CN219732715U - Novel building construction frame - Google Patents

Novel building construction frame Download PDF

Info

Publication number
CN219732715U
CN219732715U CN202321008244.5U CN202321008244U CN219732715U CN 219732715 U CN219732715 U CN 219732715U CN 202321008244 U CN202321008244 U CN 202321008244U CN 219732715 U CN219732715 U CN 219732715U
Authority
CN
China
Prior art keywords
wall
frame
mounting
pull rope
winding drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321008244.5U
Other languages
Chinese (zh)
Inventor
韩中杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321008244.5U priority Critical patent/CN219732715U/en
Application granted granted Critical
Publication of CN219732715U publication Critical patent/CN219732715U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a novel building construction frame, which relates to the technical field of construction frames and comprises a mounting frame and a lifting frame, wherein the lifting frame is connected onto the mounting frame in a sliding manner, two air cylinders are mounted on the mounting frame, the end parts of telescopic shafts of the air cylinders are fixedly connected onto the outer wall of the lifting frame, two fixing plates are fixedly mounted on the side wall of the mounting frame, through holes are formed in the outer wall of the lifting frame, a support is fixedly mounted on the top wall of the lifting frame, pulleys are mounted on the outer wall of the support, and a conveying mechanism is arranged on the mounting frame.

Description

Novel building construction frame
Technical Field
The utility model relates to the technical field of construction frames, in particular to a novel building construction frame.
Background
In building construction, a construction frame is required to be erected in order to ensure smooth overhead operation.
When workers perform wall cement painting work on a scaffold, the common operations are: firstly, a cement bucket is bound on a pull rope by a worker on the ground, then the cement bucket is lifted to a scaffold by the worker on a construction frame through the pull rope, and the process of lifting the cement bucket by the worker is time-consuming and labor-consuming, so that the construction of the worker is inconvenient.
Disclosure of Invention
The utility model aims to solve the defect that in the prior art, the operation of lifting a cement bucket to a scaffold by workers is inconvenient, and provides a novel building construction frame.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a novel building construction frame, includes mounting bracket and crane, crane sliding connection in on the mounting bracket, install two cylinders on the mounting bracket, the telescopic shaft tip fixed connection of cylinder in on the outer wall of crane, fixed mounting has two fixed plates on the lateral wall of mounting bracket, the through-hole has been seted up on the outer wall of crane, fixed mounting has the support on the roof of crane, install the pulley on the outer wall of support, be provided with conveying mechanism on the mounting bracket;
the conveying mechanism comprises a winding drum, side walls at two ends of the winding drum are respectively arranged on two opposite side walls of the fixing plate, a connecting frame is fixedly arranged on one side wall of the winding drum, a driving motor is fixedly arranged on the side wall of the mounting frame, the end part of an output shaft of the driving motor is fixedly connected to the outer wall of the connecting frame, a pull rope is arranged on the winding drum, a hook is arranged at the end part of the pull rope, the pull rope movably penetrates through the side wall of the mounting frame and the top wall of the lifting frame, and the pull rope downwards extends from the outer wall of the pulley after bypassing and penetrates through the through hole.
The technical scheme further comprises the following steps: the limiting rings are movably mounted on the pull ropes, fastening bolts are connected to the outer walls of the limiting rings in a threaded mode, and the fastening bolts are used for fixing the pull ropes.
Fastening bolts are respectively arranged on the opposite outer walls of the two fixing plates, a plurality of sliding rods are respectively fixedly arranged on the side walls of the two ends of the winding cylinder, and the outer walls of the sliding rods are in sliding connection with the inner walls of the sliding grooves.
And the outer wall of the mounting frame is far away from the fixed plate of the driving motor, and a through hole is formed in the fixed plate.
The mounting frame with all install fixed establishment on the crane, fixed establishment includes mounting panel, arc, spacing screw rod movable mounting in on the mounting panel, threaded hole has been seted up on the outer wall of arc, spacing screw rod threaded connection in on the inner wall of threaded hole.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the cement bucket can be conveniently lifted to the scaffold on which workers work by mutually matching the driving motor, the winding drum, the pull rope and the support in the arranged conveying mechanism, the workers are not required to manually pull the pull rope to lift the cement bucket, the time and the physical strength of the workers are saved, and the efficiency of building construction is accelerated.
2. According to the utility model, the height of the construction frame can be adjusted through the lifting frame, so that the construction frame can be suitable for scaffolds with different heights, and the applicability of the device is improved.
Drawings
FIG. 1 is a schematic view of a first overall structure of a novel construction frame according to the present utility model;
FIG. 2 is a schematic view of a second overall construction of a novel construction work frame;
FIG. 3 is a schematic view of a partial cross-sectional structure of a novel building scaffold;
fig. 4 is an enlarged schematic view of the structure at a in fig. 3.
In the figure:
10. a mounting frame; 20. a lifting frame; 21. a cylinder; 22. a through hole; 30. a bracket; 31. a pulley; 32. a pull rope; 321. a limiting ring; 322. a fastening bolt; 33. a hook; 331. a slide bar; 332. a chute; 34. a driving motor; 35. a connecting frame; 36. a fixing plate; 37. winding up a winding drum; 38. a through hole; 41. a mounting plate; 42. an arc-shaped plate; 43. a limit screw; 44. and (3) a threaded hole.
Detailed Description
The technical scheme of the utility model is further described below with reference to the attached drawings and specific embodiments.
Example 1
Referring to fig. 1-4, the novel building construction frame provided by the utility model comprises a mounting frame 10 and a lifting frame 20, wherein the lifting frame 20 is slidably connected to the mounting frame 10, two air cylinders 21 are arranged on the mounting frame 10, and the ends of telescopic shaft ends of the air cylinders 21 are fixedly connected to the outer wall of the lifting frame 20; wherein, the outside of mounting bracket 10 still installs the air pump for drive cylinder 21, be used for adjusting the height of crane 20 through the cylinder 21 that sets up for the scaffold frame adaptable not co-altitude, through the length of adjusting cylinder 21 promptly, make the top of crane 20 be close to with the position that the workman stood on the scaffold frame, the workman of being convenient for gets the cement bucket.
Two fixing plates 36 are fixedly arranged on the side wall of the mounting frame 10, and through holes 22 are formed in the outer wall of the lifting frame 20; wherein the cement silo is facilitated to be moved over the top of the crane 20 by means of the through-going holes 22.
A bracket 30 is fixedly arranged on the top wall of the lifting frame 20, a pulley 31 is arranged on the outer wall of the bracket 30, and a conveying mechanism is arranged on the mounting frame 10; wherein, can be with cement bucket from ground to the eminence through conveying mechanism.
The conveying mechanism comprises a winding drum 37, side walls at two ends of the winding drum 37 are respectively arranged on opposite side walls of two fixing plates 36, a connecting frame 35 is fixedly arranged on one side wall of the winding drum 37, a driving motor 34 is fixedly arranged on the side wall of the mounting frame 10, the end part of an output shaft of the driving motor 34 is fixedly connected to the outer wall of the connecting frame 35, a pull rope 32 is arranged on the winding drum 37, a hook 33 is arranged at the end part of the pull rope 32, the pull rope 32 movably penetrates through the side wall of the mounting frame 10 and the top wall of the lifting frame 20, and the pull rope 32 downwards extends and penetrates through the through hole 22 after bypassing the outer wall of the pulley 31; when the cement bucket is conveyed to the top of the lifting frame 20, the cement bucket can be hung on the hook 33, then the driving motor 34 is started, the driving motor 34 drives the winding drum 37 to rotate, the winding drum 37 winds one end of the pull rope 32, so that the other end of the pull rope 32 is driven to move upwards, the hook 33 and the cement bucket on the hook 33 can be driven to move upwards, and the cement bucket is lifted to a high position.
A limiting ring 321 is movably arranged on the stay cord 32, a fastening bolt 322 is connected to the outer wall of the limiting ring 321 in a threaded manner, and the fastening bolt 322 is used for fixing the stay cord 32; when the height of the construction frame is adjusted, that is, the distance between the mounting frame 10 and the lifting frame 20 is adjusted, the length of the pull rope 32 is correspondingly required to be adjusted, when the length of the pull rope 32 is adjusted, the fastening bolt 322 can be rotated anticlockwise, the fastening of the fastening bolt 322 to the pull rope 32 is released, the position of the limiting ring 321 on the pull rope 32 can be adjusted, and the length of the pull rope 32 leaking outside the winding drum 37 is adjusted.
Fastening bolts 322 are respectively arranged on the opposite outer walls of the two fixing plates 36, a plurality of sliding rods 331 are respectively fixedly arranged on the side walls of the two ends of the winding drum 37, and the outer walls of the sliding rods 331 are connected to the inner walls of the sliding grooves 332 in a sliding manner; in order to improve the stability of the winding drum 37 during rotation, a fastening bolt 322 and a limiting ring 321 are disposed herein, and when the winding drum 37 rotates, the winding drum 37 drives the sliding rod 331 to slide on the inner wall of the fastening bolt 322.
The outer wall of the mounting frame 10 is provided with a through hole 38 on a fixed plate 36 far away from the driving motor 34; the length of the pull cord 32 is conveniently adjusted by the through hole 38, and when the length is adjusted, a hand can be inserted into the winding drum 37 from the through hole 38 to operate.
The mounting frame 10 and the lifting frame 20 are provided with fixing mechanisms, each fixing mechanism comprises a mounting plate 41, an arc-shaped plate 42 and a limiting screw 43, the limiting screw 43 is movably mounted on the mounting plate 41, the outer wall of the arc-shaped plate 42 is provided with a threaded hole 44, and the limiting screw 43 is in threaded connection with the inner wall of the threaded hole 44; the scaffold is fixed on the support rod of the scaffold through the fixing mechanism, so that a worker can conveniently take down a cement bucket on the scaffold, when the scaffold is fixed on the support rod of the scaffold, four threaded holes 44 can be correspondingly clamped on the support rod of the scaffold, then the limiting screw 43 is rotated, the limiting screw 43 is rotated to the inside of the threaded holes 44, and at the moment, the support rod of the scaffold is positioned between the arc-shaped side wall of the arc-shaped plate 42 and the limiting screw 43, so that the scaffold and the scaffold can be fixed.
In the embodiment, the working principle of the device is that when a worker performs cement painting construction on the outer wall of a building, the worker can fix the construction frame on the scaffold in advance, then hang the handle of the cement bucket on the hook 33, then start the driving motor 34, the driving motor 34 drives the winding drum 37 to rotate, the winding drum 37 winds the stay rope 32, so that the cement bucket is driven to ascend, and the cement bucket is transported to a high place;
the cement bucket is pulled up through the conveying mechanism that sets up to the cement bucket that need not the manual pulling stay cord of workman, saves workman's time and physical power for construction's efficiency.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (5)

1. The utility model provides a novel building construction frame, its characterized in that includes mounting bracket (10) and crane (20), crane (20) sliding connection in on mounting bracket (10), install two cylinders (21) on mounting bracket (10), telescopic shaft tip fixed connection of cylinder (21) in on the outer wall of crane (20), fixed mounting has two fixed plates (36) on the lateral wall of mounting bracket (10), through-hole (22) have been seted up on the outer wall of crane (20), fixed mounting has support (30) on the roof of crane (20), install pulley (31) on the outer wall of support (30), be provided with conveying mechanism on mounting bracket (10);
the conveying mechanism comprises a winding drum (37), two end side walls of the winding drum (37) are respectively arranged on two opposite side walls of the fixing plate (36), a connecting frame (35) is fixedly arranged on one end side wall of the winding drum (37), a driving motor (34) is fixedly arranged on the side wall of the mounting frame (10), an output shaft end part of the driving motor (34) is fixedly connected to the outer wall of the connecting frame (35), a pull rope (32) is arranged on the winding drum (37), a hook (33) is arranged at the end part of the pull rope (32), the pull rope (32) movably penetrates through the side wall of the mounting frame (10) and the top wall of the lifting frame (20), and the pull rope (32) downwards extends from the outer wall of the pulley (31) after bypassing and penetrates through the penetrating hole (22).
2. The novel building construction frame according to claim 1, wherein a limiting ring (321) is movably mounted on the pull rope (32), a fastening bolt (322) is connected to the outer wall of the limiting ring (321) in a threaded manner, and the fastening bolt (322) is used for fixing the pull rope (32).
3. The novel building construction frame according to claim 2, wherein fastening bolts (322) are respectively arranged on opposite outer walls of the two fixing plates (36), a plurality of sliding rods (331) are respectively fixedly arranged on two end side walls of the winding drum (37), and the outer walls of the sliding rods (331) are slidably connected to the inner walls of the sliding grooves (332).
4. A novel construction frame according to claim 3, characterized in that the outer wall of the mounting frame (10) is provided with a through hole (38) away from the fixing plate (36) of the driving motor (34).
5. The novel building construction frame according to claim 4, wherein the mounting frame (10) and the lifting frame (20) are provided with fixing mechanisms, each fixing mechanism comprises a mounting plate (41), an arc-shaped plate (42) and a limiting screw (43), each limiting screw (43) is movably mounted on each mounting plate (41), the outer wall of each arc-shaped plate (42) is provided with a threaded hole (44), and each limiting screw (43) is in threaded connection with the inner wall of each threaded hole (44).
CN202321008244.5U 2023-04-28 2023-04-28 Novel building construction frame Active CN219732715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321008244.5U CN219732715U (en) 2023-04-28 2023-04-28 Novel building construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321008244.5U CN219732715U (en) 2023-04-28 2023-04-28 Novel building construction frame

Publications (1)

Publication Number Publication Date
CN219732715U true CN219732715U (en) 2023-09-22

Family

ID=88030842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321008244.5U Active CN219732715U (en) 2023-04-28 2023-04-28 Novel building construction frame

Country Status (1)

Country Link
CN (1) CN219732715U (en)

Similar Documents

Publication Publication Date Title
CN200940077Y (en) Miniature crane
CN212127258U (en) Hoisting accessory for construction
CN220033777U (en) Hoisting equipment for prefabricated parts of building engineering
CN219732715U (en) Novel building construction frame
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN215905709U (en) External wall panel hoisting device for assembly type building construction
CN113585860B (en) Method for assembling and disassembling double-arm holding pole
CN216141163U (en) Indoor curtain wall glass installation construction equipment
CN113955636A (en) Hoisting equipment for assembly type building construction
CN210065000U (en) Roof hoisting tool
CN210457242U (en) Detachable hoist engine hoist device
CN210505310U (en) Detachable hoisting device
CN208135724U (en) A kind of tubular pole suspender
CN216740623U (en) Split clamping plate assembly
CN214828295U (en) Single-hook lower-rotating anti-swing electromagnetic hanging beam
CN110626960A (en) Mechanical equipment hoisting frame
CN220811715U (en) Liftable support for building engineering construction
CN219885608U (en) Hoisting platform in elevator well
CN220467394U (en) Material lifting device for building construction
CN114427288B (en) Installation construction method of split clamping plate assembly and anchor plate and split clamping plate assembly
CN218465333U (en) ALC partition plate installation hoisting device
CN217173051U (en) Convenient and easy-to-use building material hoisting machine
CN219411758U (en) Lifting type multifunctional scaffold
CN112813838B (en) Integral concrete vibrating device for viaduct pier body and construction method thereof
CN215626331U (en) Movable partition plate construction device