CN219796383U - Supporting and hanging bracket connecting piece for electromechanical installation of building construction - Google Patents

Supporting and hanging bracket connecting piece for electromechanical installation of building construction Download PDF

Info

Publication number
CN219796383U
CN219796383U CN202321156604.6U CN202321156604U CN219796383U CN 219796383 U CN219796383 U CN 219796383U CN 202321156604 U CN202321156604 U CN 202321156604U CN 219796383 U CN219796383 U CN 219796383U
Authority
CN
China
Prior art keywords
hanger
fixing
hangers
connecting piece
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321156604.6U
Other languages
Chinese (zh)
Inventor
马彬
朱亚莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jutai Electric Group Co ltd
Original Assignee
Shanghai Jutai Electric Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jutai Electric Group Co ltd filed Critical Shanghai Jutai Electric Group Co ltd
Priority to CN202321156604.6U priority Critical patent/CN219796383U/en
Application granted granted Critical
Publication of CN219796383U publication Critical patent/CN219796383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an electromechanical installation support and hanger connecting piece for building construction, which relates to the technical field of support and hanger, and comprises a top support, wherein an installation piece is arranged on the top support, the installation piece comprises a connecting part and a plurality of fixing parts, the connecting part comprises two first sliding blocks, a threaded rod and hangers, the fixing part comprises a second sliding block, an L-shaped clamping plate is arranged on the second sliding block, a fixing piece is arranged on the L-shaped clamping plate, a fastener is arranged on the fixing piece, a first sliding groove is arranged on the top support, the first sliding block is in sliding connection with the first sliding groove, plugs are arranged at two ends of the first sliding groove, the two hangers are positioned between the two threaded rods, the hangers are fixed with the threaded rod through two nuts, and the second sliding groove is arranged on the two hangers. In the utility model, the hanger and the threaded rod are convenient to install and fix, the mounting holes can be prevented from being blocked by the fixed bridge or the pipeline, the fixing is inconvenient to fix, and the fixing part and the hanger can be fixed, so that the pipeline or the bridge is clamped.

Description

Supporting and hanging bracket connecting piece for electromechanical installation of building construction
Technical Field
The utility model relates to the technical field of support and hanging frames, in particular to an electromechanical installation support and hanging frame connecting piece for building construction.
Background
The support and the hanging frame are combined, and are mainly used for building water supply and drainage, fire protection, heating, ventilation, air conditioning, fuel gas, heating power, electric power, communication and other electromechanical engineering facilities, and play roles in bearing the weight of various accessories and media thereof, restraining and limiting unreasonable displacement of building components, controlling vibration of the components and the like in various construction links, so that the support and the hanging frame have extremely important effects on safe operation of the building facilities.
The existing support and hanger usually support and limit pipelines or bridges and the like through two threaded rods and a U-shaped plate, when the support and hanger is installed, holes are required to be punched in the wall surface in advance, the accuracy of measurement is required to be certain, otherwise, once the U-shaped plate is installed, the U-shaped plate cannot be moved, the positions of the pipelines or the bridges cannot be moved, when the pipelines or the bridges are fixed with the U-shaped plate, the situation that mounting holes on the U-shaped plate are just blocked by the pipelines or the bridges can occur, so that the fixing of the pipelines or the bridges is affected, and the support and hanger connecting piece for the electro-mechanical installation of the building construction is provided for solving the problems.
Disclosure of Invention
The utility model aims to solve the defects of the prior art in the background technology, and provides an electromechanical installation support and hanger connecting piece for building construction.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a building construction machine electric installation gallows connecting piece, includes the top support, be equipped with the installed part on the top support, the installed part includes connecting piece and a plurality of fixed part, connecting piece includes two No. one sliders, threaded rod and gallows, fixed part includes No. two sliders, be equipped with L type splint on No. two sliders, be equipped with the mounting on the L type splint, be equipped with the fastener on the mounting.
Preferably, a first sliding groove is formed in the top support, the first sliding block is in sliding connection with the first sliding groove, the first sliding block is in threaded connection with the threaded rod, and plugs are arranged at two ends of the first sliding groove.
Preferably, the two hanging brackets are located between the two threaded rods, the hanging brackets are fixed with the threaded rods through two nuts, the two hanging brackets are provided with two sliding grooves, and the two hanging brackets are arranged oppositely.
Preferably, the second slider is in sliding connection with the second chute, and the second slider, the L-shaped clamping plate and the fixing piece are in threaded connection through fixing bolts.
Preferably, the fixing member is composed of a U-shaped plate and two L-shaped plates, the inner width of the U-shaped plate is identical to the width of the hanging bracket, and the top of the L-shaped plate is in contact with the hanging bracket.
Preferably, the width of the L-shaped clamping plate does not exceed the width of the hanging bracket, and the L-shaped clamping plate is positioned between the second sliding block and the fixing piece.
Preferably, the fastener comprises a screw rod and a screw cap, wherein one end of the screw rod sequentially penetrates through the two L-shaped plates and is in threaded connection with the screw cap.
The utility model has at least the following beneficial effects:
1. the utility model provides a construction machine electric installation gallows connecting piece, through the setting of connecting piece and fixed part, the gallows of being convenient for and threaded rod's installation is fixed, can also prevent simultaneously that fixed bridge or pipeline from blocking the mounting hole, inconvenient fixed to measurement accuracy's requirement has still been reduced.
2. The utility model provides a construction machine electric installation gallows connecting piece, through setting up of mounting and fastener, can fix fixed part and gallows to fix pipeline or crane span structure, prevent that it from rocking.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings required for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a front cross-sectional view of the present utility model;
FIG. 3 is a side cross-sectional view of the present utility model;
FIG. 4 is an exploded view of the connecting member of the present utility model;
fig. 5 is an exploded view of the fixing member of the present utility model.
In the figure: 1. a top bracket; 2. a mounting member; 3. a connecting member; 301. a first chute; 302. a first sliding block; 303. a threaded rod; 304. a plug; 305. a hanging bracket; 3051. a second chute; 4. a fixing member; 401. a second slide block; 402. an L-shaped clamping plate; 403. a fixing member; 404. a fixing bolt; 405. a fastener.
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
Referring to fig. 1-5, an electromechanical installation support and hanger connecting piece for building construction, which comprises a top support 1, wherein the top support 1 is fixed on the top of a building through a screw and the like, a mounting piece 2 is arranged on the top support 1, the mounting piece 2 comprises a connecting piece 3 and a plurality of fixing pieces 4, the fixing pieces 4 can fix a bridge frame and also can fix pipelines, only an arc-shaped clamping plate is needed to be replaced by an L-shaped clamping plate 402, only one bridge frame is shown in the figure, a plurality of bridge frames and or a plurality of pipelines are arranged side by side, the connecting piece 3 comprises two first sliding blocks 302, a threaded rod 303 and a hanger 305, a plurality of mounting holes are formed in the top support 1 and the hanger 305, the mounting holes are not marked in the figure, the fixing pieces 4 comprise a second sliding block 401, an L-shaped clamping plate 402 is arranged on the second sliding block 401, a fixing piece 403 is arranged on the L-shaped clamping plate 402, and a fastener 405 is arranged on the fixing piece 403.
The top support 1 is provided with a first sliding groove 301, a first sliding block 302 is in sliding connection with the first sliding groove 301, the first sliding block 302 is in threaded connection with a threaded rod 303, plugs 304 are arranged at two ends of the first sliding groove 301, and the plugs 304 are T-shaped and can seal the first sliding groove 301.
The two hanging brackets 305 are located between the two threaded rods 303, the hanging brackets 305 and the threaded rods 303 are fixed through two nuts, the threaded rods 303 can move on the horizontal plane at will, so that the two hanging brackets are convenient to correspond to mounting holes on the two hanging brackets 305, inaccuracy in measurement can be achieved in time, the threaded rods 303 and the hanging brackets 305 can be fixed, the two hanging brackets 305 are provided with second sliding grooves 3051, and the two hanging brackets 305 are arranged oppositely.
The second slider 401 is slidably connected with the second chute 3051, and the second slider 401, the L-shaped clamping plate 402 and the fixing piece 403 are in threaded connection through a fixing bolt 404.
The fixing member 403 is composed of a U-shaped plate and two L-shaped plates, the inner width of the U-shaped plate is the same as the width of the hanger 305, and the top of the L-shaped plate is in contact with the hanger 305, and the fixing member 403 is arranged to facilitate fixing of the remaining hanger 305 of the fixing member 4.
The width of the L-shaped clamping plate 402 does not exceed the width of the hanging frame 305, the L-shaped clamping plate 402 is located between the second sliding block 401 and the fixing piece 403, and the L-shaped clamping plate 402 can clamp and fix the bridge.
The fastener 405 is composed of a screw rod and a nut, one end of the screw rod sequentially penetrates through the two L-shaped plates and is in threaded connection with the nut, and the fastener 405 is matched with the fixing piece 403 to be used for fixing.
Firstly, punching holes on the top of a building, then attaching the top support 1 to the top of the building, enabling the two ends of the top support 1 to exceed the bridge, then fixing the top support 1 on the wall through screws and the like, then inserting two first sliding blocks 302 through the two ends of the first sliding groove 301 respectively, and plugging the two ends of the first sliding groove 301 by plugs 304.
One hanger 305 is then placed on top of the bridge with the second runner 3051 down, then the second runner 401 is slid into the second runner 401, then the threaded rods 303 are respectively inserted into the laterally-most mounting holes, when the threaded rods 303 go beyond the hanger 305, nuts are installed on the threaded rods 303, then the threaded rods 303 are screwed with the first runner 302, the nuts are tightened against the hanger 305 by turning the nuts, then a nut is installed again on the threaded rods 303, thereby fixing the hanger 305 on the threaded rods 303, then another hanger 305 is inserted into the threaded rods 303, and is fixed in the same manner.
Then, the L-shaped clamping plate 402 is placed on the side surface of the bridge, the second sliding block 401 is moved to align the sliding block 401 with the L-shaped clamping plate 402, then the fixing piece 403 is broken off and sleeved on the hanging frame 305 and the L-shaped clamping plate 402, the second sliding block 401, the L-shaped clamping plate 402 and the fixing piece 403 are fixed through the fixing bolts, the fixing part 4 and the hanging frame 305 can be fixed through the fixing bolts 404 to prevent shaking, then the screw rod penetrates through the L-shaped plate to be fixed through the nuts, so that the fixing piece 403 can be clamped, the fixing part 4 is further fixed, and in the same way, other fixing pieces 403 can be fixed, and the bridge and the hanging frame 305 can be fixed through the fixing pieces 403.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made therein without departing from the spirit and scope of the utility model, which is defined by the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a building construction machine electric installation gallows connecting piece, includes top support (1), its characterized in that, be equipped with installed part (2) on top support (1), installed part (2) are including connecting component (3) and a plurality of fixed part (4), connecting component (3) are including two slider (302), threaded rod (303) and gallows (305), fixed part (4) are including slider (401) No. two, be equipped with L type splint (402) on slider (401) No. two, be equipped with mounting (403) on L type splint (402), be equipped with fastener (405) on mounting (403).
2. The mechanical and electrical installation support and hanger connecting piece for building construction according to claim 1, wherein a first sliding groove (301) is formed in the top support (1), the first sliding block (302) is slidably connected with the first sliding groove (301), the first sliding block (302) is in threaded connection with the threaded rod (303), and plugs (304) are arranged at two ends of the first sliding groove (301).
3. The mechanical and electrical installation support and hanger connecting piece for building construction according to claim 2, wherein two hangers (305) are located between two threaded rods (303), the hangers (305) and the threaded rods (303) are fixed through two nuts, two number two sliding grooves (3051) are formed in two hangers (305), and the two hangers (305) are arranged oppositely.
4. A construction machine electrical installation support hanger connecting piece according to claim 3, characterized in that the second slider (401) is slidably connected with the second chute (3051), and the second slider (401), the L-shaped clamping plate (402) and the fixing piece (403) are in threaded connection through a fixing bolt (404).
5. The connection for an electromechanical installation support and hanger for construction equipment according to claim 4, wherein the fixing member (403) is composed of a U-shaped plate and two L-shaped plates, the inner width of the U-shaped plate is the same as the width of the hanger (305), and the top of the L-shaped plate is in contact with the hanger (305).
6. The construction machine electrical installation hanger connection of claim 5, wherein the width of the L-shaped clamp plate (402) does not exceed the width of the hanger (305), the L-shaped clamp plate (402) being located between the second slider (401) and the fixture (403).
7. An electromechanical installation hanger connection for construction machinery according to claim 6, wherein the fastener (405) is comprised of a screw and a nut, one end of said screw passing through the two L-shaped plates in sequence and being threadedly connected to the nut.
CN202321156604.6U 2023-05-15 2023-05-15 Supporting and hanging bracket connecting piece for electromechanical installation of building construction Active CN219796383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321156604.6U CN219796383U (en) 2023-05-15 2023-05-15 Supporting and hanging bracket connecting piece for electromechanical installation of building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321156604.6U CN219796383U (en) 2023-05-15 2023-05-15 Supporting and hanging bracket connecting piece for electromechanical installation of building construction

Publications (1)

Publication Number Publication Date
CN219796383U true CN219796383U (en) 2023-10-03

Family

ID=88157878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321156604.6U Active CN219796383U (en) 2023-05-15 2023-05-15 Supporting and hanging bracket connecting piece for electromechanical installation of building construction

Country Status (1)

Country Link
CN (1) CN219796383U (en)

Similar Documents

Publication Publication Date Title
CN219796383U (en) Supporting and hanging bracket connecting piece for electromechanical installation of building construction
WO2014187198A1 (en) Mounting device
CN208227530U (en) For electrotechnical, electronic pcb board fixed pedestal
CN214479328U (en) Three-dimensional cable support of many spacing utility tunnel
CN215802482U (en) Assembled steel construction building element that light partition wall and girder steel are connected
CN212435302U (en) Dual thermal-insulated bus duct
CN210920364U (en) Pipeline spring support and hanger
CN210950223U (en) Adjustable anti-seismic support
CN210623799U (en) Combined type support and hanger
CN210361023U (en) Clamp for detecting anti-seismic support
CN219550711U (en) Base support of air conditioner outdoor unit
CN220135175U (en) Finished product support and hanger
CN217683595U (en) Movable clamping anti-seismic support
CN110274092B (en) Building machine electrical installation hanger plate
CN218440979U (en) Adjustable assembled integrated support
CN219453128U (en) Mounting fixture for electromechanical construction engineering
CN112531610B (en) Building construction equipment connects electric cable and prevents dragging protector
CN220523580U (en) Pipeline anti-seismic support and hanger
CN221042263U (en) Bus duct hanging device
CN212054806U (en) Antidetonation support fixing device
CN112161140B (en) Auxiliary device for mounting support and hanger system for building machinery and electricity
CN219760547U (en) Mounting structure of bridge frame and support hanger
CN216158488U (en) Pipeline installation gallows under I-steel roof beam
CN220488618U (en) High-efficient antidetonation gallows
CN219176060U (en) Safety fence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant