CN220284877U - Concrete pipe gallery performance improvement structure - Google Patents

Concrete pipe gallery performance improvement structure Download PDF

Info

Publication number
CN220284877U
CN220284877U CN202321862416.5U CN202321862416U CN220284877U CN 220284877 U CN220284877 U CN 220284877U CN 202321862416 U CN202321862416 U CN 202321862416U CN 220284877 U CN220284877 U CN 220284877U
Authority
CN
China
Prior art keywords
pipe gallery
corner
side wall
plate
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321862416.5U
Other languages
Chinese (zh)
Inventor
闻雨
黄建波
陈林军
程文
甘凯
郭鸿杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN202321862416.5U priority Critical patent/CN220284877U/en
Application granted granted Critical
Publication of CN220284877U publication Critical patent/CN220284877U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a concrete pipe gallery performance improving structure, which comprises: a prefabricated support body is inserted in a groove in the foundation soil at the lower part of the pipe gallery bottom plate, an expansion compacting body is poured in a cavity of the prefabricated support body, and a loose support body is filled in the foundation soil at the upper part of the prefabricated support body; and a pipe gallery side wall and a pipe gallery top plate are constructed above the pipe gallery bottom plate. The beneficial effects of the utility model are as follows: the prefabricated support body and the loose support body are arranged in the foundation soil body at the lower part of the pipe gallery bottom plate, so that the functions of transmitting and sharing upper load can be synchronously realized, and the bearing performance of the foundation soil body is improved; the corner water interception plate and the corner drainage body are arranged outside the side wall of the pipe gallery, so that the functions of intercepting a corner water seepage channel and rapidly draining water can be achieved, and corner water seepage is prevented from entering the cavity of the pipe gallery; the reinforcing buttress and the upper bearing plate are arranged at the top of the side wall of the pipe gallery, so that the pressure dispersing effect can be achieved, and the shearing stress of the joint part of the side wall of the pipe gallery and the management top plate is reduced.

Description

Concrete pipe gallery performance improvement structure
Technical Field
The utility model relates to the field of cast-in-situ reinforced concrete pipe gallery engineering, in particular to a concrete pipe gallery performance improving structure.
Background
In the construction engineering of sponge cities, the concrete pipe gallery is widely applied. In the pipe gallery construction process, how to improve the overall stability of the pipe gallery structure and reduce the infiltration of external water bodies is always an important point and a difficult point of engineering control.
There is a high strength concrete pipe gallery, including piping lane main part, connecting rod, connecting seat, carriage, stiffener and concrete pipe wall, through being fixed with the connecting seat that is higher than the concrete pipe wall at the both ends of piping lane main part to all install seal coil on the connecting seat, not only can be convenient for the erection joint of piping lane main part, increase the leakproofness of piping lane main part, and avoid the inside liquid of soil inside to flow into the inside of piping lane main part by adjacent two junction seat departments. But the structure is difficult to reinforce the pipe gallery structure from the aspects of improving the bearing capacity of the foundation, sharing the soil pressure on the upper part of the pipe gallery, rapidly removing the soil body on the back of the wall and the like.
In view of this, in order to improve the bearing performance of the pipe gallery structure, it is currently required to invent a concrete pipe gallery performance improving structure capable of enhancing the stability of the pipe gallery structure and improving the external waterproof performance of the pipe gallery.
Disclosure of Invention
The utility model aims to overcome the defects in the prior art and provides a concrete pipe gallery performance improving structure.
According to the concrete pipe gallery performance improving structure, the prefabricated support body is inserted in the foundation soil body at the lower part of the pipe gallery bottom plate through grooving, an expansion compacting body is poured in a cavity of the prefabricated support body, and loose support bodies are filled in the foundation soil body at the upper part of the prefabricated support body; a pipe gallery side wall and a pipe gallery top plate are constructed above the pipe gallery bottom plate, and reinforcing piers are longitudinally arranged at intervals along the pipe gallery side wall at the top of the pipe gallery side wall; the side, away from the cavity of the pipe gallery, of the side wall of the pipe gallery is provided with a corner water interception plate and a corner drainage body along the longitudinal through length of the side wall of the pipe gallery; a wall side filling body is arranged above the corner water interception plate and the corner drainage body; the upper surfaces of the pipe gallery top plate and the reinforcing piers are provided with upper bearing plates; the upper cover layer is laid on the upper parts of the pipe gallery top plate, the wall side filling body and the external soil body.
Preferably, the prefabricated support body is made of reinforced concrete material, is in a truncated cone shape or a prismatic table shape, is inserted into foundation soil in a large-small manner, and is provided with side wall holes on the side wall.
Preferably, the loose support is a dense graded crushed stone or gravel material.
Preferably, the corner water interception plate is formed by rolling steel plates, the cross section of the corner water interception plate is L-shaped, and the corner water interception plate is distributed along the joint length of the side wall of the pipe gallery and the bottom plate of the pipe gallery.
Preferably, the corner drainage body is made of medium coarse sand or sandy soil, the outer surface of the wall side filling body is flush with the corner drainage body, and the upper surface of the wall side filling body is flush with the reinforcing buttress.
Preferably, the cross section of the reinforcement support pier is right trapezoid, is made of reinforced concrete, and is connected with the side wall of the pipe gallery through an anchoring bolt, and the upper surface of the reinforcement support pier is flush with the upper surface of the pipe gallery top plate.
Preferably, the expansion pressing body is made of water-swelling rubber.
Preferably, a corner drain pipe is laid in the corner drain body, and the corner drain pipe adopts a drain hose and is communicated with external drainage equipment.
Preferably, the upper bearing plate is a steel plate or a precast concrete plate.
The beneficial effects of the utility model are as follows:
1) The prefabricated support body and the loose support body are arranged in the foundation soil body at the lower part of the pipe gallery bottom plate, so that the functions of transmitting and sharing upper load can be synchronously realized, and the bearing performance of the foundation soil body is improved.
2) The corner water interception plate and the corner drainage body are arranged outside the side wall of the pipe gallery, so that the functions of cutting off a corner water seepage channel and rapidly draining water can be achieved, and corner water seepage is prevented from entering the cavity of the pipe gallery.
3) The reinforcing buttress and the upper bearing plate are arranged at the top of the side wall of the pipe gallery, so that the pressure dispersing effect can be achieved, and the shearing stress of the joint part of the side wall of the pipe gallery and the management top plate is reduced.
Drawings
FIG. 1 is a schematic view of a concrete piping lane performance enhancing structure.
In the figure: 1-a pipe gallery floor; 2-prefabricating a support; 2-prefabricating a support; 3-loose support; 4-side walls of pipe gallery; 5-piping lane top plate; 6-reinforcing the bracing piers; 7-corner water interception plates; 8-corner drainage body; 9-corner drain pipes; 10-wall side filler; 11-an upper bearing plate; 12-an upper cover layer; 13-expanding the compact; 14-foundation soil mass; 15-sidewall holes; 16-external soil mass.
Detailed Description
The utility model is further described below with reference to examples. The following examples are presented only to aid in the understanding of the utility model. It should be noted that it will be apparent to those skilled in the art that modifications can be made to the present utility model without departing from the principles of the utility model, and such modifications and adaptations are intended to be within the scope of the utility model as defined in the following claims.
As an example, as shown in fig. 1, a concrete pipe gallery performance improving structure is provided, a prefabricated support body 2 is inserted by grooving in a foundation soil body 14 at the lower part of a pipe gallery bottom plate 1, an expansion compacting body 13 is poured into a cavity of the prefabricated support body 2, and then a loose support body 3 is filled outside the prefabricated support body 2; after the construction of the pipe gallery bottom plate 1 is completed, synchronously constructing the pipe gallery side wall 4 and the pipe gallery top plate 5 by using the support die, and longitudinally and uniformly arranging reinforcing piers 6 at intervals along the pipe gallery side wall 4 at the top of the pipe gallery side wall 4; a corner water interception plate 7 and a corner drainage body 8 are arranged on the outer side of the pipe gallery side wall 4, away from the cavity side of the pipe gallery, along the longitudinal through length of the pipe gallery side wall 4, and a corner drainage pipe 9 is paved in the corner drainage body 8; a wall side filling body 10 is arranged on the outer side of the pipe gallery side wall 4, which is away from the cavity side of the pipe gallery; an upper bearing plate 11 is arranged on the upper surfaces of the pipe gallery top plate 5 and the reinforcing piers 6; an upper covering layer 12 is laid on the pipe gallery ceiling 5, the wall-side packing 10, and the upper part of the external soil body.
The pipe gallery bottom plate 1, the pipe gallery side walls 4 and the pipe gallery top plate 5 are made of reinforced concrete materials, and the thicknesses of the reinforced concrete materials are 30cm, 20cm and 20cm respectively.
The foundation soil body 14 is cohesive soil in a hard plastic state, the prefabricated support bodies 2 are slotted and inserted in the foundation soil body 14, and the longitudinal intervals of the prefabricated support bodies 2 are 2m; the prefabricated support body 2 is made of reinforced concrete, the strength grade of the concrete is C30, the concrete is prefabricated into a round table shape, the height is 1m, the diameter of the bottom surface is 50cm, the diameter of the top surface is 30cm, and the side wall of the prefabricated support body 2 is provided with a side wall hole 15 with the diameter of 20cm.
And filling an expansion compacting body 13 in the cavity of the prefabricated support body 2, wherein the expansion compacting body 13 adopts water-swelling rubber.
The loose supporting body 3 is filled in the foundation soil 14 at the upper part of the prefabricated supporting body 2, the loose supporting body 3 adopts dense graded broken stone, and the maximum nominal grain diameter is 37.5mm.
Reinforcing piers 6 are uniformly arranged at intervals longitudinally along the pipe gallery side wall 4 at the top of the pipe gallery side wall 4; the reinforcement buttress 6 adopts reinforced concrete material, and the transversal trapezoid that is highly 30cm passes through anchor bolted connection with piping lane side wall 4, and reinforcement buttress 6 upper surface flushes with piping lane roof 5 upper surface.
The outside of the pipe gallery side wall 4 deviates from the pipe gallery cavity side and is provided with a corner water interception plate 7 and a corner drainage body 8 along the longitudinal through length of the pipe gallery side wall 4, the corner water interception plate 7 is formed by rolling a steel plate with the thickness of 2mm, the cross section is L-shaped, and the pipe gallery side wall 4 and the pipe gallery bottom plate 1 are distributed along the joint through length. The corner drainage body 8 adopts medium coarse sand with uniform grain size, the outer surface of the wall side filling body 10 is flush with the corner drainage body 8, and the upper surface of the wall side filling body 10 is flush with the reinforcing bracing pier 6.
A corner drain pipe 9 is paved in the corner drain body 8, and the corner drain pipe 9 is communicated with external drainage equipment by adopting a drain hose with the diameter of 60 mm.
The wall side filling body 10 is arranged above the corner water interception plate 7 and the corner drainage body 8, and the wall side filling body 10 adopts medium coarse sand.
An upper bearing plate 11 is arranged on the upper surfaces of the pipe gallery top plate 5 and the reinforcing piers 6, and the upper bearing plate 11 is formed by rolling a steel plate with the thickness of 10mm, and the width is 20cm.
An upper coating layer 12 was laid on the pipe gallery ceiling 5, the wall-side packing 10 and the outer soil body 16, and sandy soil was used for the upper coating layer 12, with a compaction degree of 95%.
The outer soil body 16 is clay soil.

Claims (9)

1. A concrete pipe gallery performance promotes structure, its characterized in that: a prefabricated support body (2) is inserted in a groove in a foundation soil body (14) at the lower part of the pipe gallery bottom plate (1), an expansion pressing body (13) is poured in a cavity of the prefabricated support body (2), and a loose support body (3) is filled in the foundation soil body (14) at the upper part of the prefabricated support body (2); a pipe gallery side wall (4) and a pipe gallery top plate (5) are constructed above the pipe gallery bottom plate (1), and reinforcing piers (6) are arranged at the top of the pipe gallery side wall (4) along the longitudinal interval of the pipe gallery side wall (4); a corner water interception plate (7) and a corner drainage body (8) are arranged on the side, away from the cavity of the pipe gallery, of the pipe gallery side wall (4) along the longitudinal through length of the pipe gallery side wall (4); a wall side filling body (10) is arranged above the corner water interception plate (7) and the corner drainage body (8); the upper surfaces of the pipe gallery top plate (5) and the reinforcing support piers (6) are provided with upper bearing plates (11); an upper covering layer (12) is laid on the upper parts of the pipe gallery top plate (5), the wall side filling body (10) and the external soil body (16).
2. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the prefabricated support body (2) is made of reinforced concrete and is in a truncated cone shape or a prismatic table shape, the prefabricated support body (2) is inserted into a foundation soil body (14) in a large and small mode from top to bottom, and side wall holes (15) are formed in the side walls of the prefabricated support body (2).
3. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the loose support body (3) is made of dense graded broken stone or gravel.
4. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the corner water interception plate (7) is formed by rolling steel plates, the cross section of the corner water interception plate is L-shaped, and the corner water interception plate (7) is distributed along the joint length of the pipe gallery side wall (4) and the pipe gallery bottom plate (1).
5. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the corner drainage body (8) is made of medium coarse sand or sandy soil, the outer surface of the wall side filling body (10) is flush with the corner drainage body (8), and the upper surface of the wall side filling body (10) is flush with the reinforcing support pier (6).
6. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the cross section of the reinforcement support pier (6) is right trapezoid, the reinforcement support pier (6) is made of reinforced concrete, the reinforcement support pier (6) is connected with the pipe gallery side wall (4) through an anchoring bolt, and the upper surface of the reinforcement support pier (6) is flush with the upper surface of the pipe gallery top plate (5).
7. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the expansion pressing body (13) is made of water-swelling rubber.
8. The concrete pipe gallery performance enhancing structure of claim 1, wherein: corner drainage pipes (9) are paved in the corner drainage bodies (8), and the corner drainage pipes (9) are communicated with external drainage equipment by adopting drainage hoses.
9. The concrete pipe gallery performance enhancing structure of claim 1, wherein: the upper bearing plate (11) adopts a steel plate or a precast concrete plate.
CN202321862416.5U 2023-07-14 2023-07-14 Concrete pipe gallery performance improvement structure Active CN220284877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321862416.5U CN220284877U (en) 2023-07-14 2023-07-14 Concrete pipe gallery performance improvement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321862416.5U CN220284877U (en) 2023-07-14 2023-07-14 Concrete pipe gallery performance improvement structure

Publications (1)

Publication Number Publication Date
CN220284877U true CN220284877U (en) 2024-01-02

Family

ID=89338656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321862416.5U Active CN220284877U (en) 2023-07-14 2023-07-14 Concrete pipe gallery performance improvement structure

Country Status (1)

Country Link
CN (1) CN220284877U (en)

Similar Documents

Publication Publication Date Title
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN109653049B (en) Construction method for processing bridge head filling road section on soft foundation
CN112647537A (en) Pipe gallery construction process
US11952728B2 (en) Road structure reconstructed from large-scale independent underground garage and construction method thereof
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN110067168B (en) Asphalt pavement combined structure and construction method
CN109972638B (en) Construction method of prefabricated thin-wall formwork lattice beam ecological slope protection
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN113529786B (en) Garbage filling and mountain-piling supporting and retaining structure and construction method
CN209873479U (en) Bridgehead filling embankment structure on soft foundation
CN212837843U (en) IV-class and V-class surrounding rock tunnel concrete lining anti-cracking structure
CN220284877U (en) Concrete pipe gallery performance improvement structure
CN110438859A (en) Precast concrete road capable of collecting and draining water and construction method thereof
CN211735489U (en) Plate rib type cast-in-situ anchor rod high retaining wall
CN112900181B (en) Construction method for widening thin layer of asphalt pavement
CN111501959B (en) Combined cast-in-situ drainage ditch and construction method
CN111350164B (en) Anti-freezing damage near-water retaining wall and construction method
CN211547805U (en) Reinforced retaining wall capable of improving seepage-proofing and drainage performance
CN111379251A (en) Controllable rigid pile and compacted gravel pile combined composite foundation and construction method thereof
TW200307779A (en) A stiffening earth structure
CN111319118A (en) Prefabrication construction method of box girder in plateau valley bridge construction
CN112411288A (en) Geotextile-containing light soil widened embankment anti-floating structure and construction method thereof
CN111608248A (en) Cast-in-situ rainwater cover plate channel construction method
CN221297634U (en) Structure of arched culvert for road
CN109667278A (en) Tower crane anti-cracking and seepage control construction method is set under underground garage isolated footing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant