CN219993210U - Safety device is used in installation of building curtain engineering - Google Patents

Safety device is used in installation of building curtain engineering Download PDF

Info

Publication number
CN219993210U
CN219993210U CN202321298826.1U CN202321298826U CN219993210U CN 219993210 U CN219993210 U CN 219993210U CN 202321298826 U CN202321298826 U CN 202321298826U CN 219993210 U CN219993210 U CN 219993210U
Authority
CN
China
Prior art keywords
casing
fixedly connected
installation
bracing piece
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321298826.1U
Other languages
Chinese (zh)
Inventor
宋小明
梁振龙
苏国民
汪旭
韩俊秀
黄彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Songbo Construction Engineering Co ltd
Original Assignee
Shanghai Songbo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Songbo Construction Engineering Co ltd filed Critical Shanghai Songbo Construction Engineering Co ltd
Priority to CN202321298826.1U priority Critical patent/CN219993210U/en
Application granted granted Critical
Publication of CN219993210U publication Critical patent/CN219993210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to the technical field of safety protection devices, and discloses a safety protection device for installation of a building curtain wall project, which is characterized in that a shell is moved upwards or downwards, a sliding block drives a supporting rod to slide through a sliding groove in the shell, a rack is arranged to move to a proper height, fixing is completed by screwing a limit bolt, the height of a protective guard is adjustable, the safety protection device can adapt to the minimum height standard of most high-altitude operation platforms, a fixing block is arranged to enable clamping groove blocks on the shell and the supporting rod to keep the same vertical horizontal line for convenient disassembly, a T-shaped clamping block is arranged to enable the fixing between a connecting rod and the clamping groove blocks to be firmer, a first limiting block and a second limiting block are arranged to fix a telescopic rod, the telescopic rod is arranged to change along with the lifting height of the supporting rod and the shell, compared with the traditional protective guard, the whole welding of the protective guard can be disassembled and replaced when a part assembly breaks down, and the disassembled part is moderate in volume and more convenient to carry.

Description

Safety device is used in installation of building curtain engineering
Technical Field
The utility model relates to the technical field of safety protection, in particular to a safety protection device for installation of a building curtain wall project.
Background
Building curtain refers to the building outer wall enclosure that does not bear the weight of, usually by panel and rear bearing structure constitute, building curtain's installation belongs to high altitude construction and generally needs to install the rail guard in operation platform department, current rail guard majority welding as an organic whole, it is very inconvenient when the change is dismantled to the partial subassembly of guardrail break down, it is great inconvenient to carry after the operation is accomplished to dismantle, and the minimum standard height of rail guard that needs to set up according to the height that locates at different floors is also very different, current rail guard mostly can not adjust the height, still need use the rail guard of different heights to install, not only comparatively troublesome and influence action progress and efficiency.
Disclosure of Invention
The utility model aims at providing a safety protection device for building curtain wall engineering installation, which aims at the existing device and has the advantages of being convenient to detach and capable of freely adjusting the height in a certain range.
The technical aim of the utility model is realized by the following technical scheme: the utility model provides a safety device is used in installation of building curtain engineering, includes two casings, the spout has been seted up to one side of shells inner wall, the inside sliding connection of spout has the slider, one side fixedly connected with bracing piece of slider, one side fixedly connected with rack of bracing piece, the inside threaded connection of casing has the spacing bolt of one end with rack engaged with, the bottom fixedly connected with fixed block of bracing piece one side, the equal fixedly connected with draw-in groove piece in opposite one side of casing and two fixed blocks, two be equipped with the connecting rod between the draw-in groove piece, the equal fixedly connected with in both ends of connecting rod and the inside T type fixture block that the cooperation of draw-in groove piece was used, two be provided with the telescopic link between the connecting rod, two the equal fixedly connected with of one side of connecting rod is symmetrical stopper one, the equal fixedly connected with stopper two in both ends of telescopic link, the recess that cooperation stopper two used has been seted up to the inside of stopper one.
The technical scheme is adopted: through setting up casing, spout, slider and bracing piece, upwards or downwardly moving the casing, the slider drives the bracing piece and slides through the inside spout of casing, accomplish the lift between bracing piece and the casing, through setting up the rack, when moving to suitable height, accomplish the fixed to the casing through twisting limit bolt, highly adjustable through the rail guard, not only adaptable most aerial work platform's minimum height standard, and need not carry the rail guard of different high types, convenient and improve the progress and the efficiency of operation, through setting up the fixed block, the draw-in groove piece that makes casing and bracing piece keep same vertical horizontal line convenient dismantlement, make the fixed between connecting rod and the draw-in groove piece more firm through setting up T type fixture block, through setting up stopper one and stopper two-purpose fixed telescopic link, through setting up the telescopic link, can dismantle the change when taking place partial subassembly trouble with the lifting height of bracing piece, and the part volume after the dismantlement is moderate, more conveniently carry in traditional rail guard's integrative welding.
The utility model is further arranged that the bottoms of the supporting rods are fixedly provided with the bases.
The technical scheme is adopted: the base enlarges the contact surface between the support rod and the ground, and better fixity is provided.
The utility model is further characterized in that a through hole for being installed and used by a matched person is formed in the base.
The technical scheme is adopted: the through hole is matched with the installation of the base and the ground.
Compared with the prior art, the utility model has the following beneficial effects:
1. through setting up casing, spout, slider and bracing piece, upwards or downwardly moving the casing, the slider drives the bracing piece and slides through the inside spout of casing, accomplishes the lift between bracing piece and the casing, through setting up the rack, when moving suitable height, accomplishes the fixing to the casing through twisting limit bolt, highly adjustable through the rail guard, not only adaptable most aerial working platform's minimum height standard, and need not carry the rail guard of different high types, convenient and the progress and the efficiency of improvement operation.
2. Through setting up the fixed block, make the draw-in groove piece on casing and the bracing piece keep same vertical horizontal line convenient dismantlement, make fixed more firm between connecting rod and the draw-in groove piece through setting up T type fixture block, through setting up first and stopper two is used for fixed telescopic link, through setting up the telescopic link, can change along with the lifting height of bracing piece and casing, compare in the integrative welding of traditional rail guard can dismantle the change when taking place partial subassembly trouble, and the part volume after the dismantlement is moderate, more conveniently carries.
Drawings
FIG. 1 is a schematic elevational cross-sectional view of the structure of the present utility model;
FIG. 2 is a schematic top cross-sectional view of the structure of the present utility model;
FIG. 3 is an enlarged view of the utility model at A in FIG. 1;
FIG. 4 is an enlarged view of the utility model at B in FIG. 2;
fig. 5 is an enlarged view of fig. 1 at C in accordance with the present utility model.
In the figure: 1. a housing; 2. a chute; 3. a slide block; 4. a support rod; 5. a rack; 6. a limit bolt; 7. a fixed block; 8. a clamping groove block; 9. a connecting rod; 10. a T-shaped clamping block; 11. a telescopic rod; 12. a base; 13. a first limiting block; 14. and a second limiting block.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1:
referring to fig. 1, fig. 2, fig. 3, fig. 4, a safety device for building curtain wall engineering installation, including two casings 1, spout 2 has been seted up to one side of casing 1 inner wall, the inside sliding connection of spout 2 has slider 3, one side fixedly connected with bracing piece 4 of slider 3, one side fixedly connected with rack 5 of bracing piece 4, the inside threaded connection of casing 1 has one end and rack 5 engaged with stop bolt 6, through setting up casing 1, spout 2, slider 3 and bracing piece 4, upwards or move casing 1 downwards, slider 3 drives bracing piece 4 and slides through the inside spout 2 of casing 1, accomplish the lift between bracing piece 4 and casing 1, through setting up rack 5, accomplish the fixed to casing 1 through twisting stop bolt 6 when moving to suitable height, height-adjustable through the rail guard, not only adaptable most high-level work platform's minimum height standard, and need not carry the rail guard of different high types, convenience and improvement operation progress and efficiency.
Further, the base 12 is fixedly installed at the bottom of the supporting rod 4, and the contact surface between the supporting rod 4 and the ground is enlarged by the base 12, so that better fixity is provided.
Further, a through hole for installing and using by a matched person is formed in the base 12, and the through hole is matched with the installation of the base 12 and the ground.
The use process is briefly described: through setting up casing 1, spout 2, slider 3 and bracing piece 4, upwards or downshift casing 1, slider 3 drives bracing piece 4 and slides through the inside spout 2 of casing 1, accomplish the lift between bracing piece 4 and casing 1, through setting up rack 5, when moving to suitable height, accomplish the fixed to casing 1 through twisting limit bolt 6, the height-adjustable through the rail guard, not only adaptable most aerial working platform's minimum height standard, and need not carry the rail guard of different high types, convenience and improvement operation's progress and efficiency, the contact surface of bracing piece 4 and ground is increaseed to base 12, provide better fixity, the installation of through-hole cooperation base 12 and ground.
Example 2:
referring to fig. 1, fig. 2, fig. 3, fig. 4, fig. 5, a safety device for building curtain wall engineering installation, including two casings 1, the bottom fixedly connected with fixed block 7 of bracing piece 4 one side, the equal fixedly connected with draw-in groove piece 8 of opposite one side of casing 1 and two fixed blocks 7, be equipped with connecting rod 9 between two draw-in groove pieces 8, the equal fixedly connected with in both ends of connecting rod 9 and the inside cooperation of draw-in groove piece 8T type fixture block 10 that uses, be provided with telescopic link 11 between two connecting rods 9, the equal fixedly connected with of one side of two connecting rods 9 is mutually symmetrical stopper one 13, the recess that cooperation stopper two 14 used is seted up to the inside of telescopic link 11, through setting up fixed block 7, make the fixed between connecting rod 9 and the draw-in groove piece 8 more firm through setting up T type fixture block 10, be used for fixing telescopic link 11 through setting up stopper one 13 and stopper two 14, through setting up telescopic link 11, can take place more convenient dismantlement in the change in the volume of carrying part after carrying the more than traditional part is changed along with the height of bracing piece 1, more convenient dismantlement of the part takes place.
The use process is briefly described: through setting up fixed block 7, make draw-in groove piece 8 on casing 1 and the bracing piece 4 keep same vertical horizontal line convenient dismantlement, make the fixed between connecting rod 9 and the draw-in groove piece 8 more firm through setting up T type fixture block 10, be used for fixed telescopic link 11 through setting up stopper one 13 and stopper two 14, through setting up telescopic link 11, can change along with the lifting height of bracing piece 4 and casing 1, can dismantle the change when taking place partial subassembly trouble in the integrative welding of traditional rail guard, and the part volume after the dismantlement is moderate, more conveniently carries.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. Safety device is used in installation of building curtain engineering, including two casing (1), its characterized in that: spout (2) have been seted up to one side of casing (1) inner wall, the inside sliding connection of spout (2) has slider (3), one side fixedly connected with bracing piece (4) of slider (3), one side fixedly connected with rack (5) of bracing piece (4), the inside threaded connection of casing (1) has one end and rack (5) engaged with stop bolt (6), the bottom fixedly connected with fixed block (7) of bracing piece (4) one side, equal fixedly connected with draw-in groove piece (8) in opposite one side of casing (1) and two fixed block (7), two be equipped with connecting rod (9) between draw-in groove piece (8), the equal fixedly connected with in both ends of connecting rod (9) with T type fixture block (10) that the inside cooperation of draw-in groove piece (8) used, two be provided with telescopic link (11) between connecting rod (9) one side of connecting rod (9) equal fixedly connected with stopper (13) of mutual symmetry, the equal fixedly connected with in both ends of telescopic link (11) stopper (14), two inside that the inside of stopper (14) was seted up and was used to limit block (14).
2. The safety device for installation of building curtain wall engineering according to claim 1, wherein: the bottoms of the supporting rods (4) are fixedly provided with bases (12).
3. The safety device for installation of building curtain wall engineering according to claim 2, wherein: the inside of base (12) has seted up the through-hole that the cooperation personnel used of installation.
CN202321298826.1U 2023-05-26 2023-05-26 Safety device is used in installation of building curtain engineering Active CN219993210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321298826.1U CN219993210U (en) 2023-05-26 2023-05-26 Safety device is used in installation of building curtain engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321298826.1U CN219993210U (en) 2023-05-26 2023-05-26 Safety device is used in installation of building curtain engineering

Publications (1)

Publication Number Publication Date
CN219993210U true CN219993210U (en) 2023-11-10

Family

ID=88620979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321298826.1U Active CN219993210U (en) 2023-05-26 2023-05-26 Safety device is used in installation of building curtain engineering

Country Status (1)

Country Link
CN (1) CN219993210U (en)

Similar Documents

Publication Publication Date Title
CN219993210U (en) Safety device is used in installation of building curtain engineering
CN213626572U (en) Tool type external cantilever operation platform
CN216340836U (en) Attached lifting protective platform with adjustable protective fence
CN210448025U (en) Portable badminton net rack
CN209855279U (en) Combined spiral supporting system for supporting collapsed building structure
CN216864946U (en) Rail for road protection
CN219654336U (en) Protection plate for constructional engineering
CN221222564U (en) L-shaped mounting bracket for indicator lamp
CN220954488U (en) Intelligent combination mounting bracket of building
CN214575476U (en) Operating platform convenient to install for outer wall construction
CN220150811U (en) Scaffold for building construction
CN220268982U (en) Display screen convenient for outdoor building
CN220336516U (en) Install convenient protector
CN216339055U (en) Moving platform for road, bridge and tunnel construction
CN220267187U (en) Building curtain installs safety device
CN210316427U (en) Cantilever type decoration construction operation platform
CN216616762U (en) Foot rest for building safety
CN219080920U (en) Scaffold frame that construction was used is taken
CN206720687U (en) Column type overhead operation platform
CN219411757U (en) Attached lifting scaffold
CN219772735U (en) Safety protection structure that bridge support set up
CN219569672U (en) Safety protection device for elevator shaft in building construction
CN220686963U (en) Safety protection equipment for construction
CN220059428U (en) A ladder of marking time of exempting from to dismantle for lower rotor overhauls usefulness
CN220555908U (en) Adjustable wall-attached support for building climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant