CN220010809U - Pipeline installation hauling device - Google Patents

Pipeline installation hauling device Download PDF

Info

Publication number
CN220010809U
CN220010809U CN202320317020.6U CN202320317020U CN220010809U CN 220010809 U CN220010809 U CN 220010809U CN 202320317020 U CN202320317020 U CN 202320317020U CN 220010809 U CN220010809 U CN 220010809U
Authority
CN
China
Prior art keywords
pipeline
hauling
frame
haulage
traction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320317020.6U
Other languages
Chinese (zh)
Inventor
李春雷
房银宪
邓同喜
刘铁城
齐永平
陈强
张虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Nuclear Engineering Co Ltd
Original Assignee
PowerChina Nuclear Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Nuclear Engineering Co Ltd filed Critical PowerChina Nuclear Engineering Co Ltd
Priority to CN202320317020.6U priority Critical patent/CN220010809U/en
Application granted granted Critical
Publication of CN220010809U publication Critical patent/CN220010809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a pipeline installation hauling device, which comprises a pipeline hauling frame for driving a pipeline to move, wherein a pipeline hoisting device for bearing the pipeline is arranged in the pipeline hauling frame, two pipeline hauling rails are arranged below the pipeline hauling frame in parallel, hauling frame rollers matched with the pipeline hauling rails are arranged at the bottom end of the pipeline hauling frame, a hauling frame traction device is connected to the advancing side of the pipeline hauling frame, and the hauling frame traction device is arranged between the two pipeline hauling rails; the pipeline is placed on the pipeline haulage frame through the pipeline hoisting device, the haulage frame pulling device is started to pull the pipeline haulage frame to move along the pipeline haulage track, the pipeline is driven to move synchronously until the pipeline is installed, the pipeline haulage frame is particularly suitable for being used in narrow spaces such as a pipe trench and a culvert, the situation of the ground surface such as traffic is not affected basically during use, the operation is convenient and labor-saving, safety and reliability are realized, the efficiency is high, and the pipeline installation speed is improved.

Description

Pipeline installation hauling device
Technical Field
The utility model relates to the technical field of auxiliary equipment for pipeline installation, in particular to a pipeline installation hauling device.
Background
Along with the continuous acceleration of the urban construction process, the construction pressure of the transformation, upgrading and the construction of municipal administration, power station pipe networks, pipelines and the like which are in normal operation of the city is continuously increased, particularly, the construction method of pipe ditches, culverts and the like in underground facilities is mainly adopted at present due to the limited operation space:
bridge deck dismantling method: the bridge pavement at the top of the culvert is removed by using a large machine, the pipeline is hoisted by using a large crane, and constructors finish operations such as butt adjustment, welding, detection, corrosion prevention and the like of the pipeline in the pipe trench. The construction method has the defects that the bridge needs to be restored to the original appearance after the construction is completed, the transportation at the bridge is inconvenient in the construction and bridge restoration process, the construction risk is increased, the construction workload is increased, large machines needing to be put into use are more, and the economical efficiency is poor.
The push pipe penetrating and installing method comprises the following steps: at least one hydraulic jack is fixedly arranged at the ends of the pipe ditch and the culvert, a steel plate is paved on the pipeline travelling route to serve as a slideway, and the pipeline is moved to the installation position by means of the thrust of the hydraulic jack. The construction method has the defects that the pushing distance of the hydraulic jack is limited, the hydraulic jack can sequentially move only a pipeline with a short distance, the long-distance moving operation is complex, the efficiency is low, and the pipeline installation speed is difficult to increase.
Disclosure of Invention
The utility model aims to solve the technical problem of providing the pipeline installation hauling device which is suitable for operation in narrow spaces such as a pipe ditch, a culvert and the like, basically does not influence the ground surface condition, and is convenient and labor-saving to operate.
In order to solve the technical problems, the technical scheme of the utility model is as follows: the pipeline installation hauling device comprises a pipeline hauling frame used for driving a pipeline to move, a pipeline hoisting device used for bearing the pipeline is installed in the pipeline hauling frame, two pipeline hauling rails are arranged below the pipeline hauling frame in parallel, hauling frame rollers matched with the pipeline hauling rails are arranged at the bottom end of the pipeline hauling frame, a hauling frame traction device is connected to the advancing side of the pipeline hauling frame, and the hauling frame traction device is arranged between the two pipeline hauling rails.
As the preferable technical scheme, the pipeline haulage frame comprises a cuboid haulage frame, wherein reinforcing supporting rods which are obliquely arranged are respectively arranged on two sides of the haulage frame, and reinforcing angle rods are respectively fixedly connected with two corners of the haulage frame, which are positioned above all ports of the pipeline.
As the preferable technical scheme, the pipeline lifting device comprises lifting rings fixedly mounted on the reinforcing angle rods, the lifting rings are respectively and correspondingly connected with hand-operated hoists, and lifting ropes are connected between the two hand-operated hoists at the same end of the pipeline.
As an optimized technical scheme, the pipeline hauling track is provided with two sections of hauling track sections which are detachably connected, and a track connecting device is arranged between the two sections of hauling track.
As an optimized technical scheme, the track connecting device comprises connecting rod sleeves fixedly installed on the outer sides of the end parts of the hauling track sections respectively, connecting rod bodies are detachably arranged on the connecting rod sleeves penetrating through the butt joint ends of the two hauling track sections, and connecting pin shafts are detachably inserted into the two ends of the connecting rod bodies.
As an optimal technical scheme, the haulage frame traction device comprises a winch arranged between two pipeline haulage rails, and a traction rope is connected between the winch and the pipeline haulage frame.
As an improvement to the technical scheme, a traction drag bar is arranged across the two pipeline haulage tracks, the traction drag bar is arranged on the advancing side of the pipeline haulage frame and is connected with the pipeline haulage frame, and the end part of the traction rope is fixed on the traction drag bar.
Due to the adoption of the technical scheme, the pipeline installation hauling device comprises a pipeline hauling frame for driving a pipeline to move, a pipeline hoisting device for bearing the pipeline is arranged in the pipeline hauling frame, two pipeline hauling tracks are arranged in parallel below the pipeline hauling frame, hauling frame rollers matched with the pipeline hauling tracks are arranged at the bottom end of the pipeline hauling frame, a hauling frame traction device is connected to the advancing side of the pipeline hauling frame, and the hauling frame traction device is arranged between the two pipeline hauling tracks; the utility model has the following beneficial effects: the pipeline is placed on the pipeline haulage frame through the pipeline hoisting device, the haulage frame pulling device is started to pull the pipeline haulage frame to move along the pipeline haulage track, the pipeline is driven to move synchronously until the pipeline is installed, the pipeline haulage frame is particularly suitable for being used in narrow spaces such as a pipe trench and a culvert, the situation of the ground surface such as traffic is not affected basically during use, the operation is convenient and labor-saving, safety and reliability are realized, the efficiency is high, and the pipeline installation speed is improved.
Drawings
The following drawings are only for purposes of illustration and explanation of the present utility model and are not intended to limit the scope of the utility model. Wherein:
FIG. 1 is a schematic diagram of an embodiment of the present utility model;
FIG. 2 is a side view of an embodiment of the present utility model;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 1;
FIG. 4 is an enlarged schematic view of the structure at B in FIG. 3;
in the figure: 1-hauling a frame; 2-reinforcing stay bars; 3-reinforcing angle bars; 4-lifting rings; 5-hand-operated hoist; 6-lifting a lifting rope; 7-hauling frame rollers; 8-hauling track segments; 9-connecting rod sleeve; 10-connecting rod bodies; 11-connecting pin shafts; 12-a winch; 13-pulling ropes; 14-pulling the towing bar.
Detailed Description
The utility model is further illustrated in the following, in conjunction with the accompanying drawings and examples. In the following detailed description, certain exemplary embodiments of the present utility model are described by way of illustration only. It is needless to say that the person skilled in the art realizes that the described embodiments may be modified in various different ways without departing from the spirit and scope of the utility model. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive in scope.
As shown in fig. 1, 2, 3 and 4, the pipeline installation hauling device is specially used for pipeline installation or butt joint use in narrow spaces such as a pipe trench, a culvert, a bridge bottom and the like, and the bridge deck at the top end of the culvert or the bridge surface is not required to be dismantled when in use, so that the normal use of the ground surface such as road traffic and the like is basically not influenced. The pipeline installation hauling device comprises a pipeline hauling frame for driving the pipeline to move, and a pipeline hoisting device for bearing the pipeline is arranged in the pipeline hauling frame. Specifically, the pipeline haulage frame includes cuboid form haulage frame 1, the reinforcing brace rod 2 that the slope set up is installed respectively to haulage frame 1's both sides, the both corners that lie in each port top of pipeline on the haulage frame 1 respectively fixedly connected with reinforcing brace rod 3, reinforcing brace rod 2 with reinforcing brace rod 3 cooperation has improved the intensity of haulage frame 1 to guarantee to form stable support to the pipeline. The pipeline lifting device comprises lifting rings 4 fixedly mounted on the reinforcing angle rods 3, the lifting rings 4 are respectively and correspondingly connected with a hand hoist 5, and lifting ropes 6 are connected between the two hand hoists 5 at the same end of the pipeline. When the pipeline is in use, the lifting rope 6 is firstly arranged at the bottom of the pipeline, then each hand hoist 5 is operated, the pipeline is lifted by the lifting rope 6 to be suspended in the hauling frame 1, and the pipeline is not in direct contact with the hauling frame 1, so that friction between the pipeline and the pipeline due to vibration generated by the movement of the hauling frame 1 in the pipeline installation hauling process is avoided, and the pipeline is protected. After the pipeline reaches the installation position, the height of the pipeline can be changed by operating the hand hoist 5 and the lifting rope 6 so as to facilitate the smooth installation or butt joint of the pipeline.
Two pipeline hauling tracks are arranged in parallel below the pipeline hauling frame, hauling frame rollers 7 matched with the pipeline hauling tracks are arranged at the bottom end of the pipeline hauling frame, and the hauling frame rollers 7 are arranged at the bottom end of the hauling frame 1 so as to form rolling fit with the pipeline hauling tracks, thereby being beneficial to reducing friction force between the two hauling tracks and saving more labor for hauling the pipeline. The hauling carriage roller 7 can be provided as a roller with a self-locking device so as to stop positioning at any time.
The pipeline hauling track of this embodiment is provided with two sections of hauling track sections 8 which are detachably connected, a track connecting device is arranged between the two hauling track sections 8, and in the process of hauling the pipeline, according to the position of the pipeline hauling frame, the hauling track section 8 at the rear side of the pipeline hauling frame can be detached to be in butt joint with the hauling track section 8 at the front end of the pipeline hauling frame, so that the pipeline hauling frame can smoothly and uninterruptedly move. Specifically, the track connecting device comprises connecting rod sleeves 9 fixedly installed on the outer sides of the end parts of the hauling track sections 8 respectively, connecting rod bodies 10 are detachably arranged on the connecting rod sleeves 9 penetrating through the butt joint ends of the two hauling track sections 8, and connecting pin shafts 11 are detachably inserted into two ends of the connecting rod bodies 10. When the rear side hauling track section 8 needs to be adjusted, the connecting pin shaft 11 and the connecting rod body 10 connected with the hauling track section 8 are detached, after the connecting pin shaft is moved to the front end, the connecting rod body 10 is inserted onto the corresponding connecting rod sleeve 9, and the connecting rod body 10 is limited by the connecting pin shaft 11 so as to prevent the connecting rod body 10 from falling off by itself, ensure the butt joint firmness of two adjacent hauling track sections 8, and facilitate the smooth transition of the pipeline hauling frame between different hauling track sections 8.
The pipeline haulage frame is characterized in that the travel side of the pipeline haulage frame is connected with a haulage frame traction device, the haulage frame traction device is arranged between two pipeline haulage rails, and the haulage frame traction device provides power for the travel of the pipeline haulage frame. The hauling frame traction device comprises a winch 12 arranged between two pipeline hauling rails, a traction rope 13 is connected between the winch 12 and the pipeline hauling frame, and the winch 12 is arranged in the middle of the two pipeline hauling rails, so that the uniformity of stress of the pipeline hauling frame is guaranteed, and the traction rope 13 is also arranged in the middle position of the pipeline hauling frame as far as possible. And on the pipeline hauling frame which needs to be moved, starting the winch 12 to wind the traction rope 13, and driving the pipeline to synchronously move forward by the pipeline hauling frame under the pulling of the traction rope 13.
A pulling bar 14 may be provided across two of the pipeline haulage tracks, the pulling bar 14 being provided on a traveling side of the pipeline haulage frame and connected to the pipeline haulage frame, and an end portion of the pulling rope 13 being fixed to the pulling bar 14 and connected to a middle portion of the pulling bar 14. The traction bar 14 can be tied on the pipeline haulage frame through a rope body, a belt body and the like, and can also be fixedly installed on the pipeline haulage frame through bolts and the like, so that the pipeline haulage frame is uniformly stressed and runs smoothly.
The description of the present utility model has been presented for purposes of illustration and description, and is not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (7)

1. Pipeline installation haulage device, its characterized in that: the pipeline hauling device comprises a pipeline hauling frame used for driving a pipeline to move, a pipeline lifting device used for bearing the pipeline is arranged in the pipeline hauling frame, two pipeline hauling rails are arranged below the pipeline hauling frame in parallel, hauling frame rollers matched with the pipeline hauling rails are arranged at the bottom end of the pipeline hauling frame, hauling frame traction devices are connected to the advancing side of the pipeline hauling frame, and the hauling frame traction devices are arranged between the two pipeline hauling rails.
2. The pipe installation haulage device of claim 1, wherein: the pipeline haulage frame comprises a cuboid haulage frame, reinforcing supporting rods which are obliquely arranged are respectively arranged on two sides of the haulage frame, and reinforcing angle rods are respectively fixedly connected with two corners of the haulage frame, which are positioned above all ports of the pipeline.
3. The pipe installation haulage device of claim 2, wherein: the pipeline lifting device comprises lifting rings fixedly mounted on the reinforcing angle rods, the lifting rings are respectively and correspondingly connected with hand-operated hoists, and lifting ropes are connected between the two hand-operated hoists at the same end of the pipeline.
4. The pipe installation haulage device of claim 1, wherein: the pipeline hauling track is provided with two sections of hauling track sections which are detachably connected, and a track connecting device is arranged between the two sections of hauling track.
5. The pipe installation haulage device of claim 4, wherein: the track connecting device comprises connecting rod sleeves fixedly installed on the outer sides of the end parts of the hauling track sections respectively, connecting rod bodies are detachably arranged on the connecting rod sleeves penetrating through the butt joint ends of the two hauling track sections, and connecting pin shafts are detachably inserted into the two ends of the connecting rod bodies.
6. The pipe installation haulage device of claim 1, wherein: the hauling frame traction device comprises a winch arranged between two pipeline hauling rails, and a traction rope is connected between the winch and the pipeline hauling frame.
7. The pipe installation haulage device of claim 6, wherein: and a traction drag bar is arranged across the two pipeline haulage tracks, the traction drag bar is arranged on the advancing side of the pipeline haulage frame and is connected with the pipeline haulage frame, and the end part of the traction drag bar is fixed on the traction drag bar.
CN202320317020.6U 2023-02-22 2023-02-22 Pipeline installation hauling device Active CN220010809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320317020.6U CN220010809U (en) 2023-02-22 2023-02-22 Pipeline installation hauling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320317020.6U CN220010809U (en) 2023-02-22 2023-02-22 Pipeline installation hauling device

Publications (1)

Publication Number Publication Date
CN220010809U true CN220010809U (en) 2023-11-14

Family

ID=88683808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320317020.6U Active CN220010809U (en) 2023-02-22 2023-02-22 Pipeline installation hauling device

Country Status (1)

Country Link
CN (1) CN220010809U (en)

Similar Documents

Publication Publication Date Title
CN107675636A (en) A kind of universal bridge structure thing method for dismounting and system
CN106638185B (en) A kind of traveling process becomes automatically across track-laying machine and application method
CN108978484A (en) A kind of curved bridge steel box-girder sliding method assembling and construction method
CN103726421B (en) Height and span adjustable track paver for metro construction
CN109372529B (en) In-tunnel dismantling device and method for hard rock heading machine
CN109236331B (en) Steel arch trolley suitable for tunnel micro-step excavation method
CN108590745B (en) Transportation method and transportation structure for shield tunnel construction
CN220010809U (en) Pipeline installation hauling device
JP4778476B2 (en) Propeller pipe moving device
CN212296495U (en) Ultra-long cable and liquid pipe trailing monorail crane for fully mechanized mining face
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN211055266U (en) Crawler paver
CN108004930A (en) The construction method of vertical shift bowstring arch bridge
CN108221512A (en) Adjustable track laying machine
CN214780349U (en) Installation system and installation crane for underground engineering segments
CN113818478A (en) Overweight prefabricated pipe gallery installation system and construction method thereof
CN211342941U (en) Movable inverted arch trestle
CN210418998U (en) Conveying device for large-diameter pipeline of circulating water system
CN110306420B (en) Pipe transportation device in pipe bridge and construction method thereof
CN211115750U (en) Multifunctional telescopic ladder frame vehicle
CN202298652U (en) Wall-form whole-piece sliding type dismantling device
CN214145494U (en) Novel shield constructs quick-witted station-crossing device
CN203845716U (en) Track moving device of walking rail type plate inserting machine
CN213265458U (en) Wear tunnel construction under municipal administration and use perpendicular geotome of foundation ditch earthwork equipment of fetching earth
CN210972756U (en) Rail transport device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant