CN220336411U - Protection platform lifting point truss for building construction - Google Patents

Protection platform lifting point truss for building construction Download PDF

Info

Publication number
CN220336411U
CN220336411U CN202321820984.9U CN202321820984U CN220336411U CN 220336411 U CN220336411 U CN 220336411U CN 202321820984 U CN202321820984 U CN 202321820984U CN 220336411 U CN220336411 U CN 220336411U
Authority
CN
China
Prior art keywords
vertical rod
lifting
fixedly connected
close
device main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321820984.9U
Other languages
Chinese (zh)
Inventor
刘帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Shengshuai Construction Engineering Co ltd
Original Assignee
Shanxi Shengshuai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Shengshuai Construction Engineering Co ltd filed Critical Shanxi Shengshuai Construction Engineering Co ltd
Priority to CN202321820984.9U priority Critical patent/CN220336411U/en
Application granted granted Critical
Publication of CN220336411U publication Critical patent/CN220336411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building engineering, and provides a protection platform lifting point truss for building construction, which comprises a device main body and further comprises: the device comprises a device main body, a first vertical rod, a second vertical rod, a plurality of cross rods and a plurality of guide rails, wherein the first vertical rod is fixedly connected to a section, close to the left side, of the device main body; when the lifting device is used, the lifting device is firstly arranged on the side face of the vertical rod group at the side of the guide rail, a bearing truss is formed by the vertical rods at the inner side and the outer side, the lower hook of the electric lifter is used for hooking a load sensor, the lower side of the load sensor is connected with the lower lifting frame connecting piece through a bearing pin, and the lower lifting frame connecting piece is fixedly connected with a plurality of grooves on the hanging plate at the hanging point through bolts; the frame body load is transmitted to a structural object outside the frame body through the electric hoist and the lifting support, so that the lifting purpose is realized, and the lifting frame has the characteristics of simple structure, convenience in disassembly and installation, high stability and the like.

Description

Protection platform lifting point truss for building construction
Technical Field
The utility model relates to the technical field of building engineering, in particular to a protection platform lifting point truss for building construction.
Background
The attached lifting operation safety protection platform for building construction is a construction operation platform which is erected to a certain height and attached to an engineering structure, can climb or descend layer by layer along with the engineering structure by means of lifting equipment and devices of the safety protection platform, and has the functions of safety protection, tilting prevention, falling prevention and synchronous lifting.
However, the lifting machine of the attached lifting operation safety protection platform for building construction is often arranged outside the frame body, manual transportation is needed during movement, and the lifting machine is extremely inconvenient, so that the lifting machine is designed and installed in the frame body, certain requirements are met for the lifting point truss, the existing lifting point truss is generally selected on a pavement plate at an installation position, the occupied area is large, the frame body corridor is easy to block, the passing is difficult, and accidents are easy to occur.
Disclosure of Invention
The utility model aims to solve the problems that the existing lifting machine of the attached lifting operation safety protection platform for building construction is often arranged outside a frame body, needs manual transportation during movement, is extremely inconvenient, and has certain requirements on a lifting point truss by specially installing the lifting machine in the frame body, the existing lifting point truss is generally selected on a pavement plate in an installation position, the occupied area is large, the frame body gallery is easy to be blocked, and the passing is difficult and accidents are easy to occur.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a protection platform hoisting point truss for construction, includes the device main part, still includes:
the device comprises a device main body, a first vertical rod, a second vertical rod, a plurality of cross rods and a plurality of connecting rods, wherein the first vertical rod is fixedly connected to one end, close to the left side, of the device main body;
the hanging point hanging plate is fixedly connected to one side, close to the top, of the upper outer surface of the second vertical rod, and the hanging point hanging plate is fixedly connected with a cross rod, close to the top of the second vertical rod.
Preferably, the top of being close to a plurality of on the outer wall of second montant is fixedly connected with bracing respectively, a plurality of the bracing is kept away from a plurality of horizontal pole one side all fixed connection is in on the first montant.
Preferably, the first vertical rod is close to the same fixed mounting of equidistance on the outer wall of second montant has a plurality of backing plates.
Compared with the prior art, the utility model has the advantages and positive effects that:
when the electric hoisting machine is used, the electric hoisting machine is firstly arranged on the side surface of the vertical rod group on the side of the guide rail, a bearing truss is formed by the first vertical rods and the second vertical rods on the inner side and the outer side, the connecting and supporting functions are achieved, the cross rods and the diagonal braces are mutually welded and fixed, the supporting and reinforcing functions are achieved on the whole structure, the stability of the whole structure in running and working is improved, the load sensor is hooked under the electric hoisting machine, the lower side of the load sensor is connected with the lower hoisting frame connecting piece through a bearing pin, and the lower hoisting frame connecting piece is fixedly connected with a plurality of grooves on the hanging plate of the hoisting point through bolts; the frame load is transferred to a structure outside the device main body through the electric hoist and the lifting support, so that the lifting purpose is realized, and the lifting support is fixed on a building through a through-wall bolt.
Drawings
FIG. 1 is a schematic diagram of a front perspective view of a protective platform lifting point truss for construction of the present utility model;
FIG. 2 is a schematic side view of a structure of a lifting point truss of a protection platform for construction of the present utility model;
FIG. 3 is a schematic top perspective view of a protective platform lifting point truss for construction of the present utility model;
fig. 4 is a schematic bottom perspective view of a lifting point truss of a protection platform for construction.
Legend description: 1. a device body; 2. a first vertical rod; 3. hanging plates at hanging points; 4. a second vertical rod; 5. a cross bar; 6. a backing plate; 7. and (5) diagonal bracing.
Detailed Description
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
Embodiment 1, as shown in fig. 1-4, the present utility model provides a protection platform lifting point truss for construction, which comprises a device main body 1, and further comprises:
the first vertical rod 2 is fixedly connected to one end, close to the left side, of the device main body 1, one side, close to the first vertical rod 2, of the device main body 1 is fixedly connected with the second vertical rod 4, the outer wall, close to the second vertical rod 4, of the first vertical rod 2 is fixedly connected with a plurality of cross rods 5 in equal intervals, one side, far from the first vertical rod 2, of the plurality of cross rods 5 is fixedly connected to the outer wall of the second vertical rod 4, and the effect is mainly that the stability of a frame is improved through the fact that the plurality of cross rods 5 between the first vertical rod 2 and the second vertical rod 4 are fixedly connected, and the integral structure can stably run during working;
the hanging point hanging plate 3 is fixedly connected to one side, close to the top, of the upper outer surface of the second vertical rod 4, and the hanging point hanging plate 3 is fixedly connected with the cross rod 5, close to the top of the second vertical rod 4, and is used for carrying a corresponding load sensor mainly through the hanging point hanging plate 3.
Further, as shown in fig. 1-4, the top parts, close to the plurality of cross bars 5, on the outer wall of the second vertical bar 4 are respectively and fixedly connected with inclined struts 7, and one sides, far away from the plurality of cross bars 5, of the plurality of inclined struts 7 are fixedly connected to the first vertical bar 2, so that the effect is that the stability of the whole structure is further enhanced and supported mainly through the plurality of inclined struts 7.
Further, as shown in fig. 1-4, a plurality of backing plates 6 are fixedly installed on the outer wall of the first vertical rod 2, which is close to the second vertical rod 4, at equal intervals, and the effect is mainly to strengthen the stability of the structure, and meanwhile, the installation and the disassembly of workers are facilitated.
Working principle: the utility model is firstly arranged on the side surface of the vertical rod group at the side of the guide rail when in use, a bearing truss is formed by the first vertical rod 2 and the second vertical rod 4 at the inner side and the outer side, the connecting and supporting functions are realized, the cross rods 5 and the diagonal braces 7 are mutually welded and fixed, the supporting and reinforcing functions are realized on the whole structure, the stability of the whole structure during operation is improved, the load sensor is hooked under the electric hoist (endless chain electric hoist), the lower side of the load sensor is connected with the lower lifting frame connecting piece through a bearing pin, and the lower lifting frame connecting piece is fixedly connected with a plurality of grooves on the hanging plate 3 at the lifting point through bolts; the frame load is transferred to a structure outside the device main body 1 through the electric hoist and the lifting support, so that the lifting purpose is realized, and the lifting support is fixed on a building through a through-wall bolt.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.

Claims (3)

1. The utility model provides a protection platform hoisting point truss for construction, includes device main part (1), its characterized in that still includes:
the device comprises a first vertical rod (2), a second vertical rod (4) and a plurality of transverse rods (5), wherein the first vertical rod (2) is fixedly connected to one end, close to the left side, of the device main body (1), one side, far away from the first vertical rod (2), of the device main body (1), the first vertical rod (2) is fixedly connected to the outer wall, close to the second vertical rod (4), of the first vertical rod, the plurality of transverse rods (5) are fixedly connected to the outer wall of the second vertical rod (4) at equal intervals, and one side, far away from the first vertical rod (2), of the transverse rods (5) is fixedly connected to the outer wall of the second vertical rod (4);
the hanging point hanging plate (3) is fixedly connected to one side, close to the top, of the upper outer surface of the second vertical rod (4), and the hanging point hanging plate (3) is fixedly connected with the cross rod (5) close to the top of the second vertical rod (4).
2. The protective platform lifting point truss for building construction according to claim 1, wherein: the top that is close to a plurality of on the outer wall of second montant (4) horizontal pole (5) is fixedly connected with bracing (7) respectively, and a plurality of bracing (7) keep away from one side of a plurality of horizontal pole (5) is all fixedly connected with on first montant (2).
3. The protective platform lifting point truss for building construction according to claim 2, wherein: a plurality of backing plates (6) are fixedly arranged on the outer wall of the first vertical rod (2) close to the second vertical rod (4) at equal intervals.
CN202321820984.9U 2023-07-12 2023-07-12 Protection platform lifting point truss for building construction Active CN220336411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321820984.9U CN220336411U (en) 2023-07-12 2023-07-12 Protection platform lifting point truss for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321820984.9U CN220336411U (en) 2023-07-12 2023-07-12 Protection platform lifting point truss for building construction

Publications (1)

Publication Number Publication Date
CN220336411U true CN220336411U (en) 2024-01-12

Family

ID=89460220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321820984.9U Active CN220336411U (en) 2023-07-12 2023-07-12 Protection platform lifting point truss for building construction

Country Status (1)

Country Link
CN (1) CN220336411U (en)

Similar Documents

Publication Publication Date Title
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN107090968B (en) Lifting method of integrated attached lifting scaffold
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN206581577U (en) Using housing construction builder's jack
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN101440660B (en) Guiding-rail attached lifting scaffold
CN220336411U (en) Protection platform lifting point truss for building construction
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN215858977U (en) Bearing structure fixed on steel material shed
CN113404278B (en) Self-climbing type protection frame and climbing method thereof
CN201141203Y (en) Guiding-rail attached lifting scaffold
CN211873772U (en) Externally-hung operating steel platform
CN213572927U (en) Movable steel platform with adjustable size and capable of being circulated
CN209957241U (en) Steel hanger
CN110886225A (en) Construction method of cable tower stay cable installation system
CN110821133B (en) Externally-hung operation steel platform and construction method thereof
CN208899840U (en) For volumed space building inner top constructing device
CN206829587U (en) A kind of hydraulic climbing formwork wall-attached frame
CN112502473A (en) Support bearing capacity conversion device and method for dismantling large steel framework by using same
CN112502475A (en) Supporting bearing capacity conversion device and using method thereof
CN216240384U (en) Operation platform assembly with ladder stand suitable for steel structure high altitude installation
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN217203935U (en) Trash rack pier template hoisting device
CN215331380U (en) Rail type suspension platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant