CN219711086U - Construction roofing maintenance mechanism that ftractures - Google Patents

Construction roofing maintenance mechanism that ftractures Download PDF

Info

Publication number
CN219711086U
CN219711086U CN202321218703.2U CN202321218703U CN219711086U CN 219711086 U CN219711086 U CN 219711086U CN 202321218703 U CN202321218703 U CN 202321218703U CN 219711086 U CN219711086 U CN 219711086U
Authority
CN
China
Prior art keywords
wall
fixedly connected
connecting plate
maintenance mechanism
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321218703.2U
Other languages
Chinese (zh)
Inventor
施小虎
吴栋梁
赵崇荐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Construction Group Joint Stock Co ltd
Original Assignee
Nantong Construction Group Joint Stock Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Construction Group Joint Stock Co ltd filed Critical Nantong Construction Group Joint Stock Co ltd
Priority to CN202321218703.2U priority Critical patent/CN219711086U/en
Application granted granted Critical
Publication of CN219711086U publication Critical patent/CN219711086U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to the field of roof cracking maintenance and discloses a building construction roof cracking maintenance mechanism, which comprises a platform, wherein one side of the outer wall of the platform is fixedly connected with a fixing frame, a fixing opening is formed in the fixing frame, the inner wall of the fixing opening is connected with a fixing bolt in a sliding manner, the outer wall of the fixing frame is rotatably connected with a second rotating shaft, the outer wall of the second rotating shaft is fixedly connected with a first connecting plate, and the outer wall of the fixing bolt is in threaded connection with the inside of the first connecting plate. According to the utility model, the first connecting plate is driven to move through the second rotating shaft to enable the conveyor belt to be attached to the roof, the plastic film is attached to the conveyor belt, the second rotating roller is driven to rotate through movement of the device, the plastic film is paved on the roof to achieve the moisturizing effect, the blade is driven to move through the sliding block to cut the plastic film, and the effect of conveniently cutting the plastic film is achieved.

Description

Construction roofing maintenance mechanism that ftractures
Technical Field
The utility model relates to the field of roof cracking maintenance, in particular to a building construction roof cracking maintenance mechanism.
Background
The house construction refers to projects with a top cover, beam columns, wall foundations and the capability of forming an inner space to meet the requirements of production, life and the like, and when a concrete building is constructed, the roof can be cracked due to rapid solidification of concrete, and in order to prevent the roof from cracking, a plastic film is required to be sprayed on the roof to preserve moisture of the roof, and then a roof cracking maintenance mechanism is required.
The existing roof cracking maintenance mechanism can be used when a plastic film is paved, and the plastic film needs to be cut off by workers, so that the working efficiency is reduced, the workload of the workers is increased, and the roof needs to be sprayed with water to wet when the plastic film is paved.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides a building construction roof cracking maintenance mechanism.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a construction roofing maintenance mechanism that ftractures, includes the platform, outer wall one side fixedly connected with mount of platform, the fixed orifices has been seted up to the inside of mount, the inner wall sliding connection of fixed orifices has fixing bolt, the outer wall of mount rotates and is connected with the second axis of rotation, the outer wall fixedly connected with first connecting plate of second axis of rotation, fixing bolt's outer wall threaded connection is inside first connecting plate, the first axis of rotation of outer wall one side fixedly connected with of first connecting plate, the outer wall one side rotation of first axis of rotation is connected with the second rotor, the outer wall sliding connection of second rotor has conveyer belt 12, the last fixedly connected with first support frame of first connecting plate, the outer wall one side sliding connection of first support frame has the slider, the lower surface fixedly connected with blade of slider.
As a further description of the above technical solution:
the upper surface fixedly connected with second support frame of platform, the opening inner wall of second support frame rotates and is connected with first rotating roller, the outer wall fixedly connected with plastic film of first rotating roller.
As a further description of the above technical solution:
the upper surface fixedly connected with water tank of platform, the water inlet has been seted up to the upper surface of water tank.
As a further description of the above technical solution:
the upper surface fixedly connected with water pump of water tank, the lower surface fixedly connected with drinking-water pipe of water pump.
As a further description of the above technical solution:
the output end of the water pump is fixedly connected with a first water pipe, and one end of the first water pipe is fixedly connected with a second water pipe.
As a further description of the above technical solution:
the outer wall fixedly connected with shower nozzle of second raceway, the outer wall fixedly connected with second connecting plate of second raceway, outer wall one side fixedly connected with of second connecting plate is in water tank outer wall one side.
As a further description of the above technical solution:
the upper surface fixedly connected with support column of platform, outer wall one side fixedly connected with handle of support column.
As a further description of the above technical solution:
the lower surface of the platform is fixedly connected with wheels.
The utility model has the following beneficial effects:
1. according to the utility model, the first connecting plate is driven to move through the second rotating shaft to enable the conveyor belt to be attached to the roof, the plastic film is attached to the conveyor belt, the second rotating roller is driven to rotate through movement of the device, the plastic film is paved on the roof to achieve the moisturizing effect, the blade is driven to move through the sliding block to cut the plastic film, and the effect of conveniently cutting the plastic film is achieved.
2. According to the utility model, the water in the water tank is conveyed into the second water conveying pipe through the water pump, and then the water is sprayed on the roof through the spray head so as to achieve the effect of wetting the roof and preventing cracking, and the handle is pushed to drive the wheels to rotate so as to enable the device to move, so that the effect of conveniently paving the plastic film is achieved.
Drawings
FIG. 1 is a perspective view of a construction roof cracking maintenance mechanism according to the present utility model;
FIG. 2 is a side view of a construction roof cracking maintenance mechanism according to the present utility model;
FIG. 3 is a schematic diagram of a conveyor belt for a construction roof cracking maintenance mechanism according to the present utility model;
fig. 4 is a water tank split view of a building construction roof cracking maintenance mechanism provided by the utility model.
Legend description:
1. a wheel; 2. a platform; 3. a support column; 4. a handle; 5. a water inlet; 6. a water tank; 7. a water pump; 8. a first water pipe; 9. a second water pipe; 10. a spray head; 11. a first support frame; 12. a conveyor belt; 13. a first rotating roller; 14. a second support frame; 15. a plastic film; 16. a fixing frame; 17. a fixed port; 18. a slide block; 19. a blade; 20. a second rotating roller; 21. a first connection plate; 22. a first rotation shaft; 23. a fixing bolt; 24. a second rotation shaft; 25. a second connecting plate; 26. a water pumping pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, one embodiment provided by the present utility model is: the utility model provides a construction roofing maintenance mechanism that ftractures, including platform 2, the outer wall one side fixedly connected with mount 16 of platform 2, the fixed orifices 17 has been seted up to the inside of mount 16, the inner wall sliding connection of fixed orifices 17 has fixing bolt 23, the outer wall rotation of mount 16 is connected with second axis of rotation 24, the first connecting plate 21 of outer wall fixedly connected with of second axis of rotation 24, fixing bolt 23's outer wall threaded connection is inside first connecting plate 21, drive first connecting plate 21 through the rotation of second axis of rotation 24 and remove, thereby make the laminating of conveyer belt 12 and roofing make plastic film 15 laminate on the roofing better, outer wall one side fixedly connected with first axis of rotation 22 of first connecting plate 21, outer wall one side rotation of first axis of rotation 22 is connected with second live-rollers 20, the outer wall sliding connection of second live-rollers 20 has conveyer belt 12, make it paste the surface at conveyer belt 12 through pulling plastic film 15, rotate through second live-rollers 20 and drive conveyer belt 12 and rotate, and then drive plastic film 15 and remove so as to apply it on the roofing, the last surface fixedly connected with first support frame 11, first support frame 11 has the slider 18 to cut off the outer wall one side, the slider 19 is connected with the slider 19 through the slider 19, the effect is reached through the slider 19.
The upper surface fixedly connected with second support frame 14 of platform 2, the opening inner wall of second support frame 14 rotates and is connected with first rotor 13, the outer wall fixedly connected with plastic film 15 of first rotor 13 places plastic film 15 in the opening of second support frame 14 through first rotor 13, the upper surface fixedly connected with water tank 6 of platform 2, water filling port 5 has been seted up to the upper surface of water tank 6, the upper surface fixedly connected with water pump 7 of water tank 6, the lower surface fixedly connected with suction pipe 26 of water pump 7, the first raceway 8 of output fixedly connected with of water pump 7, take out the water in the water tank 6 through suction pipe 26 through water pump 7, rethread water pump 7 carries water into first raceway 8 in, the one end fixedly connected with second raceway 9 of first raceway 8, the outer wall fixedly connected with shower nozzle 10 of second raceway 9 carries water into second raceway 9 in, rethread shower nozzle 10 sprays water on the upper surface of water tank 6, reach the effect that makes roofing moist prevent the fracture, the outer wall fixedly connected with second connecting plate 25 of second raceway 9 carries out the water pump 26, the handle fixedly connected with handle 3 on one side of the support column 3, the fixed connection of handle 3 is realized to the side of the support column 2, the fixed connection of handle 3, the outer wall 3 of side of support column 3 through the fixed connection of first raceway 8, thereby, the fixed surface of support column 1 is connected with the handle 3, the handle 3 is connected with the handle, and the handle is fixed.
Working principle: when the construction roof cracking maintenance mechanism is needed, firstly, the plastic film 15 is placed in the opening of the second supporting frame 14 through the first rotating roller 13, the plastic film 15 is pulled to be adhered to the surface of the conveying belt 12, the conveying belt 12 is driven to rotate through the rotation of the second rotating roller 20, the plastic film 15 is driven to move so as to be adhered to a roof, the blade 19 is driven to move through the sliding block 18, the effect of cutting off the plastic film 15 is achieved, the first connecting plate 21 is driven to move through the rotation of the second rotating shaft 24, the plastic film 15 is enabled to be better adhered to the roof through the adhesion of the conveying belt 12 and the roof, the moisturizing effect is achieved, the first connecting plate 21 is fixed through the rotation of the fixing bolt 23, the water in the water tank 6 is pumped out through the water pumping pipe 26, the water is conveyed into the first water pipe 8 through the water pumping pipe 7, the water is conveyed into the second water pipe 9 through the first water pipe 8, the water is sprayed on the roof through the spray nozzle 10, the effect of preventing the roof from cracking is achieved, the wheel 1 is enabled to be driven to move through the driving handle 4, and the water spraying effect of the plastic film 15 is achieved.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (8)

1. The utility model provides a construction roofing maintenance mechanism that ftractures, includes platform (2), its characterized in that: a fixing frame (16) is fixedly connected to one side of the outer wall of the platform (2), a fixing opening (17) is formed in the fixing frame (16), a fixing bolt (23) is slidably connected to the inner wall of the fixing opening (17), a second rotating shaft (24) is rotatably connected to the outer wall of the fixing frame (16), a first connecting plate (21) is fixedly connected to the outer wall of the second rotating shaft (24), the outer wall of the fixing bolt (23) is in threaded connection with the inner portion of the first connecting plate (21), the novel rotary machine is characterized in that a first rotating shaft (22) is fixedly connected to one side of the outer wall of the first connecting plate (21), a second rotating roller (20) is rotatably connected to one side of the outer wall of the first rotating shaft (22), a conveying belt (12) is slidably connected to the outer wall of the second rotating roller (20), a first supporting frame (11) is fixedly connected to the upper surface of the first connecting plate (21), a sliding block (18) is slidably connected to one side of the outer wall of the first supporting frame (11), and a blade (19) is fixedly connected to the lower surface of the sliding block (18).
2. The construction roof cracking maintenance mechanism according to claim 1, wherein: the upper surface fixedly connected with second support frame (14) of platform (2), the opening inner wall of second support frame (14) rotates and is connected with first rotating roller (13), the outer wall fixedly connected with plastic film (15) of first rotating roller (13).
3. The construction roof cracking maintenance mechanism according to claim 1, wherein: the upper surface of platform (2) fixedly connected with water tank (6), water inlet (5) have been seted up to the upper surface of water tank (6).
4. A construction roof cracking maintenance mechanism according to claim 3, wherein: the upper surface of the water tank (6) is fixedly connected with a water pump (7), and the lower surface of the water pump (7) is fixedly connected with a water suction pipe (26).
5. The construction roof cracking maintenance mechanism according to claim 4, wherein: the output end of the water pump (7) is fixedly connected with a first water pipe (8), and one end of the first water pipe (8) is fixedly connected with a second water pipe (9).
6. The building construction roof cracking maintenance mechanism according to claim 5, wherein: the outer wall fixedly connected with shower nozzle (10) of second raceway (9), the outer wall fixedly connected with second connecting plate (25) of second raceway (9), the outer wall one side fixedly connected with of second connecting plate (25) is in water tank (6) outer wall one side.
7. The construction roof cracking maintenance mechanism according to claim 1, wherein: the upper surface of platform (2) fixedly connected with support column (3), outer wall one side fixedly connected with handle (4) of support column (3).
8. The construction roof cracking maintenance mechanism according to claim 1, wherein: the lower surface of the platform (2) is fixedly connected with wheels (1).
CN202321218703.2U 2023-05-19 2023-05-19 Construction roofing maintenance mechanism that ftractures Active CN219711086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321218703.2U CN219711086U (en) 2023-05-19 2023-05-19 Construction roofing maintenance mechanism that ftractures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321218703.2U CN219711086U (en) 2023-05-19 2023-05-19 Construction roofing maintenance mechanism that ftractures

Publications (1)

Publication Number Publication Date
CN219711086U true CN219711086U (en) 2023-09-19

Family

ID=88001391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321218703.2U Active CN219711086U (en) 2023-05-19 2023-05-19 Construction roofing maintenance mechanism that ftractures

Country Status (1)

Country Link
CN (1) CN219711086U (en)

Similar Documents

Publication Publication Date Title
CN210045729U (en) Dust collector for building
CN219711086U (en) Construction roofing maintenance mechanism that ftractures
CN217128016U (en) Box girder multi-angle spraying and curing device for bridge construction
CN218476891U (en) Intelligent spraying system for natural curing of concrete prefabricated part
CN215107427U (en) Floating device of sewage treatment plant concrete deep basal pit
CN215166477U (en) Green building structure
CN215197701U (en) Automatic spraying device for waterproof materials
CN114892985A (en) Concrete maintenance device for construction
CN211436692U (en) Surface treatment equipment for multi-stage pump production
CN210264505U (en) Ground device of digging pit fast for building
CN216062531U (en) Dustproof watering device of building energy-saving construction
CN112496021A (en) Soil turning spraying type soil treatment equipment and soil treatment method
CN218715314U (en) Wall water spraying device for house construction engineering
CN221296741U (en) Curing means after concrete watering
CN219732801U (en) Prevent to take place accumulational concrete conveyer when unloading
CN214143201U (en) Curing means is used in concrete construction
CN217079723U (en) Concrete curing means based on construction
CN212660706U (en) Plant is planted and is used PVC pipe support structure
CN213533133U (en) Curing device for prefabricated part
CN217760162U (en) Concrete watering curing means that construction used
CN218815351U (en) Concrete curing means for construction
CN220425822U (en) Fireproof and anticorrosive coating device for steel structure
CN215241661U (en) Concrete water conservation curing means for building
CN216380600U (en) A concrete column device of moisturizing for building engineering
CN220705052U (en) Plastering machine for house building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant