CN220316181U - Temporary storage device used before stacking of section steel - Google Patents

Temporary storage device used before stacking of section steel Download PDF

Info

Publication number
CN220316181U
CN220316181U CN202321889707.3U CN202321889707U CN220316181U CN 220316181 U CN220316181 U CN 220316181U CN 202321889707 U CN202321889707 U CN 202321889707U CN 220316181 U CN220316181 U CN 220316181U
Authority
CN
China
Prior art keywords
connecting rod
roller way
conveying roller
hinged
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321889707.3U
Other languages
Chinese (zh)
Inventor
冀飞
段乃圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Zhengfeng Iron&steel Co ltd
Original Assignee
Tangshan Zhengfeng Iron&steel Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Zhengfeng Iron&steel Co ltd filed Critical Tangshan Zhengfeng Iron&steel Co ltd
Priority to CN202321889707.3U priority Critical patent/CN220316181U/en
Application granted granted Critical
Publication of CN220316181U publication Critical patent/CN220316181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stacking Of Articles And Auxiliary Devices (AREA)

Abstract

The utility model relates to a temporary storage device for profile steel before stacking, and belongs to the technical field of profile steel production equipment in the metallurgical industry. The technical proposal is as follows: the device is arranged on a conveying roller way (12) before profile steel stacking, at least comprises a front conveying roller way and a rear conveying roller way according to the running direction of the profile steel conveying roller way (12), an upper plate (9) and a lower plate (10) which are matched with profile steel (13) on the conveying roller way (12) are arranged on the upper portion of a material frame (8), one ends of a first connecting rod (3) and a second connecting rod (6) are respectively hinged to the lower portion of the material frame (8), the other end of the second connecting rod (6) is hinged to a support (7), the other end of the first connecting rod (3) is hinged to a cylinder rod of a double-stroke cylinder (1), and a cylinder body of the double-stroke cylinder (1) is hinged to a cylinder support (2). The beneficial effects of the utility model are as follows: under the condition that the lifting mechanism cannot timely convey the section steel on the roller table to the position before stacking, the section steel can be temporarily stored, and the production efficiency is improved.

Description

Temporary storage device used before stacking of section steel
Technical Field
The utility model relates to a temporary storage device for profile steel before stacking, and belongs to the technical field of profile steel production equipment in the metallurgical industry.
Background
In the section steel production process, finished section steel is required to be conveyed to a front chain of a stacker via a roller way before stacking, the finished section steel on the roller way is lifted from the roller way by a lifting device and is conveyed to a stacking chain bed via the chain, and the conveying of the finished section steel on the roller way is hindered due to the fact that a chain arm is at a high position in a cycle period of a lifting mechanism, and particularly when small-size section steel is rolled, the production rhythm is faster, and the rhythm of a previous procedure is influenced due to the fact that the steel on the roller way cannot be timely conveyed to the front of stacking, so that the production is influenced.
Disclosure of Invention
The utility model aims to provide a temporary storage device for section steel before stacking, which can realize temporary storage of section steel before stacking and solve the problems in the background technology.
The technical scheme of the utility model is as follows:
the utility model provides a interim strorage device before shaped steel pile up neatly, the device sets up on the rollgang before shaped steel pile up neatly, according to the direction of operation of shaped steel rollgang, constitute by two sets of around at least, every group all contains double stroke hydro-cylinder, the hydro-cylinder support, connecting rod one, connecting rod two, the support, work or material rest, upper plate and hypoplastron, the upper portion of work or material rest is equipped with shaped steel matched with upper plate and hypoplastron on the rollgang, one end of connecting rod one and connecting rod two articulates the lower part at the work or material rest respectively, the other end of connecting rod two articulates on the support, the other end of connecting rod one articulates with the jar pole of double stroke hydro-cylinder, the cylinder body of double stroke hydro-cylinder articulates on the hydro-cylinder support.
Further, the first connecting rod is L-shaped, and the middle of the first connecting rod is rotationally connected to the shaft seat through a pin shaft.
Further, the first connecting rod, the second connecting rod and the material frame form a four-connecting rod mechanism.
Further, the connecting rod is located above the first connecting rod.
Further, the shaft seat and the support are respectively fixed on the support frame.
The beneficial effects of the utility model are as follows: under the condition that the lifting mechanism cannot timely convey the section steel on the roller table to the position before stacking, the section steel can be temporarily stored, and the production efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
in the figure: the double-stroke oil cylinder 1, an oil cylinder support 2, a first connecting rod 3, a pin shaft 4, an axle seat 5, a second connecting rod 6, a support 7, a material frame 8, an upper plate 9, a lower plate 10, a support frame 11, a conveying roller way 12 and profile steel 13.
Detailed Description
The utility model is further illustrated by way of example with reference to the accompanying drawings.
Referring to fig. 1, a temporary storage device before steel section stacking is arranged on a conveying roller way 12 before steel section stacking, and at least comprises a front group and a rear group according to the running direction of the steel section conveying roller way 12, wherein each group comprises a double-stroke oil cylinder 1, an oil cylinder support 2, a first connecting rod 3, a second connecting rod 6, a support 7, a material frame 8, an upper plate 9 and a lower plate 10, wherein the upper part of the material frame 8 is provided with the upper plate 9 and the lower plate 10 which are matched with the steel section 13 on the conveying roller way 12, one end of the first connecting rod 3 and one end of the second connecting rod 6 are respectively hinged to the lower part of the material frame 8, the other end of the second connecting rod 6 is hinged to the support 7, the other end of the first connecting rod 3 is hinged to a cylinder rod of the double-stroke oil cylinder 1, and the cylinder body of the double-stroke oil cylinder 1 is hinged to the oil cylinder support 2.
In this example, referring to fig. 1, the first link rod 3 is L-shaped, the middle of the first link rod 3 is rotatably connected to the shaft seat 5 through the pin 4, the second link rod 6 is located above the first link rod 3, and the first link rod 3, the second link rod 6 and the material rack 8 form a four-link mechanism.
When the double-stroke hydraulic cylinder is used, the front cylinder rod of the double-stroke hydraulic cylinder 1 extends out, the material rack 8 is lifted up through the four-bar linkage to reach a first position, and the section steel is transported through the roller way and stored on the upper plates 9 of the front material rack 8 and the rear material rack 8; the rear cylinder rod of the double-stroke cylinder 1 extends out, the material racks 8 continue to ascend, and the rear section steel is stored on the lower plates 10 of the front material rack 8 and the rear material rack 8, so that the section steel is temporarily stored.
The rear cylinder rod of the double-stroke cylinder 1 is retracted, the material racks 8 are lowered at the moment, and the section steel stored on the lower plates 10 of the front material rack 8 and the rear material rack 8 can be conveyed away by the roller way; the front cylinder rod of the double-stroke cylinder 1 is retracted, the material racks 8 continue to descend, and the section steel stored on the upper plates 9 of the front material rack 8 and the rear material rack 8 can be conveyed away by the roller way.

Claims (5)

1. Temporary storage device before shaped steel pile up neatly, its characterized in that: the device is arranged on a conveying roller way (12) before profile steel stacking, at least comprises a front group and a rear group according to the running direction of the profile steel conveying roller way (12), each group comprises a double-stroke oil cylinder (1), an oil cylinder support (2), a first connecting rod (3), a second connecting rod (6), a support (7), a material frame (8), an upper plate (9) and a lower plate (10), the upper part of the material frame (8) is provided with an upper plate (9) and a lower plate (10) which are matched with profile steel (13) on the conveying roller way (12), one ends of the first connecting rod (3) and the second connecting rod (6) are respectively hinged to the lower part of the material frame (8), the other end of the second connecting rod (6) is hinged to the support (7), and the other end of the first connecting rod (3) is hinged to a cylinder rod of the double-stroke oil cylinder (1), and the cylinder body of the double-stroke oil cylinder (1) is hinged to the oil cylinder support (2).
2. The temporary storage device for section steel before stacking according to claim 1, wherein: the first connecting rod (3) is L-shaped, and the middle of the first connecting rod (3) is rotationally connected to the shaft seat (5) through the pin shaft (4).
3. A temporary storage device for section steel before stacking according to claim 2, wherein: the first connecting rod (3), the second connecting rod (6) and the material rack (8) form a four-connecting-rod mechanism.
4. A temporary storage device for section steel before stacking according to claim 3, wherein: the second connecting rod (6) is positioned above the first connecting rod (3).
5. A temporary storage device for section steel before stacking according to claim 2, wherein: the shaft seat (5) and the support (7) are respectively fixed on the support frame (11).
CN202321889707.3U 2023-07-18 2023-07-18 Temporary storage device used before stacking of section steel Active CN220316181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321889707.3U CN220316181U (en) 2023-07-18 2023-07-18 Temporary storage device used before stacking of section steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321889707.3U CN220316181U (en) 2023-07-18 2023-07-18 Temporary storage device used before stacking of section steel

Publications (1)

Publication Number Publication Date
CN220316181U true CN220316181U (en) 2024-01-09

Family

ID=89416029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321889707.3U Active CN220316181U (en) 2023-07-18 2023-07-18 Temporary storage device used before stacking of section steel

Country Status (1)

Country Link
CN (1) CN220316181U (en)

Similar Documents

Publication Publication Date Title
CN206083971U (en) Material device is held in palm to rear -mounted modularization of plate shearing machine
CN201633939U (en) Folding machine
CN210504231U (en) Jacking transplanter that stability is good
CN220316181U (en) Temporary storage device used before stacking of section steel
CN205892051U (en) Conveyor is piled up to U -shaped mould
CN205736105U (en) A kind of fluid pressure type baling press for waste
CN107826966A (en) Hoisting steel plate clamping device
CN203284068U (en) Spreader for mold of concrete tubular pile
CN204621416U (en) T-steel automatic turning system
CN207312405U (en) One kind jacking transplantation device
CN201220240Y (en) Steel pipe elevator
CN212072377U (en) Jacking and overturning equipment for sleeper mold
CN202762883U (en) Steel plate stacking machine
CN210260040U (en) Fungus basket climbing conveyer belt
CN203843501U (en) Blank conveying system for elevator guide rail automatic machining production line
CN207844420U (en) The complete intelligent stacking machine of carton green production
CN207536714U (en) Can automatic lifting overturning kinds of goods conveying device
CN201647671U (en) Pitching stacker
CN214191697U (en) Unimpeded can receiving device
CN216606664U (en) Novel steel billet feeding device for steel rolling
CN201596718U (en) Lifting steel tube conveying damping device
CN201670590U (en) Large-area flat-plate stacker crane
CN209668710U (en) It is a kind of suitable for non-burning brick and fired brick self-tipping type crotch
CN206437841U (en) A kind of abandoned car, which is disassembled, uses Hoisting & turning device
CN215591675U (en) Position adjusting device for winding fabric

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant