Sectional pouring constructional column combined template Download PDFInfo
- Publication number
- CN219909954U CN219909954U CN202321323605.5U CN202321323605U CN219909954U CN 219909954 U CN219909954 U CN 219909954U CN 202321323605 U CN202321323605 U CN 202321323605U CN 219909954 U CN219909954 U CN 219909954U
- Authority
- CN
- China
- Prior art keywords
- battens
- template
- constructional column
- rail
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009415 formwork Methods 0.000 claims abstract description 20
- 230000002787 reinforcement Effects 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 5
- 230000001953 sensory effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 15
- 239000000463 material Substances 0.000 description 4
- 239000002131 composite material Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000000465 moulding Methods 0.000 description 3
- 239000002023 wood Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a sectional pouring constructional column combined template which comprises a rail batten, a bolt, a sectional template, a counter-pulling screw rod and a template batten, wherein the bolt is arranged on the rail batten; two template battens are vertically arranged on the pouring surface of the constructional column, rail battens are vertically arranged on the inner sides of the two template battens respectively, the rail battens and the template battens Fang Tiege are provided with grooves on the inner sides of the rail battens, the opening direction of the grooves faces the pouring surface of the constructional column, the sectional templates are inserted into the rail battens from the grooves, and the upper parts of the grooves are fixed by inserting bolts into the grooves; the outer side face of the formwork batten and the back face of the constructional column are provided with a plurality of pairs of pull screw rods for reinforcement. The utility model improves the concrete pouring speed, strengthens the vibration and sensory quality of the concrete in the pouring process, and greatly improves the pouring quality of the constructional column while ensuring the concrete pouring speed.
Description
Technical Field
The utility model relates to the field of formwork construction, in particular to a sectional pouring constructional column combined formwork.
Background
According to the technical scheme, through retrieval, CN211396609U is a constructional column combined template, the secondary damage of the template to the masonry wall is solved, the selection and splicing of the mould are simplified, and the concrete pouring quality problem is not solved.
CN206053314U is a constructional column combined template, which solves the waste in the use process of the traditional template. But does not solve the concrete placement quality problem.
During secondary structure construction, the internal steel bars of the constructional column are dense, the space is narrow, the concrete conveying and pouring time is long, and the concrete is difficult to vibrate. The actual construction appears at a plurality of places: the phenomena of root rot, cavity, deformation and the like are avoided, and the molding quality of the constructional column casting concrete is difficult to ensure.
Disclosure of Invention
The utility model aims to overcome the defects of the prior art, provides a sectional pouring constructional column combined template, and solves the problems that a plurality of positions appear in construction: root rot, hollowness, deformation and the like, and the molding quality of the constructional column casting concrete is difficult to be ensured.
In order to solve the technical problems, the utility model is realized as follows:
the utility model provides a but sectional casting constructional column combination template which characterized in that: the device comprises a rail batten, a bolt, a segmented template, a counter-pulling screw rod and a template batten; two template battens are vertically arranged on the pouring surface of the constructional column, rail battens are vertically arranged on the inner sides of the two template battens respectively, the rail battens and the template battens Fang Tiege are provided with grooves on the inner sides of the rail battens, the opening direction of the grooves faces the pouring surface of the constructional column, the sectional templates are inserted into the rail battens from the grooves, and the upper parts of the grooves are fixed by inserting bolts into the grooves; the outer side face of the formwork batten and the back face of the constructional column are provided with a plurality of pairs of pull screw rods for reinforcement.
The sectional pouring constructional column combined template is characterized in that: the rail battens are arranged on the inner sides of the formwork battens in a segmented mode according to the heights of the constructional columns, and each section of rail batten is provided with a tongue-and-groove for inserting the segmented formwork.
The sectional pouring constructional column combined template is characterized in that: and a gable clamp and two steel pipes arranged in the gable clamp are arranged between the opposite-pull screw and the formwork batten and between the opposite-pull screw and the back of the constructional column and are used for reinforcing the formwork batten.
The beneficial effects of the utility model are as follows: meanwhile, the PVC sleeve is sleeved on the opposite-pull screw rod and is positioned in the constructional column, so that the work of punching holes in the filling wall can be omitted, the working efficiency is improved, and the filling wall is not damaged.
When the constructional column template is used for construction, compared with the traditional mode (long pouring time, higher feed inlet at one position of the top, construction safety operation platform is required to be erected, construction is difficult, labor and time are wasted), the combined template improves the concrete pouring speed, strengthens the vibration and sensory quality of concrete in the pouring process, and greatly improves the pouring quality of the constructional column while ensuring the concrete pouring speed. Simple structure, convenient operation, local material selection, the material that uses all is selected from the site operation material, need not to add in addition and purchase, and this constructional column combination template repeatedly usable shifts layer upon layer, labour saving and time saving.
Drawings
The utility model is described in further detail below with reference to the attached drawings and embodiments:
FIG. 1 is a schematic diagram of the structure of the present utility model.
FIG. 2 is a schematic diagram of a fixation pattern at the interface of the combined template.
FIG. 3 is a schematic diagram of the operation of the combined template.
Fig. 4 is a working front view of the composite form.
Fig. 5 is a top view of a composite form work.
Detailed Description
As shown in fig. 1-5: a sectional castable column composite formwork comprising: the formwork comprises a rail timber square 1 (side rabbet), a bolt 2, a segmented formwork 3, a steel pipe 4 for reinforcement, a split screw 5 for reinforcement and a common formwork timber square 6 for reinforcement;
rail batten (side tongue-and-groove): and cutting out a 20X 20mm tongue-and-groove on one side by adopting a common square block of a construction site. Circular arc gaps with the diameter of 150mm are reserved at the upper part and the lower part respectively so as to facilitate the insertion of templates.
A bolt: the sectional templates and the battens are matched for use, and the upper opening of the templates is fixed.
Segmentation template: and installing the templates in sections according to the actual construction conditions.
Steel pipe for reinforcement, split screw for reinforcement, and form batten for reinforcement: the method is characterized by adopting the conventional materials of the construction site.
The utility model adopts multistage pouring, gradually pouring from low to high and vibrating by the vibrating rod 8, thereby ensuring the concrete pouring quality of the constructional column and improving the overall strength and the appearance quality of the constructional column.
(1) The back side of the sectional pouring constructional column combined template adopts a conventional constructional column reinforced template; (2) The two sides of the front face of the sectional pouring constructional column combined template are reinforced by adopting a 'grooved and tongued' batten, and the opening direction of the grooved and tongued is towards the inner side of the constructional column; (3) The 'grooved and tongued' batten is installed in a sectional mode (for example, the height of a constructional column is 2900mm, and the batten is divided into three sections of 1300 mm); (4) When concrete is poured, a first section of template is inserted into the first section, after the template is installed, the template is fixed in place by adopting a fixing bolt, and the concrete is poured and vibrated;
the construction sequence is as follows: (1) configuring templates and battens according to the construction requirements of the drawing constructional column; (2) according to the construction scheme, the opposite-pulling screw rods are arranged at intervals of 500-1000mm for reinforcement, and a mountain-shaped clamp 7 and two steel pipes arranged in the mountain-shaped clamp are arranged between the opposite-pulling screw rods and the formwork battens and between the opposite-pulling screw rods and the back surfaces of the constructional columns for reinforcing the formwork battens; (3) the 'grooved and tongued' battens are installed in a sectional mode (for example, the constructional column height is 3900mm, and the battens are 1300mm in three sections) according to the layer height requirement, and the sectional template is also placed in length according to the requirement; (4) the first section of template is inserted from the wood Fang Qikou, fixed by a reserved wood wedge in advance, poured with concrete and fully vibrated; (5) installing a next section of template according to the same method as the step (4), pouring concrete, and gradually pouring to the designed elevation; see the drawings of the patent specification in detail;
the utility model aims at the problems of dense reinforcing steel bars, narrow space, long concrete conveying and pouring time and difficult vibration in the construction of a secondary structure. The actual construction appears at a plurality of places: the phenomena of root rot, cavity, deformation and the like are avoided, and the molding quality of the constructional column casting concrete is difficult to ensure. The sectional pouring constructional column combined template is designed, multi-section pouring is adopted, vibration is gradually poured from low to high, the pouring quality of constructional column concrete is guaranteed, and the overall strength and the appearance quality of the constructional column are improved.
Claims (3)
1. The utility model provides a but sectional casting constructional column combination template which characterized in that: the device comprises a rail batten, a bolt, a segmented template, a counter-pulling screw rod and a template batten; two template battens are vertically arranged on the pouring surface of the constructional column, rail battens are vertically arranged on the inner sides of the two template battens respectively, the rail battens and the template battens Fang Tiege are provided with grooves on the inner sides of the rail battens, the opening direction of the grooves faces the pouring surface of the constructional column, the sectional templates are inserted into the rail battens from the grooves, and the upper parts of the grooves are fixed by inserting bolts into the grooves; the outer side face of the formwork batten and the back face of the constructional column are provided with a plurality of pairs of pull screw rods for reinforcement.
2. The sectional pouring constructional column combination template according to claim 1, wherein: the rail battens are arranged on the inner sides of the formwork battens in a segmented mode according to the heights of the constructional columns, and each section of rail batten is provided with a tongue-and-groove for inserting the segmented formwork.
3. The sectional pouring constructional column combination template according to claim 1, wherein: and a gable clamp and two steel pipes arranged in the gable clamp are arranged between the opposite-pull screw and the formwork batten and between the opposite-pull screw and the back of the constructional column and are used for reinforcing the formwork batten.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321323605.5U CN219909954U (en) | 2023-05-29 | 2023-05-29 | Sectional pouring constructional column combined template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321323605.5U CN219909954U (en) | 2023-05-29 | 2023-05-29 | Sectional pouring constructional column combined template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219909954U true CN219909954U (en) | 2023-10-27 |
Family
ID=88466873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321323605.5U Active CN219909954U (en) | 2023-05-29 | 2023-05-29 | Sectional pouring constructional column combined template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219909954U (en) |
-
2023
- 2023-05-29 CN CN202321323605.5U patent/CN219909954U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108457421B (en) | Manufacturing die and manufacturing method of assembled reinforced concrete U-shaped frame beam | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN210820097U (en) | Mould for precast concrete superimposed sheet | |
CN105484421A (en) | Ring beam formwork bricks and building secondary structure filler wall ring beam construction method | |
CN105696790A (en) | Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam | |
CN105649327A (en) | Method for pouring concrete outside steel pipe columns by using semicircular templates | |
CN111561103B (en) | BM interlocking building block constructional column, tie beam structure and construction method thereof | |
CN112523393B (en) | Construction method for circular concrete column and masonry filler wall constructional column connection section | |
CN219909954U (en) | Sectional pouring constructional column combined template | |
CN105697019A (en) | Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint | |
CN212154120U (en) | Aluminum alloy template set for prefabricated building | |
CN211200645U (en) | Easy-to-detach template for cast-in-place reinforced concrete gutter inlet | |
CN202247938U (en) | Wedge-shaped foundation bolt preformed hole core formwork device | |
CN111058628A (en) | Construction method of post-cast strip formwork support system | |
CN111075101A (en) | BM interlocking building block U-shaped block lintel, ring beam and horizontal tie beam and construction method thereof | |
CN106337530A (en) | Construction method for plugging construction joint of frame beam | |
CN210685368U (en) | Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint | |
CN209990139U (en) | Structure is assembled to constructional column template | |
CN109972537B (en) | Construction method of composite reinforced structure of double-arch bridge | |
CN112252708A (en) | Construction column top chiseling-free device and construction method | |
CN108442698B (en) | Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve | |
CN113323262A (en) | 3D printed prefabricated wall module, wall and construction method of wall | |
CN213509600U (en) | Constructional column reinforced structure | |
CN206016054U (en) | A kind of collar tie beam of aerated blocks or strip and preformed bricks | |