation of the spray head 20 and the cleaning ring 22 by the device, the direct flushing by clean water can be avoided, the use of water resources is reduced, the waste is reduced, meanwhile, the sand in the cleaning process can be filtered by the filter box 25, and the pipeline blockage caused by direct discharge is avoided.
Second embodiment
Referring to fig. 4-5 in combination, fig. 4 is a schematic structural diagram of a second embodiment of a concrete vibrating device for concrete pavement construction according to the present utility model; fig. 5 is a schematic structural view of a rotating disc according to the present utility model, and another concrete vibrating device for concrete pavement construction is proposed according to a second embodiment of the present application based on the concrete vibrating device for concrete pavement construction provided in the first embodiment of the present application. The second embodiment is merely a preferred manner of the first embodiment, and implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the second embodiment of the present application provides a concrete vibrating device for concrete pavement construction, which is characterized in that the top end of the supporting rod 14 is fixedly connected with a supporting disc 39, the top end of the supporting disc 39 is fixedly connected with a mounting disc 38, the inside of the mounting disc 38 is hollow, and the supporting disc 39 and the mounting disc 38 are detachable through bolt connection.
The inside rotation of mounting disc 38 is connected with rolling disc 40, the top fixedly connected with connecting rod 37 of rolling disc 40, the top fixedly connected with bearing 41 of mounting disc 38, connecting rod 37 is the inner ring of fixing at bearing 41, can restrict the speed of connecting rod 37 rotation through the frictional force of bearing 41.
The outside of connecting rod 37 is close to the position fixedly connected with activity knot 34 in the centre, one side rotation of activity knot 34 is connected with hydraulic rod 35, the top of connecting rod 37 is connected with installation pole 13 through rotating head 36 rotation, and the other end of hydraulic rod 35 is connected in the bottom of installation pole 13 through activity knot 34 rotation.
Compared with the related art, the concrete vibrating device for the concrete pavement construction has the following beneficial effects:
when the vibrating rod 7 needs angle adjustment in the use process, only the connecting rod 37 needs to be rotated to enable the vibrating rod 37 to rotate in the mounting disc 38 through the bearing 41 and the rotating disc 40, so that the angle of the mounting rod 13 can be adjusted, the use position of the vibrating rod 7 is convenient, if the angle of the mounting rod 13 needs to be adjusted, only the hydraulic rod 35 needs to be started to drive the mounting rod 13 to the top end of the connecting rod 37 through the movable buckle 34 and the rotating head 36, the operating of the vibrating rod 7 in the use process is convenient for a worker to adjust the angle, the working range of the vibrating rod 7 driven by the mounting rod 13 can be increased through the device, and the use of the vibrating rod is convenient for the worker.
The foregoing description is only illustrative of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present utility model.

Claims (7)

1. The utility model provides a concrete pavement construction is with concrete vibrating device which characterized in that includes: a moving vehicle;
the water tank is fixedly connected to the top of the mobile vehicle, the water pumping structure is fixedly connected to the top of the mobile vehicle, the collecting box is fixedly connected to the position, located on the other side, of the top of the mobile vehicle, the water discharging pipe is fixedly connected to the front of the collecting box, the cleaning box is fixedly connected to the top of the collecting box, the mounting pipe is fixedly connected to one side of the inner wall of the cleaning box, the sliding rod is fixedly connected to the bottom of the inner wall of the mounting pipe, the mounting box is fixedly connected to the top of the mounting pipe, the servo motor is fixedly connected to the bottom of the inner wall of the mounting box, one end of the output shaft of the servo motor is fixedly connected with the threaded rod, the thread block is connected to the outer thread block, the cleaning ring is fixedly connected to one side of the thread block, the mounting ring is fixedly connected to the mounting plate at the position, close to the bottom, of one side of the inner wall of the cleaning box, the two sides of the cleaning box, the filter plate and the filter plate are fixedly connected to the bottom of the inner wall of the filter box.
The fixed frame, fixed frame fixed connection is at the top intermediate position of mobile car, the top of fixed frame is through bradyseism frame fixedly connected with vibrator, the one end of vibrator output shaft is provided with the vibrating rod through the connecting wire.
2. The concrete vibrating device for concrete pavement construction according to claim 1, wherein the top of the moving vehicle is fixedly connected with a supporting rod, and the top of the supporting rod is fixedly connected with a mounting rod.
3. The concrete vibrating device for concrete pavement construction according to claim 2, wherein the top of the mounting rod is fixedly connected with a rolling structure, a steel wire is arranged outside the rolling structure, the other end of the steel wire is fixedly connected with a fixing clamp, and the position, close to the other end, of the top of the mounting rod is fixedly connected with a guide wheel.
4. The concrete vibrating device for concrete pavement construction according to claim 1, wherein the front surface of the filter box is fixedly connected with a sealing plate, and the outside of the sealing plate is fixedly connected with a sealing ring.
5. The concrete vibrating device for concrete pavement construction according to claim 2, wherein a supporting plate is fixedly connected to the top end of the supporting rod, and a mounting plate is fixedly connected to the top end of the supporting plate.
6. The concrete vibrating device for concrete pavement construction according to claim 5, wherein a rotating disc is rotatably connected to the inside of the mounting disc, a connecting rod is fixedly connected to the top end of the rotating disc, and a bearing is fixedly connected to the top end of the mounting disc.
7. The concrete vibrating device for concrete pavement construction according to claim 6, wherein a movable buckle is fixedly connected to the outer portion of the connecting rod near the middle, a hydraulic rod is rotatably connected to one side of the movable buckle, and a mounting rod is rotatably connected to the top end of the connecting rod through a rotating head.
CN202321796299.7U 2023-07-10 2023-07-10 Concrete vibrating device for concrete pavement construction Active CN220433343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321796299.7U CN220433343U (en) 2023-07-10 2023-07-10 Concrete vibrating device for concrete pavement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321796299.7U CN220433343U (en) 2023-07-10 2023-07-10 Concrete vibrating device for concrete pavement construction

Publications (1)

Publication Number Publication Date
CN220433343U true CN220433343U (en) 2024-02-02

Family

ID=89685652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321796299.7U Active CN220433343U (en) 2023-07-10 2023-07-10 Concrete vibrating device for concrete pavement construction

Country Status (1)

Country Link
CN (1) CN220433343U (en)

Similar Documents

Publication Publication Date Title
CN110372161A (en) A kind of urban ecology river bottom mud pretreatment system and its processing method
CN111420915A (en) Recoverable integrated device of grit branch sieve washing sewage for building engineering
CN220433343U (en) Concrete vibrating device for concrete pavement construction
CN111891078A (en) Automatic car washing platform of concrete mixer
CN209272079U (en) A kind of cleaning plant of concrete mixer hopper
CN213591227U (en) Building waste reclaimed sand belt cleaning device
CN110802714A (en) Automatic bubble collator
CN209034787U (en) A kind of novel sand-stone separator
CN112246007A (en) Desanding and purifying equipment for constructional engineering
CN218083416U (en) Bridge construction is with pouring device
CN215310463U (en) Concrete mixer truck effluent treatment plant
CN213998803U (en) Tee bend pipe fitting inner wall processing cleaning device
CN206527074U (en) Cleaning device applied to concrete plain bumper
CN212139150U (en) Belt cleaning device is used in abalone production
CN213561547U (en) Concrete block surface grinding device
CN109159261B (en) Cleaning device of mould for building block forming machine
CN110577296B (en) Water purifier by membrane filtration method
CN208884318U (en) Bridge construction evenness of road surface device
CN220521193U (en) Road cleaning sweeping machine for recycling sewage
CN214607445U (en) Concrete mixer car washing platform
CN209719535U (en) A kind of spray maintenance device
CN212921466U (en) Dust removal device for construction site vehicle
CN217277646U (en) Device for measuring fluidity of mortar
CN219006036U (en) Placing rack for railway line tamping tools
CN218858361U (en) Muck car washing equipment for earthwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant