CN220285383U - Novel protection canopy - Google Patents

Novel protection canopy Download PDF

Info

Publication number
CN220285383U
CN220285383U CN202321577836.9U CN202321577836U CN220285383U CN 220285383 U CN220285383 U CN 220285383U CN 202321577836 U CN202321577836 U CN 202321577836U CN 220285383 U CN220285383 U CN 220285383U
Authority
CN
China
Prior art keywords
posts
rectangular steel
steel pipe
pipe sleeve
bolt holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321577836.9U
Other languages
Chinese (zh)
Inventor
周亚亚
张小鹏
陶劲松
张志刚
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Third Construction Group Co ltd
Original Assignee
Anhui Construction Engineering Third Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Construction Engineering Third Construction Group Co ltd filed Critical Anhui Construction Engineering Third Construction Group Co ltd
Priority to CN202321577836.9U priority Critical patent/CN220285383U/en
Application granted granted Critical
Publication of CN220285383U publication Critical patent/CN220285383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a novel protective shed, which comprises an integral protective shed body, a plurality of top upright post sleeve posts, a plurality of middle upright post inserting posts and a plurality of bottom upright post sleeve posts, wherein the plurality of top upright post sleeve posts are fixed on the lower side surface of the integral protective shed body, the upper ends of the plurality of middle upright post inserting posts are respectively inserted into the plurality of top upright post sleeve posts and are fixedly connected, the lower ends of the plurality of middle upright post inserting posts are respectively inserted into the plurality of bottom upright post sleeve posts and are fixedly connected, and a plurality of lifting lugs are also fixed on the side surface of the integral protective shed body. The utility model solves the risk of ascending and installing by workers in practice, is convenient to install and disassemble, saves materials and cost, improves the installation efficiency and also solves a great hidden trouble for project safety management work.

Description

Novel protection canopy
Technical Field
The utility model relates to the technical field of building protection equipment, in particular to a novel protection shed.
Background
Building construction sites are a high-risk production activity. The danger sources in the construction site are more, the object falling strike belongs to one of the important danger sources of the site construction, the object falling strike is also a production safety accident which is extremely easy to occur in the construction site, the injury to site construction and management personnel is often fatal, irrecoverable loss is often caused to projects, the current installation of the protective shed often requires the workers to ascend one step and step to assemble, the labor and time are wasted, the danger of the installation operation of the workers on the protective shed roof is extremely huge, the amount of the used steel pipes and fasteners is large, the cost is often high, the safety coefficient is not high, and the overall stability of the protective shed is also poor.
Disclosure of Invention
The utility model aims to make up the defects of the prior art and provide a novel protective shed, which reduces the risk of worker ascending and solves the problems of time and labor waste and poor stability and safety existing in the protective shed formed by combining the steel pipe fasteners in the prior art.
The utility model is realized by the following technical scheme:
the utility model provides a novel protection canopy, including integral protection canopy body, a plurality of top stand loop column, a plurality of middle part stand loop column and a plurality of bottom stand loop column, a plurality of top stand loop column fix on the downside of integral protection canopy body, the upper end of a plurality of middle part stand loop columns insert a plurality of inside and fixed connection of top stand loop column respectively, the lower extreme of a plurality of middle part stand loop columns insert a plurality of bottom stand loop column inside and fixed connection respectively the side of integral protection canopy body still be fixed with a plurality of lugs.
The four top stand posts are sleeved with the four top stand posts, the top stand posts comprise a top connecting plate, a plurality of first bolt holes are formed in the top connecting plate, a rectangular first steel pipe sleeve is fixed on the lower side face of the top connecting plate, a plurality of second bolt holes are formed in the side face of the rectangular first steel pipe sleeve, and the top connecting plate is fixed on the whole protective shed body through high-strength bolts.
The bottom upright post sleeve column comprises four bottom connecting plates, a plurality of third bolt holes are formed in the bottom connecting plates, a second rectangular steel sleeve is fixed on the upper side surface of each bottom connecting plate, and a plurality of fourth bolt holes are formed in the side surface of each second rectangular steel sleeve.
The four middle upright posts are arranged, the middle upright posts are rectangular steel pipes, bolt holes five corresponding to the bolt holes II and the bolt holes IV are respectively formed in the upper side face and the lower side face of the rectangular steel pipes, the upper ends and the lower ends of the rectangular steel pipes are respectively inserted into the rectangular steel pipe sleeve I and the rectangular steel pipe sleeve II, the rectangular steel pipes are in clearance fit with the rectangular steel pipe sleeve I and the rectangular steel pipe sleeve II, and the rectangular steel pipes are fixedly connected with the rectangular steel pipe sleeve I and the rectangular steel pipe sleeve II through high-strength bolts.
The utility model has the advantages that: the protective shed body is formed by first installing and shaping, then installing the protective shed body with the top upright post sleeve and the middle inserted post on the ground, and finally installing the protective shed body with the bottom upright post sleeve by hoisting once.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the integral protective shed body;
FIG. 3 is a schematic view of a top column jacket structure;
FIG. 4 is a schematic view of a bottom column jacket structure;
fig. 5 is a schematic diagram of a middle column insert.
Detailed Description
1-5, a novel protection canopy, including integral protection canopy body 2, a plurality of top stand loop column 3, a plurality of middle part stand loop column 4 and a plurality of bottom stand loop column 5, a plurality of top stand loop column 3 fix on the downside of integral protection canopy body 2, the upper end of a plurality of middle part stand loop column 4 insert a plurality of inside and fixed connection of top stand loop column 3 respectively, the lower extreme of a plurality of middle part stand loop column 4 insert a plurality of bottom stand loop column 5 respectively inside and fixed connection the side of integral protection canopy body 2 still be fixed with a plurality of lugs 6. The integral protective shed body 2 can be fixedly connected with the top upright post sleeve column 3 and the middle upright post inserting column 4 in advance, so that the ascending installation of workers is avoided, and the operation risk of the workers is reduced. The lifting lug 6 can realize double-layer protection before lifting, and the advertising board is installed in advance.
The four top stand posts 3 are arranged, the top stand posts 3 comprise a top connecting plate 31, a plurality of first bolt holes 32 are formed in the top connecting plate 31, a first rectangular steel pipe sleeve 33 is fixed on the lower side surface of the top connecting plate 31, a plurality of second bolt holes 34 are formed in the side surface of the first rectangular steel pipe sleeve 33, and the top connecting plate 31 is fixed on the whole protective shed body 2 through high-strength bolts 1.
The four bottom upright post sleeves 5 are arranged, the bottom upright post sleeves 5 comprise a bottom connecting plate 51, a plurality of third bolt holes 52 are formed in the bottom connecting plate 51, a second rectangular steel pipe sleeve 53 is fixed on the upper side surface of the bottom connecting plate 51, a plurality of fourth bolt holes 54 are formed in the side surface of the second rectangular steel pipe sleeve 53, and the bottom connecting plate 51 is fixed on an embedded foundation through a high-strength bolt 1. The pre-buried foundation strength level should be at least 80% of the design.
The four middle upright posts 4 are arranged, the middle upright post 4 is a rectangular steel pipe 41, bolt holes five 42 corresponding to the bolt holes two 34 and the bolt holes four 54 are respectively formed in the upper side face and the lower side face of the rectangular steel pipe 41, the upper end and the lower end of the rectangular steel pipe 41 are respectively inserted into the first rectangular steel pipe sleeve 33 and the second rectangular steel pipe sleeve 53, the rectangular steel pipe 41 is in clearance fit with the first rectangular steel pipe sleeve 33 and the second rectangular steel pipe sleeve 53, and the rectangular steel pipe 41 is fixedly connected with the first rectangular steel pipe sleeve 33 and the second rectangular steel pipe sleeve 53 through the high-strength bolts 1.
When the strength of the concrete embedded foundation reaches 80% of the design strength, workers start to arrange to assemble the protective shed, the protective shed comprises welding lifting lugs 6 on the integral protective shed body, then using high-strength bolts to install the top column sleeve 3, the integral roof protective shed body 2 and the middle column inserting column 4, then installing the bottom column sleeve 5, finally arranging an automobile crane to hoist the integral protective shed body 2, enabling the lower end of the middle column inserting column 4 to completely enter the bottom column sleeve 5, then using the high-strength bolts to connect, and finally completing installation.
The dimension specification of the middle column insert 4 is 195mm multiplied by 95mm multiplied by 5mm.
The dimensions of the top column sleeve 3 are 200mm x 100mm x 5mm.
The dimensions of the bottom column sleeve 5 are 200mm x 100mm x 5mm.
Lifting lug 6 is a reinforcing steel bar of phi 16 of HPB 300.
The bolts are 8.8-level M16 high-strength bolts.

Claims (4)

1. A novel protection canopy, its characterized in that: including integral protection canopy body, a plurality of top stand loop posts, a plurality of middle part stand loop posts and a plurality of bottom stand loop posts, a plurality of top stand loop posts fix on the downside of integral protection canopy body, the upper end of a plurality of middle part stand loop posts insert a plurality of inside and fixed connection of top stand loop posts respectively, the lower extreme of a plurality of middle part stand loop posts insert a plurality of bottom stand loop posts respectively inside and fixed connection the side of integral protection canopy body still be fixed with a plurality of lugs.
2. A novel shelter as claimed in claim 1, wherein: the four top stand posts are sleeved with the four top stand posts, the top stand posts comprise a top connecting plate, a plurality of first bolt holes are formed in the top connecting plate, a rectangular first steel pipe sleeve is fixed on the lower side face of the top connecting plate, a plurality of second bolt holes are formed in the side face of the rectangular first steel pipe sleeve, and the top connecting plate is fixed on the whole protective shed body through high-strength bolts.
3. A novel shelter as claimed in claim 2 wherein: the bottom upright post sleeve column comprises four bottom connecting plates, a plurality of third bolt holes are formed in the bottom connecting plates, a second rectangular steel sleeve is fixed on the upper side surface of each bottom connecting plate, and a plurality of fourth bolt holes are formed in the side surface of each second rectangular steel sleeve.
4. A novel shelter as claimed in claim 3, in which: the four middle upright posts are arranged, the middle upright posts are rectangular steel pipes, bolt holes five corresponding to the bolt holes II and the bolt holes IV are respectively formed in the upper side face and the lower side face of the rectangular steel pipes, the upper ends and the lower ends of the rectangular steel pipes are respectively inserted into the rectangular steel pipe sleeve I and the rectangular steel pipe sleeve II, the rectangular steel pipes are in clearance fit with the rectangular steel pipe sleeve I and the rectangular steel pipe sleeve II, and the rectangular steel pipes are fixedly connected with the rectangular steel pipe sleeve I and the rectangular steel pipe sleeve II through high-strength bolts.
CN202321577836.9U 2023-06-20 2023-06-20 Novel protection canopy Active CN220285383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321577836.9U CN220285383U (en) 2023-06-20 2023-06-20 Novel protection canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321577836.9U CN220285383U (en) 2023-06-20 2023-06-20 Novel protection canopy

Publications (1)

Publication Number Publication Date
CN220285383U true CN220285383U (en) 2024-01-02

Family

ID=89330045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321577836.9U Active CN220285383U (en) 2023-06-20 2023-06-20 Novel protection canopy

Country Status (1)

Country Link
CN (1) CN220285383U (en)

Similar Documents

Publication Publication Date Title
CN210067544U (en) Prefabricated steel structure protective shed frame for railway business line
CN111472530A (en) Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof
CN220285383U (en) Novel protection canopy
CN111648597A (en) Silo hangs a formula steel truss bracket bearing structure
CN108204039A (en) A kind of assembled architecture truss structure
CN207905104U (en) A kind of assembled architecture truss structure
CN104164889A (en) Demountable tower crane foundation
CN214614570U (en) Assembled steel truss beam column connection part
CN216512520U (en) Lifting system suitable for small space
CN111519949B (en) Convenient assembly steel construction reinforcing bar processing protection canopy of tearing open
CN212478675U (en) Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open
CN215885954U (en) Construction elevator foundation supporting structure
CN216142382U (en) Scaffold fixing fastener and scaffold system based on H-shaped stand column
CN213204913U (en) Modular prefabricated staircase operation platform
CN211644419U (en) Assembled tower crane overhauls platform
CN208747537U (en) A kind of combined bay that lifting jack detachable load is combined with guiding
CN111056460A (en) Assembled tower crane maintenance platform and installation method
CN217998886U (en) Narrow space climbing platform
CN216196481U (en) Temporary fixation draws bearing structure to one side
CN219196671U (en) Modularized silo construction stair
CN215631492U (en) Detachable elevator shaft protection support frame
CN213952945U (en) Safety protection device for overhanging layer of external scaffold
CN220058310U (en) Assembled steel structure frame