CN219643598U - 一种电动机功率测试能量回收*** - Google Patents

一种电动机功率测试能量回收*** Download PDF

Info

Publication number
CN219643598U
CN219643598U CN202320725593.2U CN202320725593U CN219643598U CN 219643598 U CN219643598 U CN 219643598U CN 202320725593 U CN202320725593 U CN 202320725593U CN 219643598 U CN219643598 U CN 219643598U
Authority
CN
China
Prior art keywords
motor
power
alternating current
grid
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320725593.2U
Other languages
English (en)
Inventor
刘志壮
程文志
张文昭
杨凯翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dragon Totem Technology Hefei Co ltd
Senyao Energy Technology Shanghai Co ltd
Original Assignee
Hunan University of Science and Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Engineering filed Critical Hunan University of Science and Engineering
Priority to CN202320725593.2U priority Critical patent/CN219643598U/zh
Application granted granted Critical
Publication of CN219643598U publication Critical patent/CN219643598U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

该实用新型涉及一种电动机功率测试能量回收***,该***包括待测电动机(1)、交流发电机(2)、整流电路(3)和并网逆变器(4),待测电动机(1)接市电运转,其输出的动力带动交流发电机(2)转动发电,交流发电机(2)发的交流电送给整流电路(3)获得直流电,该直流电送给并网逆变器(4),并网逆变器(4)将直流电转换为可并网的交流电与市电并网,再回馈给待测电动机(1)使用。实现了能量的闭环使用,减小了能量的浪费。

Description

一种电动机功率测试能量回收***
技术领域
该实用新型涉及到机械与电子、电力技术,特别是将电能转换为机械能再转换为电能、直流与交流转换技术及逆变并网发电技术。
背景技术
电动机生产厂家常要对新生产的电动机在出厂前都要进行出力等性能测试,测试电动机出力的阻力装置常常是摩擦力或其它机械阻力,这些阻力装置常常是将这些机械能消耗掉转换为热能散发掉,造成较大的浪费,也给实验环境产生大量热量造成环境温升过高,为保持环境温度,又需要空调降温,造成二次能量消耗。为减小能量的浪费,设计一种功率测试能量回收***,将机械能发电并网,再次利用,降低能耗,降低厂家的生产成本,提高工厂的效益。同时增加社会效益,为早日实现“双碳”目标做出贡献。
发明内容
该实用新型为减小电动机功率测试的能量消耗,设计一种电动机功率测试能量回收***,该***包括待测电动机(1)、交流发电机(2)、整流电路(3)和并网逆变器(4),待测电动机(1)接市电运转,其输出的动力带动交流发电机(2)转动发电,交流发电机(2)发的交流电送给整流电路(3)获得直流电,该直流电送给并网逆变器(4),并网逆变器(4)将直流电转换为可并网的交流电与市电并网,再回馈给待测电动机(1)使用。待测电动机(1)将自身输出的动能通过齿轮或皮带传递给交流发电机(2)。交流发电机(2)采用三相交流发电机,且功率可调,即其阻力矩大小可调,可以根据待测电动机(1)的需要增大或减小交流发电机(2)的阻力,同时可以根据发电机输出的电压和电流大小来计算其输入功率和输出功率。整流电路(3)可将交流发电机(2)输出交流电整流成直流电。并网逆变器(4)是将整流电路输出的直流电转换为与市电同步的交流电,该交流电可以直接与市并网,再给待测电动机(1)供电。
该实用新型的有益效果是降低能耗,提高能量回收率,降低工厂成本,提高社会效益。
附图说明
图1为实用新型方框图,图2为单相电动机接线图,图3为整流电路原理图,图4为三相电动机接线图;
图1~图4中,1为待测电动机,2为交流发电机,3为整流电路,4为并网逆变器。
具体实施方式
该实用新型包括待测电动机(1)、交流发电机(2)、整流电路(3)和并网逆变器(4),待测电动机(1)接市电运转,其输出的动力带动交流发电机(2)转动发电,交流发电机(2)发的交流电送给整流电路(3)获得直流电,该直流电送给并网逆变器(4),并网逆变器(4)将直流电转换为可并网的交流电与市电并网,再回馈给待测电动机(1)使用。待测电动机(1)将自身输出的动能通过齿轮或皮带传递给交流发电机(2)。交流发电机(2)采用三相交流发电机,且功率可调,即其阻力矩大小可调,可以根据待测电动机(1)的需要增大或减小交流发电机(2)的阻力,同时可以根据发电机输出的电压和电流大小来计算其输入功率和输出功率。整流电路(3)可将交流发电机(2)输出交流电整流成直流电。并网逆变器(4)是将整流电路输出的直流电转换为与市电同步的交流电,该交流电可以直接与市并网,再给待测电动机(1)供电。
进一步,交流发电机(2)可以通过改变励磁电流来改变发电机功率,进而改变阻力矩大小,使交流发电机(2)产生待测电动机(1)所需要的阻力矩大小。
进一步,交流发电机(2)和并网逆变器(4)的功率大小根据所使用工厂最大电动机的功率来确定,约为最大电动机功率的90%即可。
具体实施例中,如图2所示,待测电动机(1)为单相电动机,需要单相交流电流供电(220V),所设计的并网逆变器(4)也单相并网逆变器。
具体实施例中,如图4所示,待测电动机(1)为三相交流电动机,需要三相交流供电(380V),所以并网逆变器(4)也采用三相交流逆变器。

Claims (5)

1.一种电动机功率测试能量回收***,其特征是包括待测电动机(1)、交流发电机(2)、整流电路(3)和并网逆变器(4),待测电动机(1)接市电运转,其输出的动力带动交流发电机(2)转动发电,交流发电机(2)发的交流电送给整流电路(3)获得直流电,该直流电送给并网逆变器(4),并网逆变器(4)将直流电转换为可并网的交流电与市电并网,再回馈给待测电动机(1)使用。
2.根据权利要求1所述的一种电动机功率测试能量回收***,其特征是待测电动机(1)将自身输出的动能通过齿轮或皮带传递给交流发电机(2)。
3.根据权利要求1所述的一种电动机功率测试能量回收***,其特征是交流发电机(2)采用三相交流发电机,且功率可调,即其阻力矩大小可调,可以根据待测电动机(1)的需要增大或减小交流发电机(2)的阻力,同时可以根据发电机输出的电压和电流大小来计算其输入功率和输出功率。
4.根据权利要求1所述的一种电动机功率测试能量回收***,其特征是整流电路(3)可将交流发电机(2)输出交流电整流成直流电。
5.根据权利要求1所述的一种电动机功率测试能量回收***,其特征是并网逆变器(4)是将整流电路输出的直流电转换为与市电同步的交流电,该交流电可以直接与市并网,再给待测电动机(1)供电。
CN202320725593.2U 2023-04-05 2023-04-05 一种电动机功率测试能量回收*** Active CN219643598U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320725593.2U CN219643598U (zh) 2023-04-05 2023-04-05 一种电动机功率测试能量回收***

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320725593.2U CN219643598U (zh) 2023-04-05 2023-04-05 一种电动机功率测试能量回收***

Publications (1)

Publication Number Publication Date
CN219643598U true CN219643598U (zh) 2023-09-05

Family

ID=87810651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320725593.2U Active CN219643598U (zh) 2023-04-05 2023-04-05 一种电动机功率测试能量回收***

Country Status (1)

Country Link
CN (1) CN219643598U (zh)

Similar Documents

Publication Publication Date Title
TWI380551B (en) Multi-input power converter system for hybrid renewable energy generation system
NZ599038A (en) An electrical power conversion system and method
EP3518368A1 (en) Wind power generation system and controlling method thereof
TW201305768A (zh) 可應用於風力發電之激磁式同步發電機最大功率追蹤控制方法
Barakat et al. Energetic macroscopic representation of a marine current turbine system with loss minimization control
SA519410373B1 (ar) نظام وطريقة لتوليد قدرة أسفل البئر
TW201249073A (en) Enclosed energy multi-circulation system and operating method thereof
CN219643598U (zh) 一种电动机功率测试能量回收***
WO2016101642A1 (zh) 空调***
CN202166139U (zh) 太阳能空调器
CN201903629U (zh) 交流变压型励磁同步风力发电实验装置
Sikorski et al. Cooperation of induction squirrel-cage generator with grid connected AC/DC/AC converter
CN205423064U (zh) 风力发电***
CN202488313U (zh) 谐波无刷交流发电机
Khan et al. Predictive permanent magnet synchronous generator based small-scale wind energy system at dynamic wind speed analysis for residential net-zero energy building
CN203705573U (zh) 一种节能型变频器负载测试设备
Saha et al. Design and Implementation of Automated Switching and Real-Time Monitoring of Hybrid Solar System
Allam et al. Load power and state-of-charge management strategy with MPPT of wind-driven isolated PMSG
CN105484941A (zh) 一种风力发电***
CN205882722U (zh) 一种具备储能装置的楼宇冷热电联产***
Ma et al. Feasibility research on DC generator based wind power generation system
Sivakumar et al. Design of Wind Solar and Pumped-Storage Hybrid Power Supply System
CN102790510A (zh) 节能型交直流循环发电***
Warongkidh An exercise bikes assisted main energy source in DC distributed power system
CN220156425U (zh) 一种户用光伏储能装置及***

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231128

Address after: 200092 Yangpu District, Shanghai, 100 Kwun Road, 2 level (centralized registration)

Patentee after: SENYAO ENERGY TECHNOLOGY (SHANGHAI) Co.,Ltd.

Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Dragon totem Technology (Hefei) Co.,Ltd.

Effective date of registration: 20231128

Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Dragon totem Technology (Hefei) Co.,Ltd.

Address before: 425199 130 Yang Zi Tang Road, Lingling District, Yongzhou, Hunan.

Patentee before: HUNAN University OF SCIENCE AND ENGINEERING